enhance(#2115): replace bare eval with llm eval and drop ai system in the AI-integration gate (#3431)

* enhance(#2115): tighten AI-integration gate keywords per re-triage pin

Apply the maintainer-pinned scope from the 2026-07-31 re-triage on #2115
exactly: `eval` -> `llm eval`, `ai system` dropped, every other token and
the surrounding sentence byte-identical. Supersedes the stale-closed PR
#3131, whose broader whole-word-matching rework went beyond the pin.

* chore(#2115): set changeset fragment pr to 3431
This commit is contained in:
0xdhx
2026-08-14 11:33:12 -05:00
committed by GitHub
parent 08940c9071
commit 27cad971d0
2 changed files with 7 additions and 1 deletions

View File

@@ -0,0 +1,6 @@
---
type: Changed
pr: 3431
---
<!-- docs-exempt: internal prompt-precision change to the plan-phase workflow's AI-keyword gate; no docs surface documents the keyword list or the gate's trigger keywords (re-verified on next @ 7976b1ca0 — no docs/ file mentions the list's distinctive tokens) -->
**The `plan-phase` AI-integration capability gate no longer lists substring-collidable keywords** — bare `eval` (a substring of ordinary phase-goal words like `evaluation` and `retrieval`) is replaced by `llm eval`, and the under-specified `ai system` is dropped, per maintainer triage on the linked issue. The gate is a capability prompt, not a hard block, so this is a precision improvement: phase goals like "add evaluation metrics" or "build the retrieval layer" no longer invite a spurious AI-SPEC branch, and genuinely AI-flavored goals still match on the precise framework and technique names. (#2115)