Files
msd-core/tests/qa/fixtures/roadmap/post-rollover-v2.md
Jakub Zych a9a7a328e6 refactor: hard-fork GSD -> MSD (Make Software Done)
Mechanical rename produced by scripts/msd-rename.cjs: gsd/Gsd/GSD -> msd/Msd/MSD
across contents and paths, upstream package/repo coordinates -> @golem15/msd-core
and golem15com/msd-core. Deep links into upstream history, sibling upstream
packages, the GSD-2 import feature, CHANGELOG.md and .changeset/ are kept as-is.

Hand edits on top: MSD block-letter banner and logos, LICENSE copyright line,
package/plugin identity, regenerated lockfile, install-tree fixtures, derived
registries and benchmark baseline; migration checksum baseline re-locked
(MSD keeps its own install state, so no install had applied the old sums);
sort-order and regex-escaped expectations in tests adjusted.
2026-10-06 01:47:40 +02:00

1.7 KiB

Roadmap: Loop QA Walk Sample

Overview

🚧 v2.0 Post-Rollover Milestone — extend the shipped v1.0 parser with one more phase now that Phase 1-3 have shipped. Phases for this milestone are not yet drafted — the next phase add call is what introduces Phase 4, exactly as a planner would after the roadmapper hands off a version-only roadmap.

Phases

  • Phase 4: Post-Rollover Work - Extend the shipped parser with a new feature

Phase Details

Phase 4: Post-Rollover Work

Goal: Extend the shipped parser with a new feature Depends on: Nothing (new milestone) Requirements: [REQ-06] Success Criteria (what must be TRUE):

  1. The post-rollover feature is implemented and covered by a plan Plans: 1 plan

Plans:

  • 04-01: Implement the post-rollover feature

Progress

Execution Order: Phases execute in numeric order: 4

Phase Plans Complete Status Completed
4. Post-Rollover Work 0/1 Not started -