Files
msd-core/.changeset/witty-dogs-hop.md
Tom Boucher b55a2e7655 fix(#2117): distinguish not-yet-validated phase from validated failure in audit-milestone
audit-milestone's Nyquist scan classified a phase from `nyquist_compliant`
alone, so a phase seeded by plan-phase but never run through validate-phase
read PARTIAL — identical to a phase that validated and genuinely failed. The
template's `status` field could discriminate the two, but no workflow ever
promoted it off `draft`, so it was dead.

Make `status` live and read it:
- validate-phase.md §6: set `status: validated` in both the create (State B)
  and update (State A) VALIDATION.md paths.
- audit-milestone.md §5.5: parse `status`; add a distinct NOT-VALIDATED bucket
  keyed on `status: draft`, gate COMPLIANT/PARTIAL on `status: validated`, and
  report `not_validated_phases` in the audit YAML.
- VALIDATION.md template: document the draft → validated lifecycle.

Tests & generated artifacts:
- Regression test folded into policy-138 (owning workflow-contract file);
  fail-first verified vs origin/next (0 matches pre-fix).
- Regenerate golden-install-parity fixtures cleanly: adds the previously-missed
  qwen.json and removes a contaminated `settings.local.json` entry that had
  leaked into claude-local.json (the harness excludes hook-config files).
- Correct a stale validate-phase.md workflow-size-baseline entry.

Closes #2117

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 22:47:51 -04:00

334 B

type, pr
type pr
Fixed 2209

Milestone audit no longer flags a not-yet-validated phase as a Nyquist failure — a phase that was planned but never run through validate-phase now reports as NOT-VALIDATED (a "run validate-phase" TODO) instead of collapsing into PARTIAL alongside phases whose validation genuinely failed. (#2117)