Commit Graph

12 Commits

Author SHA1 Message Date
github-actions[bot]
97ca69a53e chore: sync next package version to 1.11.0 2026-08-19 13:51:49 +00:00
github-actions[bot]
4f2a4932ce chore: sync next package version to 1.10.0 2026-08-08 05:07:32 +00:00
github-actions[bot]
854c93533c chore: sync next package version to 1.9.1 2026-07-31 13:12:09 +00:00
github-actions[bot]
4232a79396 chore: sync next package version to 1.9.0 2026-07-31 03:14:04 +00:00
github-actions[bot]
8cf747724f chore: sync next package version to 1.8.0 2026-07-22 00:06:08 +00:00
Tom Boucher
6b196ef638 fix(#2423): finalize job syncs next package.json after final release (#2437)
* fix(release): finalize job calls sync-next-version.cjs to bump next after final release (#2423)

The release pipeline's 'finalize' job shipped X.Y.0 to npm 'latest' and
merged to main, but never bumped 'next' to match. 'scripts/sync-next-version.cjs'
exists exactly for this — its docstring promises to run 'for every release
type (rc / hotfix / final)' — but it was wired only into the 'rc' job
(release.yml:479), not 'finalize'. As a result, after 1.7.0 shipped on
2026-07-15, 'next' stayed at 1.7.0-rc.6 and every npm script banner on
'next' (and feature branches cut from it) reported the stale rc version.

Regression of #1104 — closed incomplete (covered rc only, not final).

This patch:
  - adds a 'Sync next branch to the published release' step to the
    'finalize' job, mirroring the rc job's pattern at line 479 (uses
    VERSION from inputs.version rather than PRE_VERSION from steps.prerelease,
    since finalize does not run the prerelease step);
  - gates it on !inputs.dry_run + continue-on-error:true (matches rc);
  - adds tests/release-finalize-syncs-next-version.test.cjs — a structural
    YAML assertion that fails against the pre-fix workflow and passes after.
    Failing-first demonstrated during development; the test parses job blocks
    by indentation rather than grep so it stays valid as the file grows.

Root-cause diagnosis: scripts/sync-next-version.cjs:14 docstring admits
'used by release.yml's rc job, which has no next-targeting PR of its own'.
release.yml:506-685 (finalize job) had no sync-next-version step before
this patch. Every prior rc.N release has a matching 'chore: sync next
package version to 1.7.0-rc.N' commit; there is no such commit for 1.7.0.

* chore(release): sync next package version to 1.7.0 (#2423)

Replays the canonical 'chore: sync next package version to <v>' commit
that the release pipeline's rc job auto-produces via scripts/sync-next-version.cjs,
for the 1.7.0 final release that shipped on 2026-07-15 (commit dd4c90f82
'chore: finalize v1.7.0' on main). Without this, 'next' (and every feature
branch cut from it) carried 1.7.0-rc.6 indefinitely and reported it in
every npm script banner (e.g. 'lint:ci').

Bumps 43 synchronized manifests via the npm 'version' lifecycle hook
(scripts/sync-manifest-versions.cjs --stage + scripts/gen-capability-registry.cjs
--write), matching the file set of commit 27f69cc48 ('chore: sync next
package version to 1.7.0-rc.6') and commit dd4c90f82 ('chore: finalize
v1.7.0').

This is the immediate Layer-1 repair for #2423. Layer-2 (prevent recurrence)
is the workflow patch in the previous commit; Layer-3 (regression test)
ships with it. Future X.Y.0 final releases will produce this commit
automatically once the workflow fix lands.

* test(release): tighten #2423 dry-run gate assertion to the sync step

Code review of fix/2423 found that test #3 ('gates sync-next-version on
!inputs.dry_run') asserted too loosely: it scanned the entire finalize
block for any '!inputs.dry_run' line, so it would still pass if the
gate were stripped from the sync-next-version step specifically — the
exact regression the test name promises to catch. The finalize job has
multiple steps with their own !inputs.dry_run gates (e.g. Verify
publish), so the loose version masked the very bug it claimed to detect.

Tighten by extracting the specific YAML step block containing
'scripts/sync-next-version.cjs' and asserting the gate appears within
THAT step's lines, not anywhere in the job. Verified the tightened test:

  - PASSES against the post-fix workflow (sync step has its own gate)
  - FAILS when the sync step's gate is stripped (even when other steps
    in finalize retain their own !inputs.dry_run gates) — the exact
    regression that previously slipped through

Adds extractStepBlockContaining(jobBlock, marker) helper alongside the
existing extractJobBlock(text, jobName). Reuses the same indentation-
based parsing, so it stays valid as the file grows.

* chore(changeset): backfill pr:2437 in .changeset/sturdy-ibex-jump.md

CLAUDE.md changeset convention: 'Use placeholder pr:0 during initial commit.
Backfill immediately after gh api POST /pulls returns the real number.'

PR #2437 created from branch fix/2423-release-finalize-sync-next-version.

