--- id: 21 title: Requirements Coverage Gate group: Quality Assurance Features --- **Purpose:** Ensure all phase requirements are covered by at least one plan before planning completes. **Requirements:** - REQ-COVGATE-01: System MUST extract all requirement IDs assigned to the phase from ROADMAP.md - REQ-COVGATE-02: System MUST verify each requirement appears in at least one PLAN.md - REQ-COVGATE-03: Uncovered requirements MUST block planning completion - REQ-COVGATE-04: System MUST report which specific requirements lack plan coverage **When:** Runs automatically at the end of `/msd-plan-phase` after the plan checker loop.