--- id: 39 title: Execution Hardening group: Infrastructure Features --- **Purpose:** Three additive quality improvements to the execution pipeline that catch cross-plan failures before they cascade. **Components:** **1. Pre-Wave Dependency Check** (execute-phase) Before spawning wave N+1, verify key-links from prior wave artifacts exist and are wired correctly. Catches cross-plan dependency gaps before they cascade into downstream failures. **2. Cross-Plan Data Contracts — Dimension 9** (plan-checker) New analysis dimension that checks plans sharing data pipelines have compatible transformations. Flags when one plan strips data that another plan needs in its original form. **3. Export-Level Spot Check** (verify-phase) After Level 3 wiring verification passes, spot-check individual exports for actual usage. Catches dead stores that exist in wired files but are never called. **Requirements:** - REQ-HARD-01: Pre-wave check MUST verify key-links from all prior wave artifacts before spawning next wave - REQ-HARD-02: Cross-plan contract check MUST detect incompatible data transformations between plans - REQ-HARD-03: Export spot-check MUST identify dead stores in wired files