e87fb409ee4663a66260c3efaae9f8ebcc71cc1f
2 Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
8b4545f3c0 |
feat(#3218): the prompt layer asks the CLI for plan counts (#3327)
* feat(#3218): the prompt layer asks the CLI for plan counts Seven sites across four workflows counted plans with ls and wc -l instead of asking the CLI. A shell glob is not scanPhasePlans, so every fix that landed on the owner missed all seven: they counted superseded plans as live, reported zero for the nested plans layout, and missed loosely-named files. The 1762 figure of 30 plans and 24 summaries came from here. phase find is extended rather than a verb added - 3218 is an enhancement whose own checklist says it adds no new command, and CONTRIBUTING makes a new verb a feature needing approved-feature. It gains plan_count and summary_count for the live set and plan_count_all for the physical one, additively; the existing arrays are untouched. Both sets are exposed because the sites need different ones. Amendment 1 names two cases; three of these sites ask a third - did the planner write files to disk - and take the physical set, because a superseded plan is still a file the planner wrote. The progress.md dead route is fixed and was worse than the issue said. It read .plans and .summaries arrays that roadmap.analyze has never emitted, so the fallback always fired, both counts were always zero, and Route 0's resume-incomplete-phase check had never fired at all. The ratchet baseline is empty. Its own stale-entry check makes that self-enforcing. Verified on the remote runner. * test(#3218): acknowledge the workflow growth and update the stale guard The emitted-attribution gate named its own remedy, so it was followed rather than pre-guessed: four workflow files grew between 200 and 770 bytes because each replaced a shell glob with a find-phase call plus its jq extraction. plan-phase grew most - two sites, and it takes the physical count for its did-the-planner- write-files question. progress also carries the Route 0 dead-path fix. plan-phase-drift-guard asserted the literal old ls shape. Updated rather than deleted: what it protects is that a filesystem fallback exists and is reachable, and that is intact. It is not a regression - gsd_run is already load-bearing throughout plan-phase.md long before step 9, so the 9a and 11a fallback never existed to survive gsd_run being unavailable; it guards against the planner subagent's return hanging. Three ack sources collided with the new fragment, which the gate treats as a hard error rather than last-wins. Only the three colliding keys were removed, not the 421 spent entries, and two fragments left entryless were deleted per the convention that an empty fragment signals nothing. Verified on the remote runner. * docs(#3218): document the live and physical plan counts docs/CLI-TOOLS.md gains a find-phase counts section covering plan_count and summary_count for the live set against plan_count_all for the physical one, plus the null-not-zero not-found behavior. The live-versus-physical distinction is spelled out because a caller picking the wrong one gets a plausible number, which is the trap Amendment 1 records. Changeset leads with what a user sees: progress and execute-plan stop counting superseded plans as outstanding, a nested plans layout stops reporting zero, and Route 0 resume routing starts working after never having worked. No how-to. Nothing is enabled and nothing is sequenced - the user runs the same command and the number is simply correct. The one new distinction is field semantics, which is what a reference entry is for. * chore(#3218): backfill changeset PR number pr:0 placeholder replaced with the real number now that #3327 exists. --------- Co-authored-by: sim <sim@local> |
||
|
|
f092c6da85 |
fix(#2649): diagnose-issues + execute-plan run worktree.base-check before worktree dispatch (#2955)
* test(#2649): failing-first — diagnose-issues + execute-plan must run base-check before worktree dispatch * fix(#2649): diagnose-issues + execute-plan run worktree.base-check before dispatch diagnose-issues.md spawn_agents and execute-plan.md Pattern A spawned worktree-isolated subagents (gsd-debugger / gsd-executor) without the pre-dispatch worktree.base-check gate that execute-phase (#683/#1369) and quick (#1941) already run. Claude Code's isolation="worktree" forks from origin/HEAD, not live local HEAD; without the gate, the documented GSD steady state (commit every step locally, push only on request) hits the verify-only worktree_branch_check guard's exit-42 halt mid-investigation with no auto-degrade. Mirror the quick.md #1941 pattern: before dispatch, run `gsd_run query worktree.base-check --pick shouldDegrade`; if true, print its message + a #2649 warning to stderr and set USE_WORKTREES=false (sequential main-tree dispatch). The verify-only guard stays as a backstop in both cases. Per the triage and #2649 acceptance criterion 5, execute-plan.md's Pattern A (identified as a second site with the identical gap) is fixed in the SAME change — same bug class, same one-line gate, two workflow files — rather than filed as a separate follow-up. * fix(#2649): ack the diagnose-issues + execute-plan growth (per-PR fragment) The two workflow files grew vs next (diagnose-issues.md +1381, execute-plan.md +905) adding the #2649 base-check gate. emitted-attribution requires an ack; this is a per-PR fragment under tests/emitted-drift-acks/ (#2914 mechanism, replacing the legacy shared emitted-drift-ack.json). * test(#2649): tighten base-check ordering assertion + guard backstop survival Address code-review minors: - the ordering assertion was a loose disjunction that passed even if the base-check moved AFTER the dispatch; tighten to assert base-check < Agent() (the real invariant). - add a test that the verify-only <worktree_branch_check> backstop remains embedded in the Agent() prompt (acceptance criterion 4 — the base-check is a pre-dispatch degrade, the guard is a post-fork fail-closed backstop; both layers must survive). * changeset(#2649): diagnose-issues + execute-plan auto-degrade on stale worktree base * changeset(#2649): backfill PR number 2955 --------- Co-authored-by: sim <sim@users.noreply.github.com> |