* feat(gsd-tools): add history-digest, atomic state operations, and summary variants Adds new performance-focused commands to gsd-tools and introduces specialized summary templates to reduce context tax: - history-digest: Compiles phase summaries into structured JSON for JIT loading - state get/patch: Enables atomic STATE.md operations instead of full rewrites - template select: Automatically chooses optimal summary template based on plan complexity - Adds minimal, standard, and complex summary templates Part of the "Hydra" architecture for GSD context optimization. Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com> * chore: add project config * docs: define v1 requirements * docs: create roadmap (6 phases) * feat(history-digest): fix nested YAML parsing and add tests - Fix extractFrontmatter() to handle nested YAML structures like dependency-graph.provides, tech-stack.added using stack-based parsing - Add test infrastructure with Node test runner (npm test) - Update gsd-planner to use digest fields directly instead of reading full SUMMARY.md files - Add 6 schema validation tests covering nested fields, merging, malformed files, and backward compatibility Closes: HIST-01, HIST-02, HIST-03, HIST-04 Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com> * fix(planner): use digest for selection, full SUMMARY for understanding The previous commit went too far by eliminating full SUMMARY reads. The digest is an index for smart selection, not a replacement for understanding what actually happened. Two-step approach: 1. Digest to score/select relevant phases (2-4 typically) 2. Full SUMMARY read for selected phases (implementation details) 3. Digest-level context retained for unselected phases Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com> * feat(gsd-tools): add phases, roadmap, and phase commands TDD implementation of three new commands to replace repetitive bash: phases list [--type plans|summaries] [--phase N] - Lists phase directories sorted numerically (handles decimals) - Filter by file type or specific phase - Replaces: ls -d .planning/phases/*/ | sort -V (22 occurrences) roadmap get-phase <N> - Extracts phase section from ROADMAP.md - Returns name, goal, full section content - Replaces: grep -A20 "Phase X:" ROADMAP.md (19 occurrences) phase next-decimal <N> - Calculates next decimal phase (06 → 06.1, 06.2 → 06.3) - Handles gaps, normalizes input - Replaces: complex bash math in insert-phase (3 occurrences) 16 new tests, all passing. Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com> * refactor: migrate agents/workflows to use gsd-tools commands Replace inline bash patterns with centralized gsd-tools commands: phases list: - audit-milestone.md: ls -d .planning/phases/*/ | sort -V - plan-milestone-gaps.md: ls -d ... | sort -V | tail -1 roadmap get-phase: - plan-phase.md: grep -A5 "Phase X:" ROADMAP.md (2 occurrences) - research-phase.md: grep patterns (2 occurrences) - verify-phase.md: grep -A5 pattern - gsd-verifier.md: grep -A5 pattern - gsd-plan-checker.md: grep -A10 pattern - commands/gsd/research-phase.md: grep patterns (2 occurrences) phase next-decimal: - insert-phase.md: complex bash decimal calculation - decimal-phase-calculation.md: reference doc rewritten phase-argument-parsing.md: updated to reference gsd-tools Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 4.5 <noreply@anthropic.com>
7.0 KiB
<required_reading> Read all files referenced by the invoking prompt's execution_context before starting. </required_reading>
0. Initialize Milestone Context
INIT=$(node ~/.claude/get-shit-done/bin/gsd-tools.js init milestone-op)
Extract from init JSON: milestone_version, milestone_name, phase_count, completed_phases, commit_docs.
Resolve integration checker model:
CHECKER_MODEL=$(node ~/.claude/get-shit-done/bin/gsd-tools.js resolve-model gsd-integration-checker --raw)
1. Determine Milestone Scope
# Get phases in milestone (sorted numerically, handles decimals)
node ~/.claude/get-shit-done/bin/gsd-tools.js phases list
- Parse version from arguments or detect current from ROADMAP.md
- Identify all phase directories in scope
- Extract milestone definition of done from ROADMAP.md
- Extract requirements mapped to this milestone from REQUIREMENTS.md
2. Read All Phase Verifications
For each phase directory, read the VERIFICATION.md:
cat .planning/phases/01-*/*-VERIFICATION.md
cat .planning/phases/02-*/*-VERIFICATION.md
# etc.
From each VERIFICATION.md, extract:
- Status: passed | gaps_found
- Critical gaps: (if any — these are blockers)
- Non-critical gaps: tech debt, deferred items, warnings
- Anti-patterns found: TODOs, stubs, placeholders
- Requirements coverage: which requirements satisfied/blocked
If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.
