ADR-2207: STATE.md Status lifecycle — phase-completion writes an intermediate state; milestone-close owns termination
- Status: Accepted
- Date: 2026-07-12
- Issue: #2207
- Implements: #2204 (Bug 7b, split from the #2191 batch)
Context
STATE.md's Status field is written by two transitions with an overloaded value:
completePhaseCore(phase-completion) writes a bareStatus: Milestone completeon the last phase, keyed onisLastPhase.milestoneCompleteCore(milestone-close) writes the terminalStatus: <version> milestone completeand resets## Current PositiontoAwaiting next milestone.
"Milestone complete" therefore spans two distinct states — an intermediate "all phases done, awaiting formal close" and the terminal archived state — and a phase-level verb owns a milestone-level field. Because isLastPhase is derived from the ROADMAP parse, a mis-parse (the bullet-form / membership bugs, #2199 / #2200) can flip the milestone status on the wrong phase.
Decision
- Phase-completion writes an intermediate state, not the terminal one.
completePhaseCorewrites the existingAll phases completevalue (already used ingsd2-import.cts) on the last phase — notMilestone complete. - Milestone termination is owned solely by the milestone-close verb. Only
milestoneCompleteCorewrites<version> milestone complete/Awaiting next milestone. - The coupling is retained, not removed. "Is this the last phase" stays on the phase-completion path; its correctness is carried by the existing
#2028checkbox guard, the parse fixes (#2199 / #2200), and theverify.ctsship gate that already errors when STATE claims milestone-complete while phases are unstarted.
Rejected alternative — decouple (phase verbs never write milestone Status): rejected because #2028 shows the last-phase signal is deliberately wanted on the phase-completion path; removing it would regress that.
The Status lifecycle (ubiquitous language)
Ready to plan → All phases complete (all phases done, milestone awaiting formal close) → <version> milestone complete → Awaiting next milestone (terminal / archived).
Consequences
Positive: the overload is removed; the intermediate and terminal "complete" states are distinct; a phase-level verb no longer writes the terminal milestone state; the wrong-phase flip becomes a parse-correctness concern already owned upstream.
Cost / follow-through (implemented in #2204): consumers that key on the Milestone complete string must recognize All phases complete — workflows/progress.md (Route D), verify.cts, and workstream-inventory-builder.cts. normalizeStateStatus already maps any status containing "complete" → completed, so it needs no change. A CONTEXT.md glossary entry enumerating the Status lifecycle lands with the #2204 implementation.