* fix(#2903): use the command form that actually works in reader-facing docs Docs told readers to type the colon form, which no runtime registers -- 18 of 19 runtimes use slash-hyphen and the 19th uses shell-var -- so anyone copying an example got an unrecognized command. Swept 178 occurrences across 53 files, locale mirrors included so they do not re-diverge from English. The colon form is a source-authoring token, not a user-facing one: install-time converters key on it to produce the hyphen form runtimes actually register. So the sweep is scoped, and three things are deliberately left alone: - ADRs, which are a historical record; editing their prose falsifies what was written at the time. - The legacy release-notes archive, pending a maintainer decision on whether it follows the same historical carve-out. Excluding it keeps a later reversal additive rather than a revert. - Source artifacts under commands, workflows and agents, where the colon form is load-bearing. Rewriting those would break the installed-skill guarantee across every runtime -- the single largest hazard here. The plugin namespace form is a real, separate token and survives untouched. Adds a lint enforcing exactly that boundary, since the correct form genuinely differs by directory and nothing previously caught the drift. Also fixes a hardcoded colon form in the capability-matrix generator. The sweep alone would have left the generated matrix disagreeing with the template that produces it, so the fix is at the source and the output regenerated. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> * fix(#2903): stop the sweep misquoting source frontmatter Adversarial review caught three lines where the sweep rewrote a citation of the literal YAML name: key from a source command file. That key genuinely is the colon form -- this change's own carve-out logic says source-authoring tokens keep it -- so the docs ended up misquoting the real files. One of the three is an acceptance-checklist assertion, which the sweep turned into a false statement. Restored the three citations to match their sources verbatim, surgically: where a line carried both a name: citation and a real reader-facing slash command, only the citation reverted and the command stayed corrected. The guard needed the same distinction, or it would have flagged the restoration and reddened the build: a gsd:<cmd> token preceded by name: is a citation of a source token and is now permitted. The exemption is deliberately narrow -- a bare gsd:<cmd> anywhere else still fails -- with a test pinning that narrowness. Also makes the detection case-insensitive. Review found /GSD:next slipped through silently; no such casing exists in the tree today, so this closes a latent gap rather than fixing a live one. Swept the whole tree for further corrupted citations: none beyond the three. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> * fix(#2903): retire the stale-next invariant and sweep next like every other command Maintainer decision on a genuine conflict between two contracts. Invariant #3054 banned the literal /gsd-next from user-facing docs because it named a retired workflow-advance command. But commands/gsd/next.md is a live command -- the state-aware smart-entry launcher -- and this issue requires docs to use the hyphen form every runtime actually registers. Both could not hold for this one command, so docs had been sidestepping the ban by keeping the colon form, which is exactly the defect this issue exists to remove. FEATURES.md already recorded the reassignment: the hyphen form "is not the retired workflow-advance command; it is reserved for the state-aware smart-entry launcher. Workflow advancement remains under /gsd-progress --next." With that reassignment the invariant's premise is obsolete and the guard now contradicts the documented command form, so it is retired with a comment recording why rather than deleted silently. next is now swept like every other command, and the earlier exemption added to the new guard is removed so nothing is special-cased. Four citations of the literal name: frontmatter key stay in colon form, because the source file really does carry name: gsd:next and a doc quoting it must reproduce it verbatim. Two of those lines were reworded to say which side is the frontmatter key and which is the slash command, since they previously conflated the two. Verified the retired scan would now genuinely fail against this tree -- the conflict was real and resolved, not dodged. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> * chore(#2903): backfill changeset pr number Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
7.3 KiB
How to run phases autonomously
Run all remaining phases — or a bounded range of them — unattended, so GSD moves through discuss → plan → execute for each phase without you driving every step.
For background on what the phase loop is doing during an autonomous run, see The phase loop.
Prerequisites
- An active project with
.planning/ROADMAP.mdand.planning/STATE.md - All phases you want to run must be in a state that autonomous mode can drive (pending or in-progress; not already complete)
- Any design decisions you care about should already be in
PROJECT.mdor captured via a prior/gsd-discuss-phase— autonomous mode can surface grey areas interactively only when you use--interactive
Run all remaining phases
/gsd-autonomous
GSD reads ROADMAP.md, discovers every incomplete phase in numeric order, and runs discuss → plan → execute on each one. After all phases complete it automatically runs the milestone lifecycle: audit → complete → cleanup.
Run a specific range of phases
Use --from and --to to bound the run. Both flags accept decimal phase numbers (e.g. 3.1).
/gsd-autonomous --from 3 # phases 3, 4, 5 … (skip already-done phases 1 and 2)
/gsd-autonomous --to 5 # phases up to and including 5
/gsd-autonomous --from 3 --to 5 # exactly phases 3, 4, and 5
When --to is reached the lifecycle step is skipped, because not all milestone phases are done. The completion banner tells you how to resume:
Resume with: /gsd-autonomous --from 6
Run a single phase
To run exactly one phase without triggering the milestone lifecycle, use --only N:
/gsd-autonomous --only 4
If the phase is already complete, autonomous mode exits immediately with a message rather than re-running it.
