* fix: change nyquist_validation default to true and harden absent-key skip conditions new-project.md never wrote the key, so agents reading config directly treated absent as falsy. Changed all agent skip conditions from "is false" to "explicitly set to false; absent = enabled". Default changed from false to true in core.cjs, config.cjs, and templates/config.json. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> * fix: enforce VALIDATION.md creation with verification gate and Check 8e Step 5.5 was narrative markdown that Claude skipped under context pressure. Now MANDATORY with Write tool requirement and file-existence verification. Step 7.5 gates planner spawn on VALIDATION.md presence. Check 8e blocks Dimension 8 if file missing. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> * feat: add W008/W009 health checks and addNyquistKey repair for Nyquist drift detection W008 warns when workflow.nyquist_validation key is absent from config.json (agents may skip validation). W009 warns when RESEARCH.md has Validation Architecture section but no VALIDATION.md file exists. addNyquistKey repair adds the missing key with default true value. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> * feat: add /gsd:validate-phase command and gsd-nyquist-auditor agent Retroactively applies Nyquist validation to already-executed phases. Works mid-milestone and post-milestone. Detects existing test coverage, maps gaps to phase requirements, writes missing tests, debugs failing ones, and produces {phase}-VALIDATION.md from existing artifacts. Handles three states: VALIDATION.md exists (audit + update), no VALIDATION.md (reconstruct from PLAN.md + SUMMARY.md), phase not yet executed (exit cleanly with guidance). Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> * feat: audit-milestone reports Nyquist compliance gaps across phases Adds Nyquist coverage table to audit-milestone output when workflow.nyquist_validation is true. Identifies phases missing VALIDATION.md or with nyquist_compliant: false/partial. Routes to /gsd:validate-phase for resolution. Updates USER-GUIDE with retroactive validation documentation. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> * refactor: compress Nyquist prompts to match GSD meta-prompt density conventions Auditor agent: deleted philosophy section (35 lines), compressed execution flow 60%, removed redundant constraints. Workflow: cut purpose bloat, collapsed state narrative, compressed auditor spawn template. Command: removed redundant process section. Plan-phase Steps 5.5/7.5: replaced hedging language with directives. Audit-milestone Step 5.5: collapsed sub-steps into inline instructions. Net: -376 lines. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 4.6 <noreply@anthropic.com>
11 KiB
<required_reading> Read all files referenced by the invoking prompt's execution_context before starting. </required_reading>
0. Initialize Milestone Context
INIT=$(node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" init milestone-op)
Extract from init JSON: milestone_version, milestone_name, phase_count, completed_phases, commit_docs.
Resolve integration checker model:
integration_checker_model=$(node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" resolve-model gsd-integration-checker --raw)
1. Determine Milestone Scope
# Get phases in milestone (sorted numerically, handles decimals)
node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" phases list
- Parse version from arguments or detect current from ROADMAP.md
- Identify all phase directories in scope
- Extract milestone definition of done from ROADMAP.md
- Extract requirements mapped to this milestone from REQUIREMENTS.md
2. Read All Phase Verifications
For each phase directory, read the VERIFICATION.md:
# For each phase, use find-phase to resolve the directory (handles archived phases)
PHASE_INFO=$(node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" find-phase 01 --raw)
# Extract directory from JSON, then read VERIFICATION.md from that directory
# Repeat for each phase number from ROADMAP.md
From each VERIFICATION.md, extract:
- Status: passed | gaps_found
- Critical gaps: (if any — these are blockers)
- Non-critical gaps: tech debt, deferred items, warnings
- Anti-patterns found: TODOs, stubs, placeholders
- Requirements coverage: which requirements satisfied/blocked
If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.
3. Spawn Integration Checker
With phase context collected:
Extract MILESTONE_REQ_IDS from REQUIREMENTS.md traceability table — all REQ-IDs assigned to phases in this milestone.
Task(
prompt="Check cross-phase integration and E2E flows.
Phases: {phase_dirs}
Phase exports: {from SUMMARYs}
API routes: {routes created}
Milestone Requirements:
{MILESTONE_REQ_IDS — list each REQ-ID with description and assigned phase}
MUST map each integration finding to affected requirement IDs where applicable.
Verify cross-phase wiring and E2E user flows.",
subagent_type="gsd-integration-checker",
model="{integration_checker_model}"
)
4. Collect Results
Combine:
- Phase-level gaps and tech debt (from step 2)
- Integration checker's report (wiring gaps, broken flows)
5. Check Requirements Coverage (3-Source Cross-Reference)
MUST cross-reference three independent sources for each requirement:
5a. Parse REQUIREMENTS.md Traceability Table
Extract all REQ-IDs mapped to milestone phases from the traceability table:
- Requirement ID, description, assigned phase, current status, checked-off state (
[x]vs[ ])
5b. Parse Phase VERIFICATION.md Requirements Tables
For each phase's VERIFICATION.md, extract the expanded requirements table:
- Requirement | Source Plan | Description | Status | Evidence
- Map each entry back to its REQ-ID
5c. Extract SUMMARY.md Frontmatter Cross-Check
For each phase's SUMMARY.md, extract requirements-completed from YAML frontmatter:
for summary in .planning/phases/*-*/*-SUMMARY.md; do
node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" summary-extract "$summary" --fields requirements_completed | jq -r '.requirements_completed'
done
5d. Status Determination Matrix
For each REQ-ID, determine status using all three sources:
| VERIFICATION.md Status | SUMMARY Frontmatter | REQUIREMENTS.md | → Final Status |
|---|---|---|---|
| passed | listed | [x] |
satisfied |
| passed | listed | [ ] |
satisfied (update checkbox) |
| passed | missing | any | partial (verify manually) |
| gaps_found | any | any | unsatisfied |
| missing | listed | any | partial (verification gap) |
| missing | missing | any | unsatisfied |
5e. FAIL Gate and Orphan Detection
REQUIRED: Any unsatisfied requirement MUST force gaps_found status on the milestone audit.
