--- type: Changed pr: 3327 --- **/gsd-progress and /gsd-execute-plan stop counting superseded plans as outstanding work** — seven prompt-layer sites across execute-plan.md, plan-phase.md, plan-review-convergence.md and progress.md counted plans with a raw `ls *-PLAN.md | wc -l`, so a plan marked `status: superseded` was still counted as outstanding, a phase on the nested plans/ layout (#3139) reported zero plans it actually had, and loosely-named plan files were missed entirely. Every site now calls `phase find`, which gains three additive fields — `plan_count`/`summary_count` (live, superseded excluded — 'how much is left') and `plan_count_all` (physical, every plan on disk — 'what did the planner write') — so what a workflow shows and what `phase find` reports for the same phase are now the same number. This also fixes a dead route: progress.md's Route 0 resume-incomplete-phase check read `.plans`/`.summaries` arrays that its producer, roadmap.analyze, never emitted (it emits plan_count/summary_count scalars), so both counts were always 0 and the check had never fired at all — it now fires correctly. **This is a behavior change you'll notice:** plan/summary counts shown by these workflows will move — toward being correct. (#3218)