* test(#3581): pin init.progress's frontier to roadmap order over stray artifacts
Failing-first regression for #3581: a stray out-of-order phase directory
(a phase-9 UAT evidence file while roadmap phase 8 was pending and
unscaffolded) made init.progress report next_phase 09, skipping Phase 8
and disagreeing with roadmap.analyze. Rows pin the issue shape, the
aligned-tree control, and the all-complete boundary.
* fix(#3581): derive init.progress's next_phase from roadmap order, not artifact presence
The frontier is re-derived from the sorted phase union after the disk and
roadmap loops: the first not-yet-begun, not-roadmap-complete phase wins.
Artifacts still feed status and completion per entry, but a stray
out-of-order directory can no longer drag the frontier past a pending
unscaffolded roadmap phase, and init.progress agrees with roadmap.analyze.
* fix(#3581): frontier = first not-complete phase in roadmap order (resume semantics)
Review-of-own-control refinement: a begun-but-unfinished phase (in_progress,
executed, researched) is the frontier — the next thing to execute is to
resume it — so the frontier predicate is simply 'not complete and not
roadmap-complete', first in the sorted union.
* fix(#3581): preserve the pinned pending-only frontier contract; repair the boundary fixture
Review findings: the resume-semantics refinement broke the suite-pinned
contract that an in-progress phase is currentPhase's lane, not nextPhase's
(tests/init.test.cjs 'multiple phases with mixed statuses') — reverted to
first pending-or-not_started; the control row now pins the pure ordering
property (roadmap-only pending beats a later pending directory); the
boundary fixture gains passing verification reports so disk status reaches
complete under the #3168 disk-strict bar.
* chore(#3581): add changeset fragment
* chore(#3581): backfill changeset pr number
---------
Co-authored-by: sim <sim@local>