Mechanical rename produced by scripts/msd-rename.cjs: gsd/Gsd/GSD -> msd/Msd/MSD across contents and paths, upstream package/repo coordinates -> @golem15/msd-core and golem15com/msd-core. Deep links into upstream history, sibling upstream packages, the GSD-2 import feature, CHANGELOG.md and .changeset/ are kept as-is. Hand edits on top: MSD block-letter banner and logos, LICENSE copyright line, package/plugin identity, regenerated lockfile, install-tree fixtures, derived registries and benchmark baseline; migration checksum baseline re-locked (MSD keeps its own install state, so no install had applied the old sums); sort-order and regex-escaped expectations in tests adjusted.
925 B
925 B
id, title, group
| id | title | group |
|---|---|---|
| 50 | Milestone Summary | v1.28 Features |
Command: /msd-milestone-summary [version]
Purpose: Generate comprehensive project summary from milestone artifacts for team onboarding.
Requirements:
- REQ-SUMMARY-01: System MUST aggregate phase plans, summaries, and verification results
- REQ-SUMMARY-02: System MUST work for both current and archived milestones
- REQ-SUMMARY-03: System MUST produce a single navigable document
Produces:
| Artifact | Description |
|---|---|
MILESTONE-SUMMARY.md |
Comprehensive navigable summary of milestone artifacts |
Process:
- Collect — Aggregate phase plans, summaries, and verification results from the target milestone
- Synthesize — Combine artifacts into a single navigable document with cross-references
- Output — Write
MILESTONE-SUMMARY.mdsuitable for team onboarding and stakeholder review