Files
msd-core/commands/msd/review-backlog.md
Jakub Zych a9a7a328e6 refactor: hard-fork GSD -> MSD (Make Software Done)
Mechanical rename produced by scripts/msd-rename.cjs: gsd/Gsd/GSD -> msd/Msd/MSD
across contents and paths, upstream package/repo coordinates -> @golem15/msd-core
and golem15com/msd-core. Deep links into upstream history, sibling upstream
packages, the GSD-2 import feature, CHANGELOG.md and .changeset/ are kept as-is.

Hand edits on top: MSD block-letter banner and logos, LICENSE copyright line,
package/plugin identity, regenerated lockfile, install-tree fixtures, derived
registries and benchmark baseline; migration checksum baseline re-locked
(MSD keeps its own install state, so no install had applied the old sums);
sort-order and regex-escaped expectations in tests adjusted.
2026-10-06 01:47:40 +02:00

1.9 KiB

name, description, allowed-tools, requires
name description allowed-tools requires
msd:review-backlog Review and promote backlog items to active milestone
Read
Write
Bash
Grep
AskUserQuestion
phase
review
Review all 999.x backlog items and optionally promote them into the active milestone sequence or remove stale entries.
  1. List backlog items:

    _BACKLOG=( .planning/phases/999* )
    if [ -e "${_BACKLOG[0]}" ]; then ls -d "${_BACKLOG[@]}"; else echo "No backlog items found"; fi
    
  2. Read ROADMAP.md and extract all 999.x phase entries:

    cat .planning/ROADMAP.md
    

    Show each backlog item with its description, any accumulated context (CONTEXT.md, RESEARCH.md), and creation date.

  3. Present the list to the user via AskUserQuestion:

    • For each backlog item, show: phase number, description, accumulated artifacts
    • Options per item: Promote (move to active), Keep (leave in backlog), Remove (delete)
  4. For items to PROMOTE:

    • Find the next sequential phase number in the active milestone
    • Rename the directory from 999.x-slug to {new_num}-slug:
      NEW_NUM=$(msd-tools query phase.add "${DESCRIPTION}" --raw)
      
    • Move accumulated artifacts to the new phase directory
    • Update ROADMAP.md: move the entry from ## Backlog section to the active phase list
    • Remove (BACKLOG) marker
    • Add appropriate **Depends on:** field
  5. For items to REMOVE:

    • Delete the phase directory
    • Remove the entry from ROADMAP.md ## Backlog section
  6. Commit changes:

    msd-tools query commit "docs: review backlog — promoted N, removed M" --files .planning/ROADMAP.md
    
  7. Report summary:

    ## 📋 Backlog Review Complete
    
    Promoted: {list of promoted items with new phase numbers}
    Kept: {list of items remaining in backlog}
    Removed: {list of deleted items}