fix(claude): restore namespaced /gsd:<command> references (#3452)
* fix(claude): restore namespaced /gsd:<command> references * test(claude): align slash-command expectations to /gsd: form * test(claude): align generated command references to /gsd: * test(claude): finish /gsd: namespace expectation updates
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
---
|
||||
name: gsd-plan-checker
|
||||
description: Verifies plans will achieve phase goal before execution. Goal-backward analysis of plan quality. Spawned by /gsd-plan-phase orchestrator.
|
||||
description: Verifies plans will achieve phase goal before execution. Goal-backward analysis of plan quality. Spawned by /gsd:plan-phase orchestrator.
|
||||
tools: Read, Bash, Glob, Grep
|
||||
color: green
|
||||
---
|
||||
@@ -8,7 +8,7 @@ color: green
|
||||
<role>
|
||||
A set of phase plans has been submitted for pre-execution review. Verify they WILL achieve the phase goal — do not credit effort or intent, only verifiable coverage.
|
||||
|
||||
Spawned by `/gsd-plan-phase` orchestrator (after planner creates PLAN.md) or re-verification (after planner revises).
|
||||
Spawned by `/gsd:plan-phase` orchestrator (after planner creates PLAN.md) or re-verification (after planner revises).
|
||||
|
||||
Goal-backward verification of PLANS before execution. Start from what the phase SHOULD deliver, verify plans address it.
|
||||
|
||||
@@ -64,7 +64,7 @@ This ensures verification checks that plans follow project-specific conventions.
|
||||
</project_context>
|
||||
|
||||
<upstream_input>
|
||||
**CONTEXT.md** (if exists) — User decisions from `/gsd-discuss-phase`
|
||||
**CONTEXT.md** (if exists) — User decisions from `/gsd:discuss-phase`
|
||||
|
||||
| Section | How You Use It |
|
||||
|---------|----------------|
|
||||
@@ -299,7 +299,7 @@ issue:
|
||||
|
||||
## Dimension 7: Context Compliance (if CONTEXT.md exists)
|
||||
|
||||
**Question:** Do plans honor user decisions from /gsd-discuss-phase?
|
||||
**Question:** Do plans honor user decisions from /gsd:discuss-phase?
|
||||
|
||||
**Only check if CONTEXT.md was provided in the verification context.**
|
||||
|
||||
@@ -447,7 +447,7 @@ Before running checks 8a-8d, verify VALIDATION.md exists:
|
||||
ls "${PHASE_DIR}"/*-VALIDATION.md 2>/dev/null
|
||||
```
|
||||
|
||||
**If missing:** **BLOCKING FAIL** — "VALIDATION.md not found for phase {N}. Re-run `/gsd-plan-phase {N} --research` to regenerate."
|
||||
**If missing:** **BLOCKING FAIL** — "VALIDATION.md not found for phase {N}. Re-run `/gsd:plan-phase {N} --research` to regenerate."
|
||||
Skip checks 8a-8d entirely. Report Dimension 8 as FAIL with this single issue.
|
||||
|
||||
**If exists:** Proceed to checks 8a-8d.
|
||||
@@ -897,7 +897,7 @@ Return all issues as a structured `issues:` YAML list (see dimension examples fo
|
||||
| 01 | 3 | 5 | 1 | Valid |
|
||||
| 02 | 2 | 4 | 2 | Valid |
|
||||
|
||||
Plans verified. Run `/gsd-execute-phase {phase}` to proceed.
|
||||
Plans verified. Run `/gsd:execute-phase {phase}` to proceed.
|
||||
```
|
||||
|
||||
## ISSUES FOUND
|
||||
|
||||
Reference in New Issue
Block a user