* test(#2631): failing-first planner estimate emission and over-budget surfacing * feat(#2631): emit plan estimate and surface the over-budget split recommendation * fix(#2631): extract sizing prose to references to fit planner and plan-phase caps * fix(#2631): move estimate check to plan-checker; fix template regex and caps * fix(#2631): restore ALWAYS split literal and keep gsd_run after the launcher preamble * fix(#2631): invoke estimate-check after the launcher preamble in plan-checker * fix(#2631): stop double-applying calibration; repair COMMANDS table and stale reference * chore(#2631): backfill changeset pr to 2670 * chore(#2631): backfill changeset pr to 2670
This commit is contained in:
@@ -83,3 +83,43 @@ Either list works — `enabledMcpjsonServers` is an explicit allow-list, `disabl
|
||||
### Composition with model_profile
|
||||
|
||||
Trimming MCPs and tuning `model_profile` are independent levers that **compound**. Disabling a 25k-token MCP saves 25k per turn whether you're running `quality` (opus everywhere) or `budget` (sonnet/haiku); the savings are additive, not in lieu of model tuning. Don't pick one — do both, and audit MCPs first because the per-turn savings show up immediately and stack across every subagent the orchestrator spawns.
|
||||
|
||||
---
|
||||
|
||||
# Phase Sizing (gsd-planner)
|
||||
|
||||
## Estimate Emission (#2631, ADR-2629)
|
||||
|
||||
Every plan carries an `estimate` block. It is the quantitative reason a phase must be sliced — tracer-first says *slice thin*, the estimate says *how thin, for this codebase*.
|
||||
|
||||
**Compute it:**
|
||||
1. Sum `estimateTokens`-scale cost across the plan: implementation + the files each task reads + verification output. Roughly chars/4 over what the executor will actually touch.
|
||||
2. Run `estimate-calibration` and **multiply your raw figure by its `factor`.** It is the measured estimate-vs-actual ratio for THIS project — a factor of 1 means there is not yet enough history to correct.
|
||||
3. `confidence` is **derived, not judged**: it is the `confidence` value from the same calibration query, keyed to the sample count (`low` <3, `med` 3–5, `high` ≥6). **Do not rate your own certainty.** Self-rated confidence was measured in this project and found weak (`references/honest-verifier.md:25-29`); every signal here routes on measured history instead.
|
||||
|
||||
**Over budget?** The plan-checker flags a plan whose estimate exceeds `workflow.smart_zone_tokens`. This is advisory — it never blocks. When flagged, re-slice: a tracer plus expansion slices, each inside the budget. Prefer more, smaller plans over one that spends the agent's best early-context tokens and finishes degraded.
|
||||
|
||||
## Context Budget Rules
|
||||
|
||||
Plans should complete within ~50% context (not 80%). No context anxiety, quality maintained start to finish, room for unexpected complexity.
|
||||
|
||||
**Each plan: 2-3 tasks maximum.**
|
||||
|
||||
| Context Weight | Tasks/Plan | Context/Task | Total |
|
||||
|----------------|------------|--------------|-------|
|
||||
| Light (CRUD, config) | 3 | ~10-15% | ~30-45% |
|
||||
| Medium (auth, payments) | 2 | ~20-30% | ~40-50% |
|
||||
| Heavy (migrations, multi-subsystem) | 1-2 | ~30-40% | ~30-50% |
|
||||
|
||||
## Split Signals
|
||||
|
||||
**ALWAYS split if:**
|
||||
- More than 3 tasks
|
||||
- Multiple subsystems (DB + API + UI = separate plans)
|
||||
- Any task with >5 file modifications
|
||||
- Checkpoint + implementation in same plan
|
||||
- Discovery + implementation in same plan
|
||||
|
||||
**CONSIDER splitting:** >5 files total, natural semantic boundaries, context cost estimate exceeds 40% for a single plan. See `<planner_authority_limits>` for prohibited split reasons.
|
||||
|
||||
See @~/.claude/gsd-core/references/planner-guidance.md for Granularity Calibration table (Coarse/Standard/Fine plans-per-phase).
|
||||
|
||||