* feat(plan-phase): --research-phase flag absorbs deleted /gsd-research-phase + scrub stale refs (#3042, #3044) #3042 (orphaned research-phase): /gsd-research-phase had a workflow file but no slash-command stub. Rather than restore the orphan, the research- only capability is now a flag on /gsd-plan-phase: /gsd-plan-phase --research-phase <N> When set, the workflow scopes to phase N, runs the research step (Section 5 of the existing plan-phase workflow), then early-exits before the planner/plan-checker/verifier chain. Per RCA against the deleted standalone, the flag adds two modifiers to fully cover the original surface (Option B from the RCA discussion): - --view : print existing RESEARCH.md to stdout, no spawn. Cheapest mode for the correction-without-replanning loop the issue reporter explicitly called out. Errors with a clear hint if RESEARCH.md is missing. - --research : reuse the existing "force re-research" semantics. In research-only mode this skips the existing-RESEARCH.md prompt and re-spawns unconditionally. - Neither flag, RESEARCH.md exists : prompt update/view/skip. Mirrors the deleted standalone's existing-artifact menu (#3042 RCA). #3044 (stale slash-command refs): scrubbed five deleted commands from all user-facing surfaces, including English docs, 4 localized doc sets (ja-JP, ko-KR, zh-CN, pt-BR), workflows, templates, and references. /gsd-check-todos → /gsd-capture --list /gsd-new-workspace → /gsd-workspace --new /gsd-status → /gsd-progress /gsd-plan-milestone-gaps → table rows / orphan sections removed (PR #3038 only scrubbed workflows/agent; missed the docs surfaces this PR covers) /gsd-research-phase → /gsd-plan-phase --research-phase Includes a fix to docs/issue-driven-orchestration.md (PR #3036) which itself referenced /gsd-new-workspace 4 times — self-correction. Removed: - get-shit-done/workflows/research-phase.md (orphan, capability absorbed into --research-phase flag) Tests: - tests/bug-3042-3044-research-flag-and-stale-refs.test.cjs — 46 structural-IR tests across both bugs: - argument-hint advertises --research-phase + --view - workflow parses --research-phase, sets RESEARCH_ONLY, early-exits before planner - --view prints RESEARCH.md without spawning - --research forces refresh in research-only mode - existing-RESEARCH.md prompt path with update/view/skip - workflows/research-phase.md is removed - 5 deleted slash-commands absent from 17 English user-facing surfaces + 16 localized doc surfaces (4 locales × 4 docs each) - replacement command tokens present where deleted ones lived 6950/6950 full suite pass. Lints clean. Closes #3042 Closes #3044 Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com> * fix: address all 8 CR findings on PR #3045 Major (3): - get-shit-done/workflows/plan-phase.md:344 — added explicit early-exit guard at Section 5.1: "Skip if RESEARCH_ONLY=true". Without it, an LLM could fall through "use existing, skip to step 6" → planner spawn, violating the research-only contract. The guard makes the early-exit unreachable from any non-research-only branch. - get-shit-done/references/continuation-format.md (3 examples) + zh-CN/.../continuation-format.md (3 examples) — pointed to `/gsd-plan-phase --research-phase` but docs/COMMANDS.md didn't document the flag. Added a full --research-phase + --view + --research modifier section to the /gsd-plan-phase flag table in COMMANDS.md so the canonical reference matches the continuation examples. Minor (5): - docs/FEATURES.md:1632 — `/gsd-plan-phase --research-phase` → `/gsd-plan-phase --research-phase <N>` (include required arg). - get-shit-done/templates/README.md:46 — NN-VALIDATION.md producer reverted from `/gsd-plan-phase --research-phase` (Nyquist) to plain `/gsd-plan-phase` (Nyquist). VALIDATION.md is created during normal Nyquist flow, not research-only mode — the bulk replacement was wrong for that line. - get-shit-done/workflows/help.md:89 — signature line was missing `--research`; added it alongside `--research-phase` and `--view`. - tests/bug-3042-3044-...:197 — promptHasView/promptHasSkip were tautological (matched anywhere in 1700-line workflow). Tightened to a proximity check anchored on "RESEARCH.md already exists" prompt header within a 600-char window. Updated workflow to emit that literal phrase. - tests/feat-2840-...:95 — workspace assertion used `/gsd-workspace` but the documented replacement is `/gsd-workspace --new`. Tightened to require both tokens (in 3 places: requiredCommands list, regex in conceptPairs, error message). 6950/6950 full suite pass. Lint clean. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 4.7 <noreply@anthropic.com>
4.2 KiB
4.2 KiB
续接格式
完成命令或工作流后展示下一步的标准格式。
核心结构
---
## ▶ 下一步
**{标识符}: {名称}** — {单行描述}
`{可复制粘贴的命令}`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
**也可选:**
- `{备选项 1}` — 描述
- `{备选项 2}` — 描述
---
格式规则
- 始终展示它是什么 — 名称 + 描述,绝不仅仅是一个命令路径
- 从源文件拉取上下文 — ROADMAP.md 用于阶段,PLAN.md
<objective>用于计划 - 命令用内联代码 — 反引号,易于复制粘贴,渲染为可点击链接
/clear说明 — 始终包含,保持简洁但解释原因- 用"也可选"而非"其他选项" — 听起来更像应用
- 视觉分隔符 — 上下用
---使其突出
变体
执行下一个计划
---
## ▶ 下一步
**02-03: 刷新令牌轮换** — 添加带滑动过期的 /api/auth/refresh
`/gsd-execute-phase 2`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
**也可选:**
- 执行前审查计划
- `/gsd-list-phase-assumptions 2` — 检查假设
---
执行阶段中最后一个计划
添加注释说明这是最后一个计划以及接下来是什么:
---
## ▶ 下一步
**02-03: 刷新令牌轮换** — 添加带滑动过期的 /api/auth/refresh
<sub>阶段 2 的最后一个计划</sub>
`/gsd-execute-phase 2`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
**完成后:**
- 阶段 2 → 阶段 3 过渡
- 下一步:**阶段 3: 核心功能** — 用户仪表板和设置
---
规划阶段
---
## ▶ 下一步
**阶段 2: 认证** — 带刷新令牌的 JWT 登录流程
`/gsd-plan-phase 2`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
**也可选:**
- `/gsd-discuss-phase 2` — 先收集上下文
- `/gsd-plan-phase --research-phase 2` — 调查未知项
- 审查路线图
---
阶段完成,准备下一步
在下一步操作前显示完成状态:
---
## ✓ 阶段 2 完成
3/3 计划已执行
## ▶ 下一步
**阶段 3: 核心功能** — 用户仪表板、设置和数据导出
`/gsd-plan-phase 3`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
**也可选:**
- `/gsd-discuss-phase 3` — 先收集上下文
- `/gsd-plan-phase --research-phase 3` — 调查未知项
- 回顾阶段 2 构建的内容
---
多个同等选项
当没有明确的主要操作时:
---
## ▶ 下一步
**阶段 3: 核心功能** — 用户仪表板、设置和数据导出
**直接规划:** `/gsd-plan-phase 3`
**先讨论上下文:** `/gsd-discuss-phase 3`
**研究未知项:** `/gsd-plan-phase --research-phase 3`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
里程碑完成
---
## 🎉 里程碑 v1.0 完成
全部 4 个阶段已发布
## ▶ 下一步
**开始 v1.1** — 提问 → 研究 → 需求 → 路线图
`/gsd-new-milestone`
<sub>`/clear` 优先 → 全新上下文窗口</sub>
---
拉取上下文
用于阶段(从 ROADMAP.md):
### 阶段 2: 认证
**目标**: 带刷新令牌的 JWT 登录流程
提取:**阶段 2: 认证** — 带刷新令牌的 JWT 登录流程
用于计划(从 ROADMAP.md):
计划:
- [ ] 02-03: 添加刷新令牌轮换
或从 PLAN.md <objective>:
<objective>
添加带滑动过期窗口的刷新令牌轮换。
目的: 在不影响安全性的前提下延长会话生命周期。
</objective>
提取:**02-03: 刷新令牌轮换** — 添加带滑动过期的 /api/auth/refresh
反模式
不要:仅命令(无上下文)
## 继续
运行 `/clear`,然后粘贴:
/gsd-execute-phase 2
用户不知道 02-03 是关于什么的。
不要:缺少 /clear 说明
`/gsd-plan-phase 3`
先运行 /clear。
没有解释原因。用户可能跳过。
不要:"其他选项" 措辞
其他选项:
- 审查路线图
听起来像是事后补充。用"也可选:"替代。
不要:用围栏代码块展示命令
/gsd-plan-phase 3
模板内的围栏代码块会造成嵌套歧义。用内联反引号替代。