* fix(#2390): phase.add title warning + auto-detect doc fix phase.add now returns a `warning` field when a description reads as goal-shaped (>80 chars and/or multi-sentence) rather than title-shaped, instead of silently writing the whole paragraph verbatim as the `### Phase N:` header. The CLI still creates the phase as-is (the strict two-layer slash-vs-CLI interface is unchanged); the warning just surfaces the gap. Also clarifies six doc sites (command argument hints, workflow detection steps, and how-to/reference docs) that described the phase-number argument as "auto-detecting" the next unplanned phase -- that detection is an orchestrating-workflow/LLM step reading ROADMAP.md (concretely: `query roadmap.analyze`'s `next_phase` field), not a `gsd-tools.cjs` CLI feature. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> * chore(#2390): regenerate fixtures + lint gate-prep * fix(#2390): repair failing tests after gate verification * chore(#2390): add changeset (#2425) --------- Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -1,9 +1,9 @@
|
||||
{
|
||||
"add-backlog.md": 7176,
|
||||
"add-phase.md": 7247,
|
||||
"add-phase.md": 7578,
|
||||
"add-tests.md": 16961,
|
||||
"add-todo.md": 10734,
|
||||
"ai-integration-phase.md": 14805,
|
||||
"ai-integration-phase.md": 15134,
|
||||
"analyze-dependencies.md": 3887,
|
||||
"audit-fix.md": 11723,
|
||||
"audit-milestone.md": 18448,
|
||||
@@ -53,7 +53,7 @@
|
||||
"onboard.md": 8590,
|
||||
"pause-work.md": 14441,
|
||||
"plan-milestone-gaps.md": 11809,
|
||||
"plan-phase.md": 93959,
|
||||
"plan-phase.md": 94387,
|
||||
"plan-review-convergence.md": 23713,
|
||||
"plant-seed.md": 11785,
|
||||
"pr-branch.md": 15963,
|
||||
|
||||
Reference in New Issue
Block a user