* fix(#2423): add see #2423 to allow-test-rule exemption per ADR-456

CI lint-allow-test-rule-refs failed on PR #2437: ADR-456 requires new
allow-test-rule exemptions added after the ADR's acceptance to include a
tracking issue number in the comment, in the form
  // allow-test-rule: <reason> (see #NNN)
The exemption added in commit 976c8b0a2 lacked this ref. Fixed.

Verified locally:
  node scripts/lint-allow-test-rule-refs.cjs
    → ok lint-allow-test-rule-refs: 173 grandfathered exemption(s) tracked, no novel untracked offenders
2026-07-19 14:33:19 -04:00
github-actions[bot]
27f69cc489 chore: sync next package version to 1.7.0-rc.6 2026-07-12 05:40:45 +00:00
github-actions[bot]
451e58e6d5 chore: sync next package version to 1.7.0-rc.5 2026-07-10 17:09:38 +00:00
github-actions[bot]
a6263bba8a chore: sync next package version to 1.7.0-rc.4 2026-07-07 06:08:27 +00:00
github-actions[bot]
a828d8207c chore: sync next package version to 1.7.0-rc.3 2026-07-06 02:19:50 +00:00
Tom Boucher
97730e59a1 fix(#1164): wire external-job config keys + document wave:post choice (#2006)
Refinements A-D to the external-job capability (PR #1998 follow-up):

A. Document why the contribution registers at execute:wave:post: #1164 asks
   for wave:pre, but execute-phase.md only dispatches wave:post today (wave:pre
   is declared in the loop host contract but not rendered). Wiring wave:pre is
   a core-loop change #1164 puts out of scope; the executor honors the
   runtime_budget classification guidance before running any tagged task.

B. external_job.artifact_dir is now consumed (was declared but unused): the
   adapter resolves it via the canonical capability-config seam and surfaces
   the resolved root in submit output.

C. external_job.submit_timeout_ms / poll_timeout_ms are now read from config
   (were shadowed by env-only reads). Precedence: env > config > registry
   default; non-numeric config values fall back (no guessing, no NaN).

D. CLI surface gains unit coverage: parseFlags, findPlanningDir,
   resolveExternalJobSettings, formatShowReport.

Regenerates capability-registry.cjs from the updated capability.json.
2026-07-05 14:04:00 -04:00
Tom Boucher
5ae4ea4c84 feat(#1105): add external-job capability (SLURM scheduler-adapter producer half) (#1998)
* feat(#1105): add external-job capability (SLURM scheduler-adapter producer half)

The async external-job consumer half (#1165) shipped long ago: the core loop
reads .planning/async-jobs/<job>.json manifests and treats a non-terminal one
as the legal external_job_waiting half-state. The PRODUCER half (#1164) was
the remaining unimplemented piece of #1105.

This adds the producer as a default-off capability:

- capabilities/external-job/ — capability.json (execute:wave:post -> executor,
  plan:post -> planner contributions, external_job.* config keys, default-off)
  + fragments teaching runtime-budget classification and externalization.
- src/external-job.cts -> gsd-core/bin/lib/external-job.cjs — pure producer
  module: SLURM state -> manifest-status map (no guessing), manifest
  build/validate (versioned stability contract), sbatch/squeue/sacct parsers,
  and a fail-closed manifest writer (refuses a second non-terminal job for a
  plan_id already in flight; refuses to clobber a malformed manifest). fs/clock
  seams for deterministic tests.
- scripts/slurm-adapter.cjs — operator CLI (submit/poll/show) wrapping bounded
  sbatch/squeue/sacct subprocesses; surfaces manifest commands for confirmation
  and never auto-runs them (trust boundary).
- tests/external-job.test.cjs — 23 behavioral + fast-check property tests.
- docs/reference/long-running-operations.md + docs/how-to/async-external-jobs.md.
- CONTEXT.md glossary entry for the External-job Capability.
- Regenerated capability-registry.cjs; pruned the now-stale test-file-count
  allowlist entry (external-job is at the 2-file cap).

* chore(#1105): backfill PR number in changeset

* fix(#1105): sync capability artifacts + update registry shape-pin tests

gsd-test caught that adding the external-job capability requires its
dependent artifacts regenerated and its registry-shape drift absorbed:

- sync-manifest-versions: stamp 1.7.0-rc.2 into capability.json (was 1.0.0).
- gen-capability-matrix --write: regenerate docs/reference/capability-matrix.md.
- gen-inventory-manifest --write: regenerate docs/INVENTORY-MANIFEST.json.
- check-gap-analysis-plan-post-e2e: plan:post now has 1 contribution
  (external-job planner fragment) instead of 0.
- execute-wave-post-gate-pipeline-e2e: execute:wave:post now has 2
  contributions (mempalace + external-job) instead of 1.

* fix(#1105): regenerate capability-registry after version stamp

sync-manifest-versions re-stamped external-job/capability.json from
1.0.0 to 1.7.0-rc.2 after the last registry regeneration, leaving the
committed capability-registry.cjs stale (CI gen-capability-registry
--check failed). gsd-test masked this because its setup runs the full
'npm run build' (which regenerates the registry); CI's 'npm test'
pretest only runs build:lib.
2026-07-03 19:37:38 -04:00