529 B
529 B
type, pr
| type | pr |
|---|---|
| Fixed | 2105 |
init plan-phase no longer collapses foreign-prefixed task/workstream IDs into numeric phases — a query like MEM-01 (where MEM is not the configured project_code) used to have its prefix stripped and resolve to the unrelated numeric Phase 01; it now reports phase_found: false unless a phase directory or roadmap entry literally carries that prefix. The configured project_code's own prefixed phases (e.g. LKML-01 under project_code: LKML) continue to resolve as before. (#2056)