* test(#2631): failing-first planner estimate emission and over-budget surfacing * feat(#2631): emit plan estimate and surface the over-budget split recommendation * fix(#2631): extract sizing prose to references to fit planner and plan-phase caps * fix(#2631): move estimate check to plan-checker; fix template regex and caps * fix(#2631): restore ALWAYS split literal and keep gsd_run after the launcher preamble * fix(#2631): invoke estimate-check after the launcher preamble in plan-checker * fix(#2631): stop double-applying calibration; repair COMMANDS table and stale reference * chore(#2631): backfill changeset pr to 2670 * chore(#2631): backfill changeset pr to 2670
This commit is contained in:
5
.changeset/noble-ravens-howl.md
Normal file
5
.changeset/noble-ravens-howl.md
Normal file
@@ -0,0 +1,5 @@
|
||||
---
|
||||
type: Added
|
||||
pr: 2670
|
||||
---
|
||||
**Plans now carry a calibrated effort estimate** — every generated PLAN.md includes an `estimate` block, and `/gsd-plan-phase` flags a phase projected to exceed the smart-zone budget with a concrete split recommendation. Advisory only; it never blocks planning. (#2631)
|
||||
Reference in New Issue
Block a user