Run with plan convergence
Use --converge when you want each phase to run the plan-review convergence loop before execution. Both /gsd-autonomous and /gsd-progress --next --auto support this flag.
gsd config-set workflow.plan_review_convergence true
# Via autonomous (multi-phase or single-phase):
/gsd-autonomous --only 4 --converge
/gsd-autonomous --from 3 --to 5 --converge --all --max-cycles 5
# Via progress --next --auto (step-chaining with convergence):
/gsd-progress --next --auto --converge
/gsd-progress --next --auto --converge --codex --max-cycles 4
--cross-ai is accepted as an alias for --converge. Reviewer flags supported by /gsd-plan-review-convergence pass through unchanged, including --codex, --gemini, --claude, --opencode, --ollama, --lm-studio, --llama-cpp, --all, and --max-cycles N.
If workflow.plan_review_convergence is not enabled, the command stops before planning and prints the enable command instead of silently falling back to regular planning.
Run with interactive discuss
By default, autonomous mode answers discuss questions automatically using smart discuss (batch table proposals). If you want to answer design questions yourself while keeping plan and execute out of the main context:
/gsd-autonomous --interactive
In interactive mode:
/gsd-discuss-phaseruns inline and waits for your answers- On runtimes that support nested background dispatch, planning and execution are dispatched as background agents so you can discuss the next phase while the current one builds; on Claude Code, planning and execution run inline (the next phase's discuss does not overlap)
- The main context stays lean — only discuss conversations accumulate (on runtimes with background dispatch; on Claude Code, inline plan/execute also accumulate)
Run on a non-Claude runtime
To run autonomously on a runtime that does not support the AskUserQuestion tool (for example Codex CLI or Gemini CLI), add --text:
/gsd-autonomous --text
/gsd-autonomous --from 3 --text
All interactive prompts become plain numbered lists; type the choice number to respond. When combined with --converge, --text is also forwarded to the convergence loop via CONVERGENCE_ARGS so reviewer prompts inside plan-review convergence use the same plain-text mode.
What safety gates still apply
Autonomous mode does not bypass GSD's quality pipeline. Each phase still:
- Runs the plan-checker before execution
- Reads
VERIFICATION.mdafter execution and routes on the result - Pauses and asks you what to do when verification status is
human_neededorgaps_found - Stops and presents options (fix and retry, skip phase, or stop) if any step fails
The only difference from manual execution is that passed verification advances automatically — you are not prompted between phases unless a decision is required.
The package legitimacy gate also remains active. If a plan includes a checkpoint:human-verify task for a suspicious package, the executor will stop and surface the checkpoint. Autonomous mode will not silently install flagged packages.
When not to use autonomous mode
Do not use /gsd-autonomous when:
-
Phases have unsettled design decisions. If you have not run
/gsd-discuss-phaseand yourPROJECT.mddoes not capture your preferences, smart discuss will make autonomous choices you may not agree with. Run discuss interactively first, or use--interactive. -
You need fine-grained control over a single phase. For one phase,
/gsd-execute-phase Ngives you step-by-step output and lets you react before continuing. Use--only Nif you want the autonomous quality pipeline on a single phase but do not need step-by-step interaction. -
The phase has novel or high-risk work. Autonomous mode skips pauses unless it hits a blocker. On a phase where you expect surprises, stay in the loop with manual execution.
-
You are mid-phase with partial execution. Autonomous mode picks up incomplete phases but it does not resume a partially-executed wave. Use
/gsd-execute-phase Nto finish a phase that is already in progress.
If a run stops partway through, see Debug a failed execution for how to diagnose what went wrong.
Checking progress during a run
Autonomous mode prints a progress banner before each phase:
GSD ► AUTONOMOUS ▸ Phase 3/7: Auth Middleware [████░░░░] 28%
If you need to check where the run stands mid-session, open another terminal and run:
/gsd-progress
Resuming after a stop
If autonomous mode stops — whether you chose "Stop autonomous mode" from the blocker prompt, or the session was interrupted — resume from where it left off:
/gsd-autonomous --from 4 # replace 4 with the first incomplete phase number
GSD skips already-complete phases automatically, so it is safe to re-run from an earlier phase number if you are not sure where the run stopped.
If a prior run recorded a Deferred Verification entry in STATE.md, later /gsd-autonomous reruns skip that phase instead of re-entering the same deferral prompt. Resume deferred work with the exact command shown in the table:
/gsd-verify-work 4 # for verification_deferred_human
/gsd-plan-phase 6 --gaps # for verification_deferred_gaps