enhancement(planner): replace time-based reasoning with context-cost sizing and add multi-source coverage audit (#2091) (#2092) (#2114)

Replace minutes-based task sizing with context-window percentage sizing.
Add planner_authority_limits section prohibiting difficulty-based scope
decisions. Expand decision coverage matrix to multi-source audit covering
GOAL, REQ, RESEARCH, and CONTEXT artifacts. Add Source Audit gap handling
to plan-phase orchestrator (step 9c). Update plan-checker to detect
time/complexity language in scope reduction scans. Add 374 CI regression
tests preventing prohibited language from leaking back into artifacts.

Closes #2091
Closes #2092

Co-authored-by: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
Tom Boucher
2026-04-11 10:26:27 -04:00
committed by GitHub
parent 72e789432e
commit f425bf9142
5 changed files with 501 additions and 103 deletions

View File

@@ -338,6 +338,8 @@ issue:
- `"future enhancement"`, `"placeholder"`, `"basic version"`, `"minimal"`
- `"will be wired later"`, `"dynamic in future"`, `"skip for now"`
- `"not wired to"`, `"not connected to"`, `"stub"`
- `"too complex"`, `"too difficult"`, `"challenging"`, `"non-trivial"` (when used to justify omission)
- Time estimates used as scope justification: `"would take"`, `"hours"`, `"days"`, `"minutes"` (in sizing context)
2. For each match, cross-reference with the CONTEXT.md decision it claims to implement
3. Compare: does the task deliver what D-XX actually says, or a reduced version?
4. If reduced: BLOCKER — the planner must either deliver fully or propose phase split