f7df920681f233ae0fe064ee659550bdf41ff708
2 Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
5b5d473e13 |
chore(#3465): remove 22 verified-vestigial allow-test-rule markers (#3494)
Phase 1 of #3464. Removes the `// allow-test-rule:` marker from 22 test files where it is provably vestigial, and tightens the ratchet ceiling in scripts/lint-allow-test-rule-refs.ceiling.json from 305 to 285. Eligibility is decided by two independent AST discriminators, both conservative (any doubt => keep): (a) Read-target type. Every readFileSync/readFile call in the file resolves statically to a prose/config extension (.md/.json/.yml/.yaml/.toml/.txt), or the file performs no reads at all. Any read of a source extension (.cjs/.js/.mjs/.ts/.cts/.mts/.jsx/.tsx), any dynamic/unresolvable path, and any other extension all disqualify the file. (b) Marker context. Every `allow-test-rule:` occurrence is a genuine comment node, never string- or template-literal payload. A marker that lives inside a RuleTester `code:` fixture is test DATA, not a suppression directive; stripping it corrupts the test. tests/eslint-rules.test.cjs is the one such fixture host and is deliberately untouched. An earlier attempt at this phase classified markers by "strip it and see if local/no-source-grep still passes" and was reverted in full before commit. That oracle is unsound: the rule only fires on a literal .cjs/.js/.ts path containing a quoted bin/lib/gsd-core/src segment, tracked one hop from the binding, so files that genuinely source-grep real JavaScript pass it silently -- tests/no-unbounded-spawn-allowlist.test.cjs (reads test sources through a listTestFiles() walk) and tests/claude-imperative-reference.test.cjs (matches bin/install.js through an intermediate variable) both cleared it while being real source-greps. The rule's implementation is narrower than its intent, so it cannot adjudicate whether an exemption is load-bearing. Scope is limited to comment deletions: the diff over the test tree is 100% line removals with zero insertions, and no executable line is altered. On the ceiling value. The measured count at this HEAD is 283, so 285 leaves 2 slack -- deliberate, and well inside the documented grace band of 3. Pinning the ceiling to the exact count makes this change effectively unmergeable: any concurrent PR that lands one marker-bearing test file re-reds it. That race fired twice while preparing this branch (once mid-rebase taking the count 304->305 on next, once between rebase and the verification run taking it 282->283), and it is the same race that broke next in #3461. A ceiling of actual+2 preserves a merge window while still ratcheting 305 -> 285. Known limit, disclosed rather than papered over: this clears 22 of 303 markers and does not reach #3464's trend-to-zero goal. Most of the remaining markers sit on dynamic-path reads, commonly a hoisted `const p = path.join(tmpDir, 'STATE.md')` whose target is prose but is unresolvable to this classifier. A stricter one-hop const resolution would flip an estimated 95 more; that is deliberately left to a follow-up so it can be reviewed on its own evidence. Marker discovery reads bytes rather than shelling out to grep: tests/security-prompt-injection.security.test.cjs carries a literal NUL byte (an intentional injection fixture) that makes grep treat it as binary and skip it, which is why the true marked-file count is 303 and not the 302 a shell scan reports. Closes #3465 Co-authored-by: sim <sim@local> Co-authored-by: Claude Opus 5 <noreply@anthropic.com> |
||
|
|
e201cde73c |
refactor(#3186): one shared phase-completion predicate, disk-strict (#3306)
* docs(#3186): record the disk-strict completion decision in ADR-3180 7.4 The maintainer decided #2957 on 2026-08-08: disk state is authoritative and a ROADMAP checkbox is a human annotation with no machine authority. Section 7.4 still carried the OPEN QUESTION and was marked blocked, so the contract said one thing and the tracker another. Recorded per section 7's own rule - a behavior not stated there is not decided, and amending a rule is an ADR amendment rather than a code change with a comment. The decision comment names Phase 4's PR as the carrier of this edit and makes it an acceptance criterion that the text be in the tree before implementation begins, so this lands first, alone, ahead of any code. Also clears the stale blocked-on-2957 row in the guard roster. * refactor(#3186): one shared phase-completion predicate, disk-strict isPhaseComplete in verification.cts becomes the single owner. It calls readVerificationStatus UNCONDITIONALLY - plan count is not a precondition - so a zero-plan phase with a passing VERIFICATION.md is complete. That is #3168: