refactor: update commands, workflows, agents for gsd-tools integration

Commands (15): audit-milestone, complete-milestone, debug, execute-phase,
help, insert-phase, new-milestone, new-project, plan-milestone-gaps,
plan-phase, progress, quick, remove-phase, research-phase, verify-work

Workflows (22): execute-plan (69% reduction), verify-phase (55%), others
Agents (14): All updated for new workflow structure

Total token savings: ~22k chars (75.6% in affected sections)

Ported from: get-shit-done-v2@d1fb2d5, 7f79a9b
This commit is contained in:
TÂCHES
2026-02-07 11:08:45 -06:00
parent d2623e0114
commit d44c7dcc9b
44 changed files with 4941 additions and 10374 deletions

View File

@@ -11,7 +11,6 @@ allowed-tools:
- Write
- Task
---
<objective>
Validate built features through conversational testing with persistent state.
@@ -35,185 +34,6 @@ Phase: $ARGUMENTS (optional)
</context>
<process>
1. Check for active UAT sessions (resume or start new)
2. Find SUMMARY.md files for the phase
3. Extract testable deliverables (user-observable outcomes)
4. Create {phase}-UAT.md with test list
5. Present tests one at a time:
- Show expected behavior
- Wait for plain text response
- "yes/y/next" = pass, anything else = issue (severity inferred)
6. Update UAT.md after each response
7. On completion: commit, present summary
8. If issues found:
- Spawn parallel debug agents to diagnose root causes
- Spawn gsd-planner in --gaps mode to create fix plans
- Spawn gsd-plan-checker to verify fix plans
- Iterate planner ↔ checker until plans pass (max 3)
- Present ready status with `/clear` then `/gsd:execute-phase`
Execute the verify-work workflow from @~/.claude/get-shit-done/workflows/verify-work.md end-to-end.
Preserve all workflow gates (session management, test presentation, diagnosis, fix planning, routing).
</process>
<anti_patterns>
- Don't use AskUserQuestion for test responses — plain text conversation
- Don't ask severity — infer from description
- Don't present full checklist upfront — one test at a time
- Don't run automated tests — this is manual user validation
- Don't fix issues during testing — log as gaps, diagnose after all tests complete
</anti_patterns>
<offer_next>
Output this markdown directly (not as a code block). Route based on UAT results:
| Status | Route |
|--------|-------|
| All tests pass + more phases | Route A (next phase) |
| All tests pass + last phase | Route B (milestone complete) |
| Issues found + fix plans ready | Route C (execute fixes) |
| Issues found + planning blocked | Route D (manual intervention) |
---
**Route A: All tests pass, more phases remain**
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
GSD ► PHASE {Z} VERIFIED ✓
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
**Phase {Z}: {Name}**
{N}/{N} tests passed
UAT complete ✓
───────────────────────────────────────────────────────────────
## ▶ Next Up
**Phase {Z+1}: {Name}** — {Goal from ROADMAP.md}
/gsd:discuss-phase {Z+1} — gather context and clarify approach
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
**Also available:**
- /gsd:plan-phase {Z+1} — skip discussion, plan directly
- /gsd:execute-phase {Z+1} — skip to execution (if already planned)
───────────────────────────────────────────────────────────────
---
**Route B: All tests pass, milestone complete**
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
GSD ► PHASE {Z} VERIFIED ✓
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
**Phase {Z}: {Name}**
{N}/{N} tests passed
Final phase verified ✓
───────────────────────────────────────────────────────────────
## ▶ Next Up
**Audit milestone** — verify requirements, cross-phase integration, E2E flows
/gsd:audit-milestone
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
**Also available:**
- /gsd:complete-milestone — skip audit, archive directly
───────────────────────────────────────────────────────────────
---
**Route C: Issues found, fix plans ready**
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
GSD ► PHASE {Z} ISSUES FOUND ⚠
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
**Phase {Z}: {Name}**
{N}/{M} tests passed
{X} issues diagnosed
Fix plans verified ✓
### Issues Found
{List issues with severity from UAT.md}
───────────────────────────────────────────────────────────────
## ▶ Next Up
**Execute fix plans** — run diagnosed fixes
/gsd:execute-phase {Z} --gaps-only
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
**Also available:**
- cat .planning/phases/{phase_dir}/*-PLAN.md — review fix plans
- /gsd:plan-phase {Z} --gaps — regenerate fix plans
───────────────────────────────────────────────────────────────
---
**Route D: Issues found, planning blocked**
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
GSD ► PHASE {Z} BLOCKED ✗
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
**Phase {Z}: {Name}**
{N}/{M} tests passed
Fix planning blocked after {X} iterations
### Unresolved Issues
{List blocking issues from planner/checker output}
───────────────────────────────────────────────────────────────
## ▶ Next Up
**Manual intervention required**
Review the issues above and either:
1. Provide guidance for fix planning
2. Manually address blockers
3. Accept current state and continue
───────────────────────────────────────────────────────────────
**Options:**
- /gsd:plan-phase {Z} --gaps — retry fix planning with guidance
- /gsd:discuss-phase {Z} — gather more context before replanning
───────────────────────────────────────────────────────────────
</offer_next>
<success_criteria>
- [ ] UAT.md created with tests from SUMMARY.md
- [ ] Tests presented one at a time with expected behavior
- [ ] Plain text responses (no structured forms)
- [ ] Severity inferred, never asked
- [ ] Batched writes: on issue, every 5 passes, or completion
- [ ] Committed on completion
- [ ] If issues: parallel debug agents diagnose root causes
- [ ] If issues: gsd-planner creates fix plans from diagnosed gaps
- [ ] If issues: gsd-plan-checker verifies fix plans (max 3 iterations)
- [ ] Ready for `/gsd:execute-phase` when complete
</success_criteria>