enhancement(planner): replace time-based reasoning with context-cost sizing and add multi-source coverage audit (#2091) (#2092) (#2114)
Replace minutes-based task sizing with context-window percentage sizing. Add planner_authority_limits section prohibiting difficulty-based scope decisions. Expand decision coverage matrix to multi-source audit covering GOAL, REQ, RESEARCH, and CONTEXT artifacts. Add Source Audit gap handling to plan-phase orchestrator (step 9c). Update plan-checker to detect time/complexity language in scope reduction scans. Add 374 CI regression tests preventing prohibited language from leaking back into artifacts. Closes #2091 Closes #2092 Co-authored-by: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -338,6 +338,8 @@ issue:
|
||||
- `"future enhancement"`, `"placeholder"`, `"basic version"`, `"minimal"`
|
||||
- `"will be wired later"`, `"dynamic in future"`, `"skip for now"`
|
||||
- `"not wired to"`, `"not connected to"`, `"stub"`
|
||||
- `"too complex"`, `"too difficult"`, `"challenging"`, `"non-trivial"` (when used to justify omission)
|
||||
- Time estimates used as scope justification: `"would take"`, `"hours"`, `"days"`, `"minutes"` (in sizing context)
|
||||
2. For each match, cross-reference with the CONTEXT.md decision it claims to implement
|
||||
3. Compare: does the task deliver what D-XX actually says, or a reduced version?
|
||||
4. If reduced: BLOCKER — the planner must either deliver fully or propose phase split
|
||||
|
||||