Files
msd-core/docs/reference/planning-artifacts.md
Joe 5e8a723089 feat(templates): add optional Business Context section to PROJECT.md template (#756)
* feat(templates): add optional Business Context section to PROJECT.md template

Adds an optional `## Business Context` section (Customer, Revenue model,
Success metric, Strategy notes) between Core Value and Requirements, for
monetized or customer-facing projects. Optional by default — an HTML comment
tells non-business projects to delete it; capped at four one-line fields to
stay a constraint reference, not a business plan. The milestone evolution
review in complete-milestone.md checks it only when the section is present.

Refs #72

* chore(changeset): set pr number for #72 fragment

* test(#72): add source-text-is-the-product exemption marker

Addresses review Minor #1 on PR #756. The contract test reads the
PROJECT.md template and complete-milestone workflow .md files and
asserts on their content (the local/no-source-grep pattern). Those
.md files ARE the product surface, so this is a valid
source-text-is-the-product case. Add the explicit // allow-test-rule
marker per RULESET.TESTS.no-source-grep.exemption so intent is
audit-traceable before the rule promotes to error (#453).

---------

Co-authored-by: Tom Boucher <trekkie@nomorestars.com>
2026-06-10 14:13:01 -04:00

13 KiB

Planning artifacts reference

The .planning/ directory is GSD Core's shared memory for a project. Every workflow reads from it, writes to it, and leaves an auditable trail of decisions. This page maps every file, its purpose, and which command produces or consumes it. See docs index.


Directory layout

.planning/
├── PROJECT.md                          # Project identity and core value
├── ROADMAP.md                          # Milestone + phase listing with goals
├── REQUIREMENTS.md                     # Numbered acceptance criteria
├── STATE.md                            # Living position tracker
├── config.json                         # Workflow and model configuration
├── MILESTONES.md                       # Milestone archive (optional)
├── BACKLOG.md                          # Deferred and future work (optional)
├── LEARNINGS.md                        # Accumulated cross-phase learnings (optional)
├── DECISIONS-INDEX.md                  # Rolling summary of prior decisions (optional)
├── METHODOLOGY.md                      # Reusable interpretive frameworks (optional)
├── HANDOFF.json                        # Machine-readable pause state (transient)
├── codebase/                           # Codebase maps (optional)
│   ├── architecture.md
│   ├── stack.md
│   └── ...
├── intel/                              # Queryable symbol index (optional, intel.enabled)
│   └── API-SURFACE.md
└── phases/
    └── <NN>-<slug>/                    # One directory per phase
        ├── <NN>-CONTEXT.md             # Implementation decisions (discuss-phase)
        ├── <NN>-DISCUSSION-LOG.md      # Human-readable discussion audit (discuss-phase)
        ├── <NN>-RESEARCH.md            # Technical research findings (plan-phase)
        ├── <NN>-VALIDATION.md          # Nyquist test-coverage strategy (plan-phase)
        ├── <NN>-PATTERNS.md            # Codebase analog map (plan-phase, optional)
        ├── <NN>-<PP>-PLAN.md           # Executable plan (plan-phase, one per plan)
        ├── <NN>-<PP>-SUMMARY.md        # Execution record (execute-phase, one per plan)
        ├── <NN>-VERIFICATION.md        # Phase goal verification report (verify-phase)
        ├── <NN>-UAT.md                 # Persistent UAT session state (execute-phase)
        └── .continue-here.md           # Resume instructions after pause (pause-work)

Root-level artifacts

PROJECT.md

Purpose Canonical project identity: what it is, who it is for, core value, requirements, constraints, and key decisions. Updated throughout the project lifecycle as the product evolves.
Produced by /gsd-new-project (initial creation); updated by /gsd-complete-milestone as decisions are validated.
Consumed by All planning workflows; gsd-phase-researcher, gsd-planner (context); discuss-phase (prior decisions); gsd-plan-checker (project constraints).

Includes an optional ## Business Context section (Customer, Revenue model, Success metric, Strategy notes) for monetized or customer-facing projects — four one-line fields that connect business outcomes to requirement prioritization. It is deleted for internal tools, experiments, or meta workspaces, and reviewed at each milestone by /gsd-complete-milestone when present.

ROADMAP.md

Purpose Milestone and phase listing with goals, requirement IDs, success criteria, and canonical references per phase. The single source of truth for what the project is building and in what order.
Produced by /gsd-new-project (initial creation); updated by /gsd-phase --insert and /gsd-complete-milestone.
Consumed by /gsd-discuss-phase, /gsd-plan-phase, /gsd-execute-phase; all orchestration commands that need phase information; gsd-planner, gsd-plan-checker, gsd-phase-researcher.

REQUIREMENTS.md

Purpose Numbered, checkable acceptance criteria for the project. Each requirement carries an ID (e.g., AUTH-01) that maps to roadmap phases. Marks requirements complete as phases are executed.
Produced by /gsd-new-project (initial creation); requirements marked complete by execute-phase.
Consumed by gsd-planner (plans must address all phase requirement IDs); gsd-plan-checker Dimension 1 (requirement coverage); discuss-phase (prior requirements).

STATE.md

Purpose Living position tracker — current phase and plan, progress metrics, accumulated decisions, session continuity notes. Read at the start of every workflow run. Updated after every significant action.
Produced by /gsd-new-project (initial creation); updated continuously by all phase workflows, /gsd-pause-work, /gsd-resume-work.
Consumed by All orchestration workflows; /gsd-progress; ad-hoc task execution via /gsd-quick; gsd-planner and gsd-phase-researcher (project decisions).

