# Roadmap: v1.9.0 Codebase Intelligence System **Goal:** Make GSD feel intelligent and automagical in how it navigates and understands both greenfield and brownfield projects. **Phases:** 5 (4 complete) --- ## Current Milestone: v1.9.0 ### Phase 1: Foundation & Learning ✓ **Goal:** Establish index schema and incremental learning via PostToolUse hook **Status:** Complete **Plans:** 2/2 ### Phase 2: Context Injection ✓ **Goal:** Inject codebase awareness into every session via SessionStart hook **Status:** Complete **Plans:** 2/2 ### Phase 3: Brownfield & Integration ✓ **Goal:** Deep analysis command for existing codebases, workflow integration **Status:** Complete **Plans:** 3/3 ### Phase 4: Semantic Intelligence & Scale ✓ **Goal:** Transform syntax-only indexing into semantic understanding with graph-based relationships **Status:** Complete **Plans:** 5/5 Plans: - [x] 04-01-PLAN.md — SQLite graph layer with sql.js (Wave 1) - [x] 04-02-PLAN.md — Graph-backed rich summary generation (Wave 2) - [x] 04-03-PLAN.md — Semantic entity generation via Claude API (Wave 2) - [x] 04-04-PLAN.md — CLI query interface for getDependents (Wave 3) - [x] 04-05-PLAN.md — Wire plan-phase.md to inject intel into planner (Wave 3) **Wave Structure:** - Wave 1: 04-01 (SQLite foundation) - Wave 2: 04-02, 04-03 (parallel - both depend only on 04-01) - Wave 3: 04-04, 04-05 (parallel - consumption layer) **Why this phase:** - Current system provides "2-3 ls commands worth of information" (Claude's own assessment) - Missing: what files actually DO, who uses them, blast radius of changes - Senior engineers at top companies need real intelligence, not file counts **Delivers:** - SQLite graph layer (sql.js - zero native deps) for relationship queries - Entity-based semantic documentation (Claude writes understanding, not just syntax) - Semantic `/gsd:analyze-codebase` that creates initial entities - Rich summary generation from accumulated semantic knowledge - CLI query interface for "what uses this file?" queries **Requirements:** - INTEL-04: Entity files capture semantic understanding (purpose, what exports do) - INTEL-05: Relationships queryable ("what uses this file?", "blast radius") - INTEL-06: `/gsd:analyze-codebase` creates initial entity docs via Claude - INTEL-07: Summary reflects accumulated semantic knowledge **Success Criteria:** 1. Claude can answer "what uses src/lib/db.ts?" from SessionStart context 2. Summary includes file purposes, not just file counts 3. Transitive dependency queries work (blast radius) 4. Works at scale (500+ file codebases) ### Phase 5: Subagent Codebase Analysis **Goal:** Prevent context exhaustion on large codebases by delegating analysis to subagents **Depends on:** Phase 4 **Plans:** 2 plans Plans: - [ ] 05-01-PLAN.md — Create gsd-entity-generator subagent (Wave 1) - [ ] 05-02-PLAN.md — Refactor analyze-codebase to use subagent delegation (Wave 2) **Wave Structure:** - Wave 1: 05-01 (agent definition) - Wave 2: 05-02 (command refactor + verification) **Why this phase:** - Current entity generation loads file contents in orchestrator context - On large codebases (500+ files), orchestrator exhausts context during file selection and batching - Subagent delegation gives fresh 200k context for entity generation **Delivers:** - `gsd-entity-generator` subagent following gsd-codebase-mapper pattern - Refactored `/gsd:analyze-codebase` that spawns subagent instead of inline batching - Preserved orchestrator context for large codebase analysis **Requirements:** - INTEL-08: Entity generation delegated to subagent (not inline) - INTEL-09: Subagent writes entities directly, returns statistics only - INTEL-10: Orchestrator passes file paths, not file contents **Success Criteria:** 1. Entity generation works via subagent spawn 2. Orchestrator context preserved (no file contents loaded) 3. Entities correctly formatted and graph.db updated 4. Works on 500+ file codebases without context exhaustion --- ## Traceability | Requirement | Phase | Status | |-------------|-------|--------| | INTEL-01 | Phase 1 | ✓ Complete | | INTEL-02 | Phase 2 | ✓ Complete | | INTEL-03 | Phase 3 | ✓ Complete | | INTEL-04 | Phase 4 | ✓ Complete (04-03) | | INTEL-05 | Phase 4 | ✓ Complete (04-04) | | INTEL-06 | Phase 4 | ✓ Complete (04-03) | | INTEL-07 | Phase 4 | ✓ Complete (04-02) | | INTEL-08 | Phase 5 | Planned (05-01, 05-02) | | INTEL-09 | Phase 5 | Planned (05-01) | | INTEL-10 | Phase 5 | Planned (05-02) | --- *Created: 2026-01-19* *Updated: 2026-01-20 — Phase 5 planned with 2 plans in 2 waves*