Add 10 new CLI commands that replace manual AI orchestration of mechanical, deterministic operations — saving tokens and reducing errors on the most complex GSD workflows. New commands: - phase add <desc> — append phase to roadmap + create directory - phase insert <after> <desc> — insert decimal phase - phase remove <N> [--force] — remove phase with full renumbering - phase complete <N> — mark done, update state + roadmap, detect milestone end - roadmap analyze — unified roadmap parser with disk status - milestone complete <ver> [--name] — archive roadmap/requirements/audit - validate consistency — check phase numbering and disk/roadmap sync - progress [json|table|bar] — render progress in various formats - todo complete <file> — move todo from pending to completed - scaffold [context|uat|verification|phase-dir] — template generation Updated workflows to use new CLI commands: - remove-phase.md: 13 manual steps → 1 CLI call + confirm + commit - add-phase.md: 6 manual steps → 1 CLI call + state update - insert-phase.md: 7 manual steps → 1 CLI call + state update - transition.md: roadmap/state updates delegated to phase complete - progress.md: roadmap parsing delegated to roadmap analyze - complete-milestone.md: archival delegated to milestone complete 75 tests passing (33 new). https://claude.ai/code/session_01UhMGMrNGGn2bfeAi7MBphs
3.5 KiB
3.5 KiB
Insert a decimal phase for urgent work discovered mid-milestone between existing integer phases. Uses decimal numbering (72.1, 72.2, etc.) to preserve the logical sequence of planned phases while accommodating urgent insertions without renumbering the entire roadmap.
<required_reading> Read all files referenced by the invoking prompt's execution_context before starting. </required_reading>
Parse the command arguments: - First argument: integer phase number to insert after - Remaining arguments: phase descriptionExample: /gsd:insert-phase 72 Fix critical auth bug
-> after = 72
-> description = "Fix critical auth bug"
If arguments missing:
ERROR: Both phase number and description required
Usage: /gsd:insert-phase <after> <description>
Example: /gsd:insert-phase 72 Fix critical auth bug
Exit.
Validate first argument is an integer.
Load phase operation context:INIT=$(node ~/.claude/get-shit-done/bin/gsd-tools.js init phase-op "${after_phase}")
Check roadmap_exists from init JSON. If false:
ERROR: No roadmap found (.planning/ROADMAP.md)
Exit.
**Delegate the phase insertion to gsd-tools:**RESULT=$(node ~/.claude/get-shit-done/bin/gsd-tools.js phase insert "${after_phase}" "${description}")
The CLI handles:
- Verifying target phase exists in ROADMAP.md
- Calculating next decimal phase number (checking existing decimals on disk)
- Generating slug from description
- Creating the phase directory (
.planning/phases/{N.M}-{slug}/) - Inserting the phase entry into ROADMAP.md after the target phase with (INSERTED) marker
Extract from result: phase_number, after_phase, name, slug, directory.
- Read
.planning/STATE.md - Under "## Accumulated Context" → "### Roadmap Evolution" add entry:
- Phase {decimal_phase} inserted after Phase {after_phase}: {description} (URGENT)
If "Roadmap Evolution" section doesn't exist, create it.
Present completion summary:Phase {decimal_phase} inserted after Phase {after_phase}:
- Description: {description}
- Directory: .planning/phases/{decimal-phase}-{slug}/
- Status: Not planned yet
- Marker: (INSERTED) - indicates urgent work
Roadmap updated: .planning/ROADMAP.md
Project state updated: .planning/STATE.md
---
## Next Up
**Phase {decimal_phase}: {description}** -- urgent insertion
`/gsd:plan-phase {decimal_phase}`
<sub>`/clear` first -> fresh context window</sub>
---
**Also available:**
- Review insertion impact: Check if Phase {next_integer} dependencies still make sense
- Review roadmap
---
<anti_patterns>
- Don't use this for planned work at end of milestone (use /gsd:add-phase)
- Don't insert before Phase 1 (decimal 0.1 makes no sense)
- Don't renumber existing phases
- Don't modify the target phase content
- Don't create plans yet (that's /gsd:plan-phase)
- Don't commit changes (user decides when to commit) </anti_patterns>
<success_criteria> Phase insertion is complete when:
gsd-tools phase insertexecuted successfully- Phase directory created
- Roadmap updated with new phase entry (includes "(INSERTED)" marker)
- STATE.md updated with roadmap evolution note
- User informed of next steps and dependency implications </success_criteria>