* test(#2522): wrapped + blank-line success-criteria parse * fix(#2522): fold wrapped success-criteria lines into their criterion * chore(#2522): backfill changeset pr to 2637
602 B
602 B
type, pr
| type | pr |
|---|---|
| Fixed | 2637 |
roadmap get-phase no longer drops success criteria that wrap onto a second line — the parser broke the criteria run at any indented continuation line, truncating the wrapped criterion (losing its trailing [REQ-ID] tag) and silently dropping every criterion below it. verify-work and plan-phase consumed the shortened list, so a phase could be planned and certified complete against a strict subset of its own success criteria with nothing reporting the gap. Continuation lines now fold into their criterion; blank-line-separated criteria still parse. (#2522)