- Reduced from 103 to 189 lines (thin orchestrator, not workflow) - Added agent: gsd-planner frontmatter - Removed all workflow/reference inclusions - Orchestrator now: validate, parse, spawn agent, handle returns - Planning methodology delegated to gsd-planner agent
4.4 KiB
name, description, argument-hint, context, agent, allowed-tools
| name | description | argument-hint | context | agent | allowed-tools | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| gsd:plan-phase | Create detailed execution plan for a phase (PLAN.md) | [phase] [--gaps] | fork | gsd-planner |
|
Orchestrator role: Parse arguments, validate phase, gather context paths, spawn gsd-planner agent, present results.
Why subagent: Planning burns context fast (reading codebase, building dependency graphs, breaking down tasks). Fresh 200k context for planning. Main context stays lean for user interaction.
Phase number: $ARGUMENTS (optional - auto-detects next unplanned phase if not provided) Gap closure mode: `--gaps` flag triggers gap closure workflowCheck for existing plans:
ls .planning/phases/${PHASE}-*/*-PLAN.md 2>/dev/null
1. Validate Environment
ls .planning/ 2>/dev/null
If not found: Error - user should run /gsd:new-project first.
2. Parse Arguments
Extract from $ARGUMENTS:
- Phase number (integer or decimal like
2.1) --gapsflag for gap closure mode
If no phase number: Detect next unplanned phase from roadmap.
3. Validate Phase
grep -A5 "Phase ${PHASE}:" .planning/ROADMAP.md 2>/dev/null
If not found: Error with available phases. If found: Extract phase number, name, description.
4. Check Existing Plans
ls .planning/phases/${PHASE}-*/*-PLAN.md 2>/dev/null
If exists: Offer: 1) Continue planning, 2) View existing, 3) Replan. Wait for response.
5. Gather Context Paths
Identify context files for the agent:
# Required
STATE=.planning/STATE.md
ROADMAP=.planning/ROADMAP.md
REQUIREMENTS=.planning/REQUIREMENTS.md
# Optional
PHASE_DIR=$(ls -d .planning/phases/${PHASE}-* 2>/dev/null | head -1)
CONTEXT="${PHASE_DIR}/${PHASE}-CONTEXT.md"
RESEARCH="${PHASE_DIR}/${PHASE}-RESEARCH.md"
VERIFICATION="${PHASE_DIR}/${PHASE}-VERIFICATION.md"
UAT="${PHASE_DIR}/${PHASE}-UAT.md"
6. Spawn gsd-planner Agent
Fill prompt and spawn:
<planning_context>
**Phase:** {phase_number}
**Mode:** {standard | gap_closure}
**Project State:**
@.planning/STATE.md
**Roadmap:**
@.planning/ROADMAP.md
**Requirements (if exists):**
@.planning/REQUIREMENTS.md
**Phase Context (if exists):**
@.planning/phases/{phase_dir}/{phase}-CONTEXT.md
**Research (if exists):**
@.planning/phases/{phase_dir}/{phase}-RESEARCH.md
**Gap Closure (if --gaps mode):**
@.planning/phases/{phase_dir}/{phase}-VERIFICATION.md
@.planning/phases/{phase_dir}/{phase}-UAT.md
</planning_context>
<downstream_consumer>
Output consumed by /gsd:execute-phase or /gsd:execute-plan
Plans must be executable prompts with:
- Frontmatter (wave, depends_on, files_modified, autonomous)
- Tasks in XML format
- Verification criteria
- must_haves for goal-backward verification
</downstream_consumer>
<quality_gate>
Before returning PLANNING COMPLETE:
- [ ] PLAN.md files created in phase directory
- [ ] Each plan has valid frontmatter
- [ ] Tasks are specific and actionable
- [ ] Dependencies correctly identified
- [ ] Waves assigned for parallel execution
- [ ] must_haves derived from phase goal
</quality_gate>
Task(
prompt=filled_prompt,
subagent_type="gsd-planner",
description="Plan Phase {phase}"
)
7. Handle Agent Return
## PLANNING COMPLETE: Display summary, offer: Execute phase, Review plans, Adjust, Done.
## CHECKPOINT REACHED: Present to user, get response, spawn continuation.
## PLANNING INCONCLUSIVE: Show what was attempted, offer: Add context, Retry, Manual.
8. Spawn Continuation Agent
<objective>
Continue planning for Phase {phase_number}: {phase_name}
</objective>
<prior_state>
Phase directory: @.planning/phases/{phase_dir}/
Existing plans: @.planning/phases/{phase_dir}/*-PLAN.md
</prior_state>
<checkpoint_response>
**Type:** {checkpoint_type}
**Response:** {user_response}
</checkpoint_response>
Task(
prompt=continuation_prompt,
subagent_type="gsd-planner",
description="Continue planning Phase {phase}"
)
<success_criteria>
- .planning/ directory validated
- Phase validated against roadmap
- Existing plans checked
- gsd-planner spawned with context
- Checkpoints handled correctly
- User knows next steps (execute or review) </success_criteria>