3. Spawn Integration Checker
With phase context collected:
Task(
prompt="Check cross-phase integration and E2E flows.
Phases: {phase_dirs}
Phase exports: {from SUMMARYs}
API routes: {routes created}
Verify cross-phase wiring and E2E user flows.",
subagent_type="gsd-integration-checker",
model="{integration_checker_model}"
)
4. Collect Results
Combine:
- Phase-level gaps and tech debt (from step 2)
- Integration checker's report (wiring gaps, broken flows)
5. Check Requirements Coverage
For each requirement in REQUIREMENTS.md mapped to this milestone:
- Find owning phase
- Check phase verification status
- Determine: satisfied | partial | unsatisfied
6. Aggregate into v{version}-MILESTONE-AUDIT.md
Create .planning/v{version}-v{version}-MILESTONE-AUDIT.md with:
---
milestone: {version}
audited: {timestamp}
status: passed | gaps_found | tech_debt
scores:
requirements: N/M
phases: N/M
integration: N/M
flows: N/M
gaps: # Critical blockers
requirements: [...]
integration: [...]
flows: [...]
tech_debt: # Non-critical, deferred
- phase: 01-auth
items:
- "TODO: add rate limiting"
- "Warning: no password strength validation"
- phase: 03-dashboard
items:
- "Deferred: mobile responsive layout"
---
Plus full markdown report with tables for requirements, phases, integration, tech debt.
Status values:
passed— all requirements met, no critical gaps, minimal tech debtgaps_found— critical blockers existtech_debt— no blockers but accumulated deferred items need review
7. Present Results
Route by status (see <offer_next>).
<offer_next> Output this markdown directly (not as a code block). Route based on status:
If passed:
✓ Milestone {version} — Audit Passed
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
All requirements covered. Cross-phase integration verified. E2E flows complete.
───────────────────────────────────────────────────────────────
▶ Next Up
Complete milestone — archive and tag
/gsd:complete-milestone {version}
/clear first → fresh context window
───────────────────────────────────────────────────────────────
If gaps_found:
⚠ Milestone {version} — Gaps Found
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
Unsatisfied Requirements
{For each unsatisfied requirement:}
- {REQ-ID}: {description} (Phase {X})
- {reason}
Cross-Phase Issues
{For each integration gap:}
- {from} → {to}: {issue}
Broken Flows
{For each flow gap:}
- {flow name}: breaks at {step}
───────────────────────────────────────────────────────────────
▶ Next Up
Plan gap closure — create phases to complete milestone
/gsd:plan-milestone-gaps
/clear first → fresh context window
───────────────────────────────────────────────────────────────
Also available:
- cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
- /gsd:complete-milestone {version} — proceed anyway (accept tech debt)
───────────────────────────────────────────────────────────────
If tech_debt (no blockers but accumulated debt):
⚡ Milestone {version} — Tech Debt Review
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
All requirements met. No critical blockers. Accumulated tech debt needs review.
Tech Debt by Phase
{For each phase with debt:} Phase {X}: {name}
- {item 1}
- {item 2}
Total: {N} items across {M} phases
───────────────────────────────────────────────────────────────
▶ Options
A. Complete milestone — accept debt, track in backlog
/gsd:complete-milestone {version}
B. Plan cleanup phase — address debt before completing
/gsd:plan-milestone-gaps
/clear first → fresh context window
─────────────────────────────────────────────────────────────── </offer_next>
<success_criteria>
- Milestone scope identified
- All phase VERIFICATION.md files read
- Tech debt and deferred gaps aggregated
- Integration checker spawned for cross-phase wiring
- v{version}-MILESTONE-AUDIT.md created
- Results presented with actionable next steps </success_criteria>