* fix(release): finalize job calls sync-next-version.cjs to bump next after final release (#2423)
The release pipeline's 'finalize' job shipped X.Y.0 to npm 'latest' and
merged to main, but never bumped 'next' to match. 'scripts/sync-next-version.cjs'
exists exactly for this — its docstring promises to run 'for every release
type (rc / hotfix / final)' — but it was wired only into the 'rc' job
(release.yml:479), not 'finalize'. As a result, after 1.7.0 shipped on
2026-07-15, 'next' stayed at 1.7.0-rc.6 and every npm script banner on
'next' (and feature branches cut from it) reported the stale rc version.
Regression of #1104 — closed incomplete (covered rc only, not final).
This patch:
- adds a 'Sync next branch to the published release' step to the
'finalize' job, mirroring the rc job's pattern at line 479 (uses
VERSION from inputs.version rather than PRE_VERSION from steps.prerelease,
since finalize does not run the prerelease step);
- gates it on !inputs.dry_run + continue-on-error:true (matches rc);
- adds tests/release-finalize-syncs-next-version.test.cjs — a structural
YAML assertion that fails against the pre-fix workflow and passes after.
Failing-first demonstrated during development; the test parses job blocks
by indentation rather than grep so it stays valid as the file grows.
Root-cause diagnosis: scripts/sync-next-version.cjs:14 docstring admits
'used by release.yml's rc job, which has no next-targeting PR of its own'.
release.yml:506-685 (finalize job) had no sync-next-version step before
this patch. Every prior rc.N release has a matching 'chore: sync next
package version to 1.7.0-rc.N' commit; there is no such commit for 1.7.0.
* chore(release): sync next package version to 1.7.0 (#2423)
Replays the canonical 'chore: sync next package version to <v>' commit
that the release pipeline's rc job auto-produces via scripts/sync-next-version.cjs,
for the 1.7.0 final release that shipped on 2026-07-15 (commit dd4c90f82
'chore: finalize v1.7.0' on main). Without this, 'next' (and every feature
branch cut from it) carried 1.7.0-rc.6 indefinitely and reported it in
every npm script banner (e.g. 'lint:ci').
Bumps 43 synchronized manifests via the npm 'version' lifecycle hook
(scripts/sync-manifest-versions.cjs --stage + scripts/gen-capability-registry.cjs
--write), matching the file set of commit 27f69cc48 ('chore: sync next
package version to 1.7.0-rc.6') and commit dd4c90f82 ('chore: finalize
v1.7.0').
This is the immediate Layer-1 repair for #2423. Layer-2 (prevent recurrence)
is the workflow patch in the previous commit; Layer-3 (regression test)
ships with it. Future X.Y.0 final releases will produce this commit
automatically once the workflow fix lands.
* test(release): tighten #2423 dry-run gate assertion to the sync step
Code review of fix/2423 found that test #3 ('gates sync-next-version on
!inputs.dry_run') asserted too loosely: it scanned the entire finalize
block for any '!inputs.dry_run' line, so it would still pass if the
gate were stripped from the sync-next-version step specifically — the
exact regression the test name promises to catch. The finalize job has
multiple steps with their own !inputs.dry_run gates (e.g. Verify
publish), so the loose version masked the very bug it claimed to detect.
Tighten by extracting the specific YAML step block containing
'scripts/sync-next-version.cjs' and asserting the gate appears within
THAT step's lines, not anywhere in the job. Verified the tightened test:
- PASSES against the post-fix workflow (sync step has its own gate)
- FAILS when the sync step's gate is stripped (even when other steps
in finalize retain their own !inputs.dry_run gates) — the exact
regression that previously slipped through
Adds extractStepBlockContaining(jobBlock, marker) helper alongside the
existing extractJobBlock(text, jobName). Reuses the same indentation-
based parsing, so it stays valid as the file grows.
* chore(changeset): backfill pr:2437 in .changeset/sturdy-ibex-jump.md
CLAUDE.md changeset convention: 'Use placeholder pr:0 during initial commit.
Backfill immediately after gh api POST /pulls returns the real number.'
PR #2437 created from branch fix/2423-release-finalize-sync-next-version.
* fix(#2423): add see #2423 to allow-test-rule exemption per ADR-456
CI lint-allow-test-rule-refs failed on PR #2437: ADR-456 requires new
allow-test-rule exemptions added after the ADR's acceptance to include a
tracking issue number in the comment, in the form
// allow-test-rule: <reason> (see #NNN)
The exemption added in commit 976c8b0a2 lacked this ref. Fixed.
Verified locally:
node scripts/lint-allow-test-rule-refs.cjs
→ ok lint-allow-test-rule-refs: 173 grandfathered exemption(s) tracked, no novel untracked offenders
* feat(#1430): versioned capability manifest + native stamping (ADR-1244 Phase 1)
Make the capability manifest versioned — the data substrate the Capability
Ecosystem (ADR-1244) keys off:
- capability.json gains a REQUIRED semver `version` plus the optional
ecosystem envelope (`engines.gsd`, `compatVersions`, `integrity`,
`provenance`); the build-time conformance validator enforces them via a new
`validateVersionEnvelope()` (exported for the Phase 2 runtime overlay).
- All 32 native capabilities stamped with `version` (= package version,
lockstep) + `engines.gsd`; `sync-manifest-versions.cjs` gains a glob sweep
that keeps them in sync, and the issue-844 regression guard is extended.
- Strict SemVer 2.0.0 grammar blocks metacharacter/space/unicode smuggling in
version strings; range/integrity fields are shape-validated (satisfaction
and the load-time gate are deferred to Phase 2/4).
- Capability rel-paths emitted forward-slash for cross-platform git correctness.
Closes#1430
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
* docs(#1430): add changeset for versioned capability manifest
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
---------
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>