feat(#2631): planner emits estimate and plan-checker surfaces the over-budget flag (#2670)

* test(#2631): failing-first planner estimate emission and over-budget surfacing

* feat(#2631): emit plan estimate and surface the over-budget split recommendation

* fix(#2631): extract sizing prose to references to fit planner and plan-phase caps

* fix(#2631): move estimate check to plan-checker; fix template regex and caps

* fix(#2631): restore ALWAYS split literal and keep gsd_run after the launcher preamble

* fix(#2631): invoke estimate-check after the launcher preamble in plan-checker

* fix(#2631): stop double-applying calibration; repair COMMANDS table and stale reference

* chore(#2631): backfill changeset pr to 2670

* chore(#2631): backfill changeset pr to 2670
This commit is contained in:
Tom Boucher
2026-07-26 14:29:02 -04:00
committed by GitHub
parent 115433bba6
commit 89b673e40d
29 changed files with 371 additions and 85 deletions

View File

@@ -252,6 +252,19 @@ issue:
1. Count tasks per plan
2. Estimate files modified per plan
3. Check against thresholds
4. **Smart-zone estimate check (#2631, ADR-2629).** For each plan carrying an `estimate` block, run the
`estimate-check --calibrated` verb against its `estimate.tokens` (the `--calibrated` flag is required —
the plan's figure already has the factor applied, and omitting it would square the correction) (invoked in Step 1 below, after the launcher
preamble). The verb reads `workflow.smart_zone_tokens` and applies the project's calibration. Report
one line per plan: plan id, estimated tokens, the budget, and — when `over_budget` is true — the
returned `recommendation`, which names how many slices the phase should become.
**Over budget is a WARNING, never a blocker** (ADR-2629 Decision 5). Recommend re-slicing into a tracer
plus expansion slices; never fail the check on it. Report `estimate.confidence` alongside: `low` means
fewer than 3 completed phases carry actuals, so the figure is not yet calibrated for this project — say
so rather than presenting it as precise, and weigh the task/file thresholds above more heavily.
A plan with no `estimate` block is not a defect; the field is optional and additive.
**Thresholds:**
| Metric | Target | Warning | Blocker |
@@ -706,6 +719,13 @@ gsd_run query phase.list-plans "$phase_number"
gsd_run query phase.list-artifacts "$phase_number" --type research
gsd_run query roadmap.get-phase "$phase_number"
gsd_run query phase.list-artifacts "$phase_number" --type summary
# Smart-zone estimate check (#2631) — advisory, never fails the check.
for plan in "${phase_dir:-$PHASE_DIR}"/*-PLAN.md; do
[ -f "$plan" ] || continue # unmatched glob leaves the literal pattern — skip it
EST=$(sed -n '/^estimate:/,/^[a-z_]*:/p' "$plan" | grep -o 'tokens: *[0-9]*' | head -1 | grep -o '[0-9]*')
[ -n "$EST" ] && gsd_run query estimate-check --tokens "$EST" --calibrated 2>/dev/null || true
done
```
**Extract:** Phase goal, requirements (decompose goal), locked decisions, deferred ideas.