docs(15-01): complete create gsd-planner agent plan
Tasks completed: 2/2 - Task 1: Create gsd-planner agent file (1,147 lines) - Task 2: Verify agent completeness (all 14 sections present) SUMMARY: .planning/phases/15-dedicated-planner-agent/15-01-SUMMARY.md
This commit is contained in:
@@ -19,19 +19,19 @@
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 14 of 14 (Researcher Agent)
|
Phase: 15 of 15 (Dedicated Planner Agent)
|
||||||
Plan: 3 of 3 in current phase
|
Plan: 1 of 2 in current phase
|
||||||
Status: Complete
|
Status: In progress
|
||||||
Last activity: 2026-01-15 - Completed 14-03-PLAN.md
|
Last activity: 2026-01-16 - Completed 15-01-PLAN.md
|
||||||
|
|
||||||
Progress: ████████████████████████████ 33/33 plans (100%)
|
Progress: ██████████████████████████████ 34/35 plans (97%)
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
- Total plans completed: 33
|
- Total plans completed: 34
|
||||||
- Average duration: 3.5 min
|
- Average duration: 3.5 min
|
||||||
- Total execution time: ~115 min
|
- Total execution time: ~120 min
|
||||||
|
|
||||||
**By Phase:**
|
**By Phase:**
|
||||||
|
|
||||||
@@ -51,9 +51,10 @@ Progress: ███████████████████████
|
|||||||
| 99 | 3 | 1 min | <1 min (parallel) |
|
| 99 | 3 | 1 min | <1 min (parallel) |
|
||||||
| 13 | 3 | 10 min | 3.3 min |
|
| 13 | 3 | 10 min | 3.3 min |
|
||||||
| 14 | 3 | 11 min | 3.7 min |
|
| 14 | 3 | 11 min | 3.7 min |
|
||||||
|
| 15 | 1 | 5 min | 5 min |
|
||||||
|
|
||||||
**Recent Trend:**
|
**Recent Trend:**
|
||||||
- Last 5 plans: 13-03 (4m), 14-01 (4m), 14-02 (4m), 14-03 (3m)
|
- Last 5 plans: 14-01 (4m), 14-02 (4m), 14-03 (3m), 15-01 (5m)
|
||||||
- Trend: Consistent execution times
|
- Trend: Consistent execution times
|
||||||
|
|
||||||
*Updated after each plan completion*
|
*Updated after each plan completion*
|
||||||
@@ -86,6 +87,8 @@ Progress: ███████████████████████
|
|||||||
| 14 | 902 lines from ~1,200 source (25% reduction) | Preserved all concepts while removing redundancy |
|
| 14 | 902 lines from ~1,200 source (25% reduction) | Preserved all concepts while removing redundancy |
|
||||||
| 14 | Thin orchestrator for /gsd:research-phase | Orchestrator 130 lines, expertise in agent |
|
| 14 | Thin orchestrator for /gsd:research-phase | Orchestrator 130 lines, expertise in agent |
|
||||||
| 14 | Parallel agent spawning for /gsd:research-project | 4 agents (stack, features, architecture, pitfalls) maximize throughput |
|
| 14 | Parallel agent spawning for /gsd:research-project | 4 agents (stack, features, architecture, pitfalls) maximize throughput |
|
||||||
|
| 15 | 1,147 lines from ~3,580 source (68% reduction) | Complete planning methodology consolidated into single agent |
|
||||||
|
| 15 | 14 sections covering full planning workflow | Includes discovery, task breakdown, dependency graph, goal-backward, checkpoints, TDD, gap closure |
|
||||||
|
|
||||||
### Deferred Issues
|
### Deferred Issues
|
||||||
|
|
||||||
@@ -108,16 +111,17 @@ None yet.
|
|||||||
- Phase 12 added: Changelog & update awareness (remote changelog fetch, /gsd:whats-new, publish workflow integration)
|
- Phase 12 added: Changelog & update awareness (remote changelog fetch, /gsd:whats-new, publish workflow integration)
|
||||||
- Phase 13 added: Dedicated debug agent (gsd-debugger with baked-in expertise, thin orchestrator pattern)
|
- Phase 13 added: Dedicated debug agent (gsd-debugger with baked-in expertise, thin orchestrator pattern)
|
||||||
- Phase 14 added: Dedicated researcher agent (gsd-researcher with research methodology, tool strategy, output formats)
|
- Phase 14 added: Dedicated researcher agent (gsd-researcher with research methodology, tool strategy, output formats)
|
||||||
|
- Phase 15 added: Dedicated planner agent (gsd-planner with planning expertise, refactor plan-phase to thin orchestrator)
|
||||||
|
|
||||||
## Project Alignment
|
## Project Alignment
|
||||||
|
|
||||||
Last checked: 2026-01-15
|
Last checked: 2026-01-16
|
||||||
Status: COMPLETE
|
Status: IN PROGRESS
|
||||||
Assessment: All 33 plans executed successfully across 14 phases.
|
Assessment: Phase 15 Plan 01 complete, Plan 02 (thin orchestrator refactor) remaining.
