* enhance(#3085): add Grep to allowed-tools for 21 skills
29 of 71 skills omit Grep from allowed-tools, forcing Bash grep for
structured search instead of the dedicated tool. Adds Grep to the
21-skill subset confirmed safe in prior review (excludes the 6
gsd-ns-* dispatchers, gsd-help, and gsd-surface, which have no
plausible structured-search need).
Hand-edits commands/gsd/*.md only; skills/*/SKILL.md is regenerated
via `npm run gen:plugin-skills` from that source. Updates the one
hardcoded copilot-install test assertion affected by gsd-health's
new tool order.
* chore(#3085): backfill changeset PR number
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
* test(#2618): assert the Needs clause on the structured field, not the path-length-dependent bullet
The bullet embeds the todo file's ABSOLUTE path, so its total length
varies by runner tmpdir: on macOS CI, /private/var/folders/… plus the
test harness's gsd-test-run-* wrapper pushed the full bullet to 244
chars — past renderPendingTodoBullet's intended 240-char cap, whose
documented first degradation step drops the Needs clause. The product
behavior is correct (#2618 design); the assertion was runner-dependent.
The extraction is now pinned on json.todos[0].needs; the rendered-bullet
shape stays covered by the path-independent title assertion and the
renderer's own unit rows.
Found blocking #4186's CI on the macOS shard (test landed 30 minutes
earlier in b7406b293f / PR #4384).
---------
Co-authored-by: sim <sim@local>
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
1.7 KiB
1.7 KiB
name, description, argument-hint, allowed-tools, requires
| name | description | argument-hint | allowed-tools | requires | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| gsd:new-milestone | Start a new milestone cycle — update PROJECT.md and route to requirements | [milestone name, e.g., 'v1.1 Notifications'] [--ws <name>] [--reset-phase-numbers] |
|
|
Brownfield equivalent of new-project. Project exists, PROJECT.md has history. Gathers "what's next", updates PROJECT.md, then runs requirements → roadmap cycle.
Creates/Updates:
.planning/PROJECT.md— updated with new milestone goals.planning/research/— domain research (optional, NEW features only).planning/REQUIREMENTS.md— scoped requirements for this milestone.planning/ROADMAP.md— phase structure (continues numbering).planning/STATE.md— reset for new milestone
After: /gsd:plan-phase [N] to start execution.
<execution_context>
@/.claude/gsd-core/workflows/new-milestone.md
@/.claude/gsd-core/references/questioning.md
@/.claude/gsd-core/references/ui-brand.md
@/.claude/gsd-core/templates/project.md
@~/.claude/gsd-core/templates/requirements.md
</execution_context>
Project and milestone context files are resolved inside the workflow (init new-milestone) and delegated via <required_reading> blocks where subagents are used.