init gated the read on a plan count and synthesized a not_required sentinel, so phase.complete succeeded while init.manager reported incomplete for the same phase. The guard, built and run before scope was fixed per Amendment 3, found 9 re-derivations where the ADR named 3. Four were unnamed, including one in the prompt layer: mvp-phase.md ORed a ticked checkbox with disk status, which under disk-strict is the divergence itself. Per the #2957 decision, a ticked ROADMAP checkbox is a human annotation with no machine authority. The overrides in roadmap analyze and init manager are deleted rather than generalized; the user's checkbox stays in ROADMAP.md, only its authority goes. scanPhasePlans.completed and buildWorkstreamInventory are deliberately NOT folded - they answer 'are all plans summarized', which is a different question, and folding them would either over-report completion or invert the dependency direction between Phase 1's owner and this one. Verified on the remote runner. * fix(#3186): close seven review findings and record the missing-verdict rule The isolated review reproduced a write-path regression I introduced: migrating cmdRoadmapUpdatePlanProgress dropped its summaryCount>=planCount gate, so a phase with a fresh passing verification plus a newly-added unsummarized plan reported complete AND wrote a checkbox into ROADMAP.md while phase complete refused. The owner stays right per 7.4 - plan count is not a completion precondition - so the gate is restored at the write site as an explicit composition, mirroring the separate 2648 unexecuted-plan gate cmdPhaseComplete already carries. The spec axis was right that my 0.x-split reasoning was too permissive. The 2957 decision names buildStateFrontmatter as one of the three that must converge, and buildWorkstreamInventory combined a summaries-met local with verification data to decide the same verdict - Decision 4(c)'s named bypass, and it reproduced 3168 in a third surface. Both now route through the owner. The raw scanPhasePlans helper stays: it answers are-plans-summarized, which genuinely is a different question. Maintainer decision recorded in 7.4: a missing verdict is not a passing one, so an absent VERIFICATION.md means not complete everywhere. That retires 2645's verifier-disabled tolerance and inverts its Goodhart incentive - deleting the evidence now lowers completion instead of raising it. Guard hardened: block-form count gates and algebraic restatements are caught, and the header now discloses its remaining limits instead of overclaiming. Verified on the remote runner. * fix(#3186): route state sync through the owner and catch bare completed reads The matrix found 52 failures. 51 were fixtures asserting the old semantics: a phase with plans and summaries but no VERIFICATION.md used to count complete and correctly no longer does. Each fixture now carries a passing verification where that is what the test was actually about, rather than having its assertion weakened. The 52nd was a real 10th re-derivation the guard could not see. cmdStateSync destructured scanPhasePlans().completed directly - a bare field read, not a comparison - and used it as a completion verdict, so state sync and state json disagreed on completed_phases for identical disk state. Routed through the owner. Guard gains shape (d): any read of .completed off a scanPhasePlans() result outside plan-scan.cts, in chained, destructured and indirect forms, function scoped with no line window. It cannot tell a summaries-met read from a completion read - that is data flow - so it flags every one and requires a written-reason exemption, which is the same discipline shapes a-c already use. The blind spot is disclosed in the header rather than overclaimed. The emitted-attribution failure was also mine, not pre-existing: the mvp-phase.md checkbox-OR removal moves emitted bytes, acknowledged in tests/emitted-drift-acks. Verified on the remote runner. * test(#3186): give the nested-plans sync fixture a passing verification Last 3 matrix failures were one failure echoing up two describe levels. Phase 01-alpha had plans and summaries but no VERIFICATION.md, so under disk-strict completed stayed 0 and no Progress change was emitted - correct new behavior, not a regression. Added the passing verification rather than dropping the Progress expectation, so the test still covers what #3257 is about: that a nested plans/ layout is counted and not undercounted. Probe against the built lib confirms Progress: 0% -> 50% alongside Total Plans in Phase: 0 -> 3. * chore(#3186): backfill changeset PR number pr:0 placeholder replaced with the real number now that #3306 exists. --------- Co-authored-by: sim <sim@local> |