|
||||||
Drift notes: None
|
Drift notes: None
|
||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-01-15
|
Last session: 2026-01-16
|
||||||
Stopped at: Completed 14-03-PLAN.md (final plan)
|
Stopped at: Completed 15-01-PLAN.md
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
106
.planning/phases/15-dedicated-planner-agent/15-01-SUMMARY.md
Normal file
106
.planning/phases/15-dedicated-planner-agent/15-01-SUMMARY.md
Normal file
@@ -0,0 +1,106 @@
|
|||||||
|
---
|
||||||
|
phase: 15
|
||||||
|
plan: 01
|
||||||
|
subsystem: agents
|
||||||
|
tags: [planner, agent, planning, methodology]
|
||||||
|
|
||||||
|
dependency-graph:
|
||||||
|
requires: [13, 14]
|
||||||
|
provides: [gsd-planner-agent, consolidated-planning-methodology]
|
||||||
|
affects: [future-plan-phase-refactor]
|
||||||
|
|
||||||
|
tech-stack:
|
||||||
|
added: []
|
||||||
|
patterns: [consolidated-agent, thin-orchestrator-pattern]
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created: [agents/gsd-planner.md]
|
||||||
|
modified: []
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "14 sections covering complete planning workflow"
|
||||||
|
- "1,147 lines consolidated from ~3,580 lines of source material"
|
||||||
|
- "Follows gsd-debugger/gsd-researcher pattern"
|
||||||
|
|
||||||
|
metrics:
|
||||||
|
duration: "5 min"
|
||||||
|
completed: "2026-01-16"
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 15 Plan 01: Create gsd-planner Agent Summary
|
||||||
|
|
||||||
|
**One-liner:** Consolidated ~3,580 lines of planning references into 1,147-line dedicated agent following gsd-debugger/gsd-researcher pattern.
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
|
||||||
|
1. **Created gsd-planner agent file** (`agents/gsd-planner.md`)
|
||||||
|
- Complete planning methodology baked into single agent file
|
||||||
|
- 1,147 lines (within 800-1200 target)
|
||||||
|
- 14 sections covering full planning workflow
|
||||||
|
- Follows established agent patterns from Phase 13-14
|
||||||
|
|
||||||
|
2. **Consolidated planning methodology from source files:**
|
||||||
|
- `references/principles.md` - Solo developer + Claude workflow philosophy
|
||||||
|
- `workflows/plan-phase.md` - Full execution flow with 16 steps
|
||||||
|
- `templates/phase-prompt.md` - PLAN.md structure and frontmatter
|
||||||
|
- `references/plan-format.md` - Task anatomy and types
|
||||||
|
- `references/scope-estimation.md` - Context budget and split signals
|
||||||
|
- `references/checkpoints.md` - Checkpoint types and authentication gates
|
||||||
|
- `references/tdd.md` - TDD detection and plan structure
|
||||||
|
- `references/goal-backward.md` - Must-haves derivation process
|
||||||
|
|
||||||
|
3. **Agent sections implemented:**
|
||||||
|
- `<role>` - Planning agent identity and responsibilities
|
||||||
|
- `<philosophy>` - Plans are prompts, quality degradation curve, ship fast
|
||||||
|
- `<discovery_levels>` - Levels 0-3 with triggers
|
||||||
|
- `<task_breakdown>` - Task anatomy, types, TDD detection
|
||||||
|
- `<dependency_graph>` - Wave analysis, vertical slices
|
||||||
|
- `<scope_estimation>` - Context budget, split signals, depth calibration
|
||||||
|
- `<plan_format>` - PLAN.md structure, frontmatter schema
|
||||||
|
- `<goal_backward>` - Truths, artifacts, key_links derivation
|
||||||
|
- `<checkpoints>` - Types, authentication gates, anti-patterns
|
||||||
|
- `<tdd_integration>` - When to use, plan structure, RED-GREEN-REFACTOR
|
||||||
|
- `<gap_closure_mode>` - Planning from verification gaps
|
||||||
|
- `<execution_flow>` - 16 steps from load_project_state to offer_next
|
||||||
|
- `<structured_returns>` - PLANNING COMPLETE, CHECKPOINT REACHED formats
|
||||||
|
- `<success_criteria>` - Standard mode and gap closure mode checklists
|
||||||
|
|
||||||
|
## Technical Details
|
||||||
|
|
||||||
|
**Source material (~3,580 lines):**
|
||||||
|
- principles.md: ~73 lines
|
||||||
|
- plan-phase.md: ~868 lines
|
||||||
|
- phase-prompt.md: ~575 lines
|
||||||
|
- plan-format.md: ~474 lines
|
||||||
|
- scope-estimation.md: ~257 lines
|
||||||
|
- checkpoints.md: ~789 lines
|
||||||
|
- tdd.md: ~264 lines
|
||||||
|
- goal-backward.md: ~287 lines
|
||||||
|
|
||||||
|
**Consolidation result:**
|
||||||
|
- 1,147 lines (68% reduction from source material)
|
||||||
|
- Preserved all critical concepts
|
||||||
|
- Eliminated redundancy between source files
|
||||||
|
- Kept concise examples for each concept
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
None - plan executed exactly as written.
|
||||||
|
|
||||||
|
## Commits
|
||||||
|
|
||||||
|
| Commit | Type | Description |
|
||||||
|
|--------|------|-------------|
|
||||||
|
| 1f45bef | feat | Create gsd-planner agent file |
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
|
||||||
|
**Ready for Plan 15-02:** Refactor plan-phase.md to thin orchestrator
|
||||||
|
- gsd-planner agent contains all planning expertise
|
||||||
|
- plan-phase.md can be reduced to ~200 lines orchestrator
|
||||||
|
- Will spawn gsd-planner subagent for actual planning work
|
||||||
|
|
||||||
|
**Dependencies satisfied:**
|
||||||
|
- Agent file exists and is complete
|
||||||
|
- All 14 sections verified present
|
||||||
|
- Follows established pattern from gsd-debugger/gsd-researcher
|
||||||
Reference in New Issue
Block a user