Files
msd-core/.changeset/2056-plan-phase-foreign-prefix.md
2026-07-08 14:37:26 -04:00

529 B

type, pr
type pr
Fixed 2105

init plan-phase no longer collapses foreign-prefixed task/workstream IDs into numeric phases — a query like MEM-01 (where MEM is not the configured project_code) used to have its prefix stripped and resolve to the unrelated numeric Phase 01; it now reports phase_found: false unless a phase directory or roadmap entry literally carries that prefix. The configured project_code's own prefixed phases (e.g. LKML-01 under project_code: LKML) continue to resolve as before. (#2056)