Orphan detection: Requirements present in REQUIREMENTS.md traceability table but absent from ALL phase VERIFICATION.md files MUST be flagged as orphaned. Orphaned requirements are treated as unsatisfied — they were assigned but never verified by any phase.
5.5. Nyquist Compliance Discovery
Skip if workflow.nyquist_validation is explicitly false (absent = enabled).
NYQUIST_CONFIG=$(node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" config get workflow.nyquist_validation --raw 2>/dev/null)
If false: skip entirely.
For each phase directory, check *-VALIDATION.md. If exists, parse frontmatter (nyquist_compliant, wave_0_complete).
Classify per phase:
| Status | Condition |
|---|---|
| COMPLIANT | nyquist_compliant: true and all tasks green |
| PARTIAL | VALIDATION.md exists, nyquist_compliant: false or red/pending |
| MISSING | No VALIDATION.md |
Add to audit YAML: nyquist: { compliant_phases, partial_phases, missing_phases, overall }
Discovery only — never auto-calls /gsd:validate-phase.
6. Aggregate into v{version}-MILESTONE-AUDIT.md
Create .planning/v{version}-v{version}-MILESTONE-AUDIT.md with:
---
milestone: {version}
audited: {timestamp}
status: passed | gaps_found | tech_debt
scores:
requirements: N/M
phases: N/M
integration: N/M
flows: N/M
gaps: # Critical blockers
requirements:
- id: "{REQ-ID}"
status: "unsatisfied | partial | orphaned"
phase: "{assigned phase}"
claimed_by_plans: ["{plan files that reference this requirement}"]
completed_by_plans: ["{plan files whose SUMMARY marks it complete}"]
verification_status: "passed | gaps_found | missing | orphaned"
evidence: "{specific evidence or lack thereof}"
integration: [...]
flows: [...]
tech_debt: # Non-critical, deferred
- phase: 01-auth
items:
- "TODO: add rate limiting"
- "Warning: no password strength validation"
- phase: 03-dashboard
items:
- "Deferred: mobile responsive layout"
---
Plus full markdown report with tables for requirements, phases, integration, tech debt.
Status values:
passed— all requirements met, no critical gaps, minimal tech debtgaps_found— critical blockers existtech_debt— no blockers but accumulated deferred items need review
7. Present Results
Route by status (see <offer_next>).
<offer_next> Output this markdown directly (not as a code block). Route based on status:
If passed:
✓ Milestone {version} — Audit Passed
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
All requirements covered. Cross-phase integration verified. E2E flows complete.
───────────────────────────────────────────────────────────────
▶ Next Up
Complete milestone — archive and tag
/gsd:complete-milestone {version}
/clear first → fresh context window
───────────────────────────────────────────────────────────────
If gaps_found:
⚠ Milestone {version} — Gaps Found
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
Unsatisfied Requirements
{For each unsatisfied requirement:}
- {REQ-ID}: {description} (Phase {X})
- {reason}
Cross-Phase Issues
{For each integration gap:}
- {from} → {to}: {issue}
Broken Flows
{For each flow gap:}
- {flow name}: breaks at {step}
Nyquist Coverage
| Phase | VALIDATION.md | Compliant | Action |
|---|---|---|---|
| {phase} | exists/missing | true/false/partial | /gsd:validate-phase {N} |
Phases needing validation: run /gsd:validate-phase {N} for each flagged phase.
───────────────────────────────────────────────────────────────
▶ Next Up
Plan gap closure — create phases to complete milestone
/gsd:plan-milestone-gaps
/clear first → fresh context window
───────────────────────────────────────────────────────────────
Also available:
- cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
- /gsd:complete-milestone {version} — proceed anyway (accept tech debt)
───────────────────────────────────────────────────────────────
If tech_debt (no blockers but accumulated debt):
⚡ Milestone {version} — Tech Debt Review
Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md
All requirements met. No critical blockers. Accumulated tech debt needs review.
Tech Debt by Phase
{For each phase with debt:} Phase {X}: {name}
- {item 1}
- {item 2}
Total: {N} items across {M} phases
───────────────────────────────────────────────────────────────
▶ Options
A. Complete milestone — accept debt, track in backlog
/gsd:complete-milestone {version}
B. Plan cleanup phase — address debt before completing
/gsd:plan-milestone-gaps
/clear first → fresh context window
─────────────────────────────────────────────────────────────── </offer_next>
<success_criteria>
- Milestone scope identified
- All phase VERIFICATION.md files read
- SUMMARY.md
requirements-completedfrontmatter extracted for each phase - REQUIREMENTS.md traceability table parsed for all milestone REQ-IDs
- 3-source cross-reference completed (VERIFICATION + SUMMARY + traceability)
- Orphaned requirements detected (in traceability but absent from all VERIFICATIONs)
- Tech debt and deferred gaps aggregated
- Integration checker spawned with milestone requirement IDs
- v{version}-MILESTONE-AUDIT.md created with structured requirement gap objects
- FAIL gate enforced — any unsatisfied requirement forces gaps_found status
- Nyquist compliance scanned for all milestone phases (if enabled)
- Missing VALIDATION.md phases flagged with validate-phase suggestion
- Results presented with actionable next steps </success_criteria>