diff --git a/.planning/STATE.md b/.planning/STATE.md index 3a11f40a1..8ea2ffdce 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -20,18 +20,18 @@ ## Current Position Phase: 16 of 16 (Plan Verification Loop) -Plan: 0 of 3 in current phase -Status: Planned -Last activity: 2026-01-16 - Phase 16 planned (3 plans in 2 waves) +Plan: 1 of 3 in current phase +Status: In progress +Last activity: 2026-01-16 - Completed 16-01-PLAN.md -Progress: ██████████████████████████████ 36/36 plans (100%) +Progress: █████████████████████████████████████ 37/39 plans (95%) ## Performance Metrics **Velocity:** -- Total plans completed: 36 +- Total plans completed: 37 - Average duration: 3.4 min -- Total execution time: ~122 min +- Total execution time: ~125 min **By Phase:** @@ -52,9 +52,10 @@ Progress: ███████████████████████ | 13 | 3 | 10 min | 3.3 min | | 14 | 3 | 11 min | 3.7 min | | 15 | 3 | 7 min | 2.3 min | +| 16 | 1 | 3 min | 3 min | **Recent Trend:** -- Last 5 plans: 14-03 (3m), 15-01 (5m), 15-02 (3m), 15-03 (1m) +- Last 5 plans: 15-01 (5m), 15-02 (3m), 15-03 (1m), 16-01 (3m) - Trend: Consistent execution times *Updated after each plan completion* @@ -92,6 +93,8 @@ Progress: ███████████████████████ | 15 | Deprecation notices point to specific agent sections | Planning references deprecated, content in gsd-planner | | 15 | 189 lines thin orchestrator for /gsd:plan-phase | Under 200 target, uses agent: gsd-planner frontmatter | | 15 | Context-only planner-subagent-prompt.md template | Follows debug/research template pattern | +| 16 | Six verification dimensions | Coverage, completeness, dependencies, links, scope, derivation | +| 16 | Checker verifies plans WILL achieve goal | Same methodology as verifier but applied to plans pre-execution | ### Deferred Issues @@ -127,5 +130,5 @@ Drift notes: None ## Session Continuity Last session: 2026-01-16 -Stopped at: Completed 15-03-PLAN.md +Stopped at: Completed 16-01-PLAN.md Resume file: None diff --git a/.planning/phases/16-plan-verification-loop/16-01-SUMMARY.md b/.planning/phases/16-plan-verification-loop/16-01-SUMMARY.md new file mode 100644 index 000000000..925732cf7 --- /dev/null +++ b/.planning/phases/16-plan-verification-loop/16-01-SUMMARY.md @@ -0,0 +1,102 @@ +--- +phase: 16-plan-verification-loop +plan: 01 +subsystem: agents +tags: [verification, planning, goal-backward, plan-checker] + +# Dependency graph +requires: + - phase: 15-dedicated-planner-agent + provides: gsd-planner agent to create plans +provides: + - gsd-plan-checker agent for plan verification before execution + - Six verification dimensions (coverage, completeness, dependencies, links, scope, derivation) + - Structured issue format for planner feedback loop +affects: [16-plan-verification-loop, plan-phase, execute-phase] + +# Tech tracking +tech-stack: + added: [] + patterns: + - "Goal-backward plan verification (plans, not code)" + - "Structured issue reporting with fix hints" + - "Checker role mirrors verifier (verify plans vs verify code)" + +key-files: + created: + - agents/gsd-plan-checker.md + modified: [] + +key-decisions: + - "Six dimensions: coverage, completeness, dependencies, links, scope, derivation" + - "Structured YAML issue format for planner consumption" + - "Checker returns passed or issues_found status" + +patterns-established: + - "Plan checker verifies BEFORE execution (vs verifier verifies AFTER)" + - "Same goal-backward methodology as gsd-verifier but applied to plans" + +# Metrics +duration: 3min +completed: 2026-01-16 +--- + +# Phase 16 Plan 01: Create gsd-plan-checker Agent Summary + +**Goal-backward plan verification agent with six dimensions: coverage, completeness, dependencies, links, scope, and derivation** + +## Performance + +- **Duration:** 3 min +- **Started:** 2026-01-16T14:54:04Z +- **Completed:** 2026-01-16T14:56:57Z +- **Tasks:** 2 +- **Files modified:** 1 + +## Accomplishments + +- Created gsd-plan-checker agent with complete plan verification methodology +- Six verification dimensions covering all aspects of plan quality +- Structured issue format that planner can consume for revisions +- Four example scenarios demonstrating common failure modes + +## Task Commits + +Each task was committed atomically: + +1. **Task 1+2: Create gsd-plan-checker with examples** - `47eab1a` (feat) + - Combined task: created agent with all sections including examples + +**Plan metadata:** (pending) + +## Files Created/Modified + +- `agents/gsd-plan-checker.md` - Plan verification agent (744 lines) + +## Decisions Made + +- **Six verification dimensions:** Coverage, completeness, dependencies, key links, scope, derivation - comprehensive without overlap +- **Structured YAML issues:** Format allows planner to programmatically parse and address +- **Checker vs Verifier distinction:** Clear - checker verifies plans WILL achieve goal, verifier verifies code DID achieve goal + +## Deviations from Plan + +None - plan executed as written (Task 2's examples section was included in Task 1 creation for efficiency). + +## Issues Encountered + +None + +## User Setup Required + +None - no external service configuration required. + +## Next Phase Readiness + +- gsd-plan-checker agent ready for integration +- Next: 16-02 updates plan-phase.md orchestrator to spawn checker after planner +- Next: 16-03 adds revision mode to gsd-planner for handling checker feedback + +--- +*Phase: 16-plan-verification-loop* +*Completed: 2026-01-16*