* test(#4130): failing-first regression for phase-prefixed decision IDs Add the #4130 matrix: D4-01/D12-01 across all three bullet forms, tags, discretion, wrapped lead-ins, gate-level plan/verify end-to-end rows, and parity properties (well-formed digit-prefixed ids parse to their exact id; a non-digit injected into the prefix fails loud). Update the #2347 non-D-prefix fixture from D5-NN (now a legal grammar) to DEC-NN, and graduate the representative d5-prefix corpus fixture from could-not-parse to parsed-but-uncovered. All new rows are RED against origin/next; they go green with the parser fix in the next commit. * fix(#4130): parse phase-prefixed decision IDs (D4-01) The three declaration grammars, the parse-miss guard, the #3939 join regexes, and the token evidence all anchored on the literal 'D-' (or '**D-'), so an ID carrying a digit-run phase prefix between the leading letter and the hyphen matched nothing — while the #2347 shape detector correctly called those bullets decision-shaped, collapsing the whole CONTEXT.md to could-not-parse with 0 extracted instead of a coverage verdict. Derive the extractor ID grammar from one shared DECISION_ID_SOURCE ('D[0-9]*-' + the existing alnum tail, full id captured), widen the guard/join anchors to ID_ATTEMPT_SOURCE (bare 'D-' or a digit-initial prefix run, so a typo'd 'D4x-01' fails loud while letter-initial prose like 'Deferred-until' stays none-present), and align the bare-token evidence. Both gates and the gap-checker share the parser, so all three surfaces read phase-prefixed decisions now; the gate messages name the accepted forms including the phase-prefixed one. * docs(#4130): document the phase-prefixed decision identifier form The canonical CONTEXT.md reference said decisions carry 'a sequential D-NN identifier' with no mention of the optional phase-number prefix the parser now accepts (D4-01) or the alphanumeric tail it always accepted (D-INFRA-01). Name both in the Decision identifier format section, EN and ja-JP. * chore(#4130): changeset * chore(#4130): backfill PR number in changeset --------- Co-authored-by: sim <sim@local>
This commit is contained in:
@@ -51,15 +51,24 @@ The body is divided into named XML-style blocks. The blocks appear in a fixed or
|
||||
|
||||
## Decision identifier format
|
||||
|
||||
Every decision in `<decisions>` carries a sequential `D-NN` identifier:
|
||||
Every decision in `<decisions>` carries a sequential `D-NN` identifier. An optional
|
||||
phase-number prefix may sit between the `D` and the hyphen (`D4-01`) — useful on
|
||||
multi-phase projects where bare `D-01` collides across phases; the digits are read
|
||||
as part of the identifier (#4130):
|
||||
|
||||
```markdown
|
||||
### Layout style
|
||||
- **D-01:** Card-based layout, not timeline or list
|
||||
- **D-02:** Each card shows: author avatar, name, timestamp, full post content, reaction counts
|
||||
|
||||
### Phase-4 decisions
|
||||
- **D4-01:** Phase-scoped identifier, distinct from any other phase's D-01
|
||||
```
|
||||
|
||||
Identifiers are scoped to the phase. `D-01` in Phase 3 is unrelated to `D-01` in Phase 7. The plan-checker (Dimension 7) verifies that every `D-NN` is addressed by at least one task action in the generated plans.
|
||||
Alphanumeric tails (`D-INFRA-01`) are also accepted. Identifiers are scoped to the
|
||||
phase. `D-01` in Phase 3 is unrelated to `D-01` in Phase 7. The plan-checker
|
||||
(Dimension 7) verifies that every decision identifier is addressed by at least one
|
||||
task action in the generated plans.
|
||||
|
||||
---
|
||||
|
||||
|
||||
Reference in New Issue
Block a user