Mechanical rename produced by scripts/msd-rename.cjs: gsd/Gsd/GSD -> msd/Msd/MSD across contents and paths, upstream package/repo coordinates -> @golem15/msd-core and golem15com/msd-core. Deep links into upstream history, sibling upstream packages, the GSD-2 import feature, CHANGELOG.md and .changeset/ are kept as-is. Hand edits on top: MSD block-letter banner and logos, LICENSE copyright line, package/plugin identity, regenerated lockfile, install-tree fixtures, derived registries and benchmark baseline; migration checksum baseline re-locked (MSD keeps its own install state, so no install had applied the old sums); sort-order and regex-escaped expectations in tests adjusted.
1.7 KiB
1.7 KiB
Roadmap: Loop QA Walk Sample
Overview
🚧 v2.0 Post-Rollover Milestone — extend the shipped v1.0 parser with one
more phase now that Phase 1-3 have shipped. Phases for this milestone are not
yet drafted — the next phase add call is what introduces Phase 4, exactly
as a planner would after the roadmapper hands off a version-only roadmap.
Phases
- Phase 4: Post-Rollover Work - Extend the shipped parser with a new feature
Phase Details
Phase 4: Post-Rollover Work
Goal: Extend the shipped parser with a new feature Depends on: Nothing (new milestone) Requirements: [REQ-06] Success Criteria (what must be TRUE):
- The post-rollover feature is implemented and covered by a plan Plans: 1 plan
Plans:
- 04-01: Implement the post-rollover feature
Progress
Execution Order: Phases execute in numeric order: 4
| Phase | Plans Complete | Status | Completed |
|---|---|---|---|
| 4. Post-Rollover Work | 0/1 | Not started | - |