Tasks completed: 3/3 - Create verify-work workflow - Create UAT issues template - Refactor verify-work command SUMMARY: .planning/phases/09-integrate-verify-work/09-01-SUMMARY.md
6.4 KiB
Roadmap: GSD Brownfield Support
Overview
Add comprehensive brownfield support to GSD. Users adopting GSD for existing codebases will have a systematic way to capture architectural knowledge before planning begins. A new /gsd:map-codebase workflow will produce structured .planning/codebase/ documents that stay current as plans execute.
Domain Expertise
None - this is internal GSD development following existing command/workflow/template patterns.
Phases
Phase Numbering:
-
Integer phases (1, 2, 3): Planned milestone work
-
Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
-
Phase 1: Templates & Structure - Create codebase map templates and folder structure
-
Phase 2: Map Codebase Command - Build /gsd:map-codebase with parallel Explore agents
-
Phase 3: Integration - Wire brownfield support into existing GSD workflows
Phase Details
Phase 1: Templates & Structure
Goal: Create templates for all codebase map document types and define the folder structure Depends on: Nothing (first phase) Research: Unlikely (established GSD template patterns) Plans: TBD
Documents to template:
- stack.md (languages, frameworks, dependencies)
- architecture.md (patterns, layers, data flow)
- structure.md (directory layout, key files)
- conventions.md (coding standards, naming)
- testing.md (test setup, patterns)
- integrations.md (external services, APIs)
- concerns.md (tech debt, known issues)
Phase 2: Map Codebase Command
Goal: Build the /gsd:map-codebase slash command with parallel Explore agent workflow Depends on: Phase 1 Research: Unlikely (using existing Explore agent patterns, GSD workflow conventions) Plans: TBD
Components:
- Slash command:
commands/gsd/map-codebase.md - Workflow:
get-shit-done/workflows/map-codebase.md - Parallel Explore agent orchestration
- Output to
.planning/codebase/
Phase 3: Integration
Goal: Wire brownfield support into existing GSD workflows Depends on: Phase 2 Research: Unlikely (modifying existing GSD commands, established patterns) Plans: TBD
Integration points:
/gsd:new-project- detect existing code, offer to map first/gsd:plan-phase- load relevant codebase context automatically- Post-execution - update codebase map after plan execution
Phase 4: Plan-Phase Optimizations
Goal: Reduce context usage in /gsd:plan-phase by ~37% through file consolidation and verbosity reduction Depends on: Phase 3 Research: Unlikely (internal optimization of existing files) Plans: TBD
Optimization targets:
- Merge
cli-automation.mdintocheckpoints.md(-15KB) - Compress
plan-format.mdto reference card (-7KB) - Trim
scope-estimation.mdverbosity (-6KB) - Streamline
plan-phase.mdworkflow (-9KB)
Phase 5: TDD Instructions
Goal: Add TDD guidance to GSD so Claude uses test-driven development when appropriate and beneficial Depends on: Phase 4 Research: Unlikely (established TDD patterns, GSD integration points clear) Plans: 2 plans
Plans:
- 05-01: TDD Foundation - Create tdd.md reference, add TDD annotation to plan-format.md
- 05-02: TDD Integration - Update plan-phase.md detection, execute-phase.md execution flow
Phase 6: Frontmatter System Upgrade
Goal: Add YAML frontmatter to SUMMARY.md enabling automatic context assembly via dependency graph Depends on: Phase 5 Plans: 2 plans
Plans:
- 06-01: Frontmatter Schema - Add comprehensive YAML frontmatter to summary.md template with dependency metadata
- 06-02: Intelligent Selection - Implement frontmatter-based context assembly in plan-phase.md
Details: Transform planning from "Claude guesses which summaries to read" to "System automatically assembles optimal context" by:
- Adding frontmatter with subsystem, requires/provides/affects, tech-stack, key-files, key-decisions
- Scanning all summary frontmatter (fast - first ~25 lines each)
- Building dependency graph to auto-select relevant prior phases
- Extracting context from frontmatter before reading full summaries
- Making context assembly deterministic and optimal
Phase 7: Backfill Existing Summaries With Frontmatter
Goal: Backfill YAML frontmatter with dependency graph metadata to Phase 1-6 historical summaries Depends on: Phase 6 Plans: 1 plan
Plans:
- 07-01: Backfill frontmatter to all Phase 1-5 summaries (10 files)
Details: Enable intelligent context assembly for all historical phases by adding consistent frontmatter with subsystem categorization, dependency graph (requires/provides/affects), tech tracking, key decisions, and patterns established.
Phase 8: Improve Roadmap System
Goal: [To be planned] Depends on: Phase 7 Research: Unlikely (internal GSD workflow improvements) Plans: TBD
Plans:
- TBD (run /gsd:plan-phase 8 to break down)
Details: [To be added during planning]
Phase 9: Integrate Verify-Work
Goal: Properly integrate /gsd:verify-work into GSD with workflow delegation, templates, and /gsd:plan-fix command Depends on: Phase 8 Research: Unlikely (refactoring contributed command to match GSD patterns) Plans: TBD
Components:
- Refactor
commands/gsd/verify-work.mdto GSD style (workflow delegation) - Create
workflows/verify-work.mdfor UAT logic - Create
templates/uat-issues.mdfor phase-scoped issues format - Create
commands/gsd/plan-fix.mdfor planning fixes from UAT issues - Update
commands/gsd/progress.mdto offer plan-fix when issues exist - Update README.md with new commands
Details: Community contribution from OracleGreyBeard. Original command works but doesn't follow GSD patterns (no workflow delegation, inline templates, verbose steps). Refactor to match conventions, then add /gsd:plan-fix to complete the verify → fix loop.
Progress
Execution Order: Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6
| Phase | Plans Complete | Status | Completed |
|---|---|---|---|
| 1. Templates & Structure | 3/3 | Complete | 2025-12-17 |
| 2. Map Codebase Command | 2/2 | Complete | 2025-12-17 |
| 3. Integration | 1/1 | Complete | 2025-12-17 |
| 4. Plan-Phase Optimizations | 2/2 | Complete | 2025-12-29 |
| 5. TDD Instructions | 2/2 | Complete | 2025-12-31 |
| 6. Frontmatter System Upgrade | 2/2 | Complete | 2026-01-05 |
| 7. Backfill Existing Summaries | 1/1 | Complete | 2026-01-05 |
| 8. Improve Roadmap System | 1/1 | Complete | 2026-01-05 |
| 9. Integrate Verify-Work | 1/? | In Progress | - |