See STATE.md schema for the full field reference.

config.json

Purpose Workflow configuration: model profiles, research and plan-checker toggles, git branching strategy, Nyquist validation, parallelisation settings, and per-agent model overrides.
Produced by /gsd-new-project (initial creation); /gsd-settings (interactive editing).
Consumed by Every workflow and subagent — read at init time via gsd-tools query config-get.

See CONFIGURATION for the complete schema.

MILESTONES.md (optional)

Purpose Historical record of completed milestones. Populated as each milestone is closed; provides an archival snapshot of what shipped and when.
Produced by /gsd-complete-milestone.
Consumed by /gsd-audit-milestone; human review.

DECISIONS-INDEX.md (optional)

Purpose Bounded rolling summary of decisions captured in prior-phase CONTEXT.md files. When present, discuss-phase reads this single file instead of reading up to three prior CONTEXT.md files individually, saving context budget.
Produced by Generated when the number of prior phases exceeds the rolling-read threshold.
Consumed by discuss-phase (load_prior_context step).

HANDOFF.json (transient)

Purpose Machine-readable pause state written when work is interrupted. Contains the resume point, in-progress context, and continuation instructions. Consumed exactly once — on resume.
Produced by /gsd-pause-work.
Consumed by /gsd-resume-work.

Per-phase artifacts

All per-phase files live under .planning/phases/<NN>-<slug>/ where NN is the zero-padded phase number and slug is the hyphenated phase name.

<NN>-CONTEXT.md

Purpose Implementation decisions captured before planning begins. Contains the phase boundary (<domain>), locked decisions with D-NN identifiers (<decisions>), canonical document references (<canonical_refs>), existing code insights (<code_context>), specific inspirations (<specifics>), and deferred ideas (<deferred>).
Produced by /gsd-discuss-phase (interactive discussion or PRD/ADR express paths).
Consumed by gsd-phase-researcher (what to investigate); gsd-planner (locked decisions); gsd-plan-checker Dimension 7 (context compliance).

See CONTEXT.md schema for the full field reference.

<NN>-DISCUSSION-LOG.md

Purpose Human-readable audit trail of the discuss-phase session: areas discussed, options presented, selections made, deferred ideas, and items left to Claude's discretion. Not consumed by automated workflows.
Produced by /gsd-discuss-phase (git_commit step).
Consumed by Human review; retrospectives.

<NN>-RESEARCH.md

Purpose Technical research findings produced before planning. Answers "What do I need to know to plan this phase well?" — covers domain analysis, patterns, risks, an Architectural Responsibility Map, and a Validation Architecture section (used by the Nyquist gate).
Produced by /gsd-plan-phase via gsd-phase-researcher agent.
Consumed by gsd-planner (planning inputs); gsd-plan-checker Dimension 7c (tier compliance), Dimension 8 (Nyquist), Dimension 11 (research resolution); gsd-pattern-mapper (file list source).

<NN>-VALIDATION.md

Purpose Nyquist-inspired validation strategy derived from the ## Validation Architecture section of RESEARCH.md. Specifies automated test coverage requirements that plans must honour.
Produced by /gsd-plan-phase (Step 5.5, when workflow.nyquist_validation is enabled and RESEARCH.md contains a Validation Architecture section).
Consumed by gsd-plan-checker Dimension 8 (Check 8e gate — must exist before Nyquist checks proceed); gsd-verifier.

<NN>-PATTERNS.md

Purpose Codebase analog map produced by gsd-pattern-mapper. For each file to be created or modified this phase, identifies the closest existing analog, classifies the file's role and data flow, and extracts concrete code excerpts. Guides the planner towards consistent patterns.
Produced by /gsd-plan-phase via gsd-pattern-mapper agent (optional; skipped if workflow.pattern_mapper: false).
Consumed by gsd-planner (pattern guidance); gsd-plan-checker Dimension 12 (pattern compliance).

<NN>-<PP>-PLAN.md

Purpose Executable plan for a single unit of work within the phase. Contains YAML frontmatter (wave, dependencies, files, requirements, must_haves), an objective, context references, XML-structured tasks with <read_first>, <action>, <verify>, and <acceptance_criteria> fields, and verification criteria.
Produced by /gsd-plan-phase via gsd-planner agent. One file per plan — e.g., 03-02-PLAN.md is Phase 3, Plan 2.
Consumed by /gsd-execute-phase (executor agent reads plan and runs tasks); gsd-plan-checker (pre-execution quality review); gsd-verifier (reads must_haves for post-execution verification).

See PLAN.md schema for the full field reference.

<NN>-<PP>-SUMMARY.md

Purpose Execution record written after a plan completes. Documents what was built, deviations from the plan, a self-check against acceptance criteria, and the dependency graph for the phase.
Produced by execute-phase executor agent (written at the end of each plan's execution).
Consumed by /gsd-progress (phase status); gsd-planner (when a subsequent plan has a genuine dependency on prior plan output); milestone-summary.

<NN>-VERIFICATION.md

Purpose Phase goal verification report. Checks must_haves.truths, must_haves.artifacts, and must_haves.key_links from all plans against the actual codebase after execution. Records `status: passed
Produced by /gsd-verify-work (or the verify step within /gsd-execute-phase).
Consumed by plan-phase closed-phase gate (a status: passed VERIFICATION.md marks the phase Complete and blocks replanning without --force); /gsd-progress; human review.

<NN>-UAT.md

Purpose Persistent UAT session tracking. Records each test case, expected observable behaviour, result, and developer response across a live UAT session. Carries YAML frontmatter (status, phase, source, timestamps).
Produced by /gsd-audit-uat (interactive UAT session).
Consumed by /gsd-audit-uat (resume a previous UAT session).

.continue-here.md

Purpose Human-readable resume instructions written when work on a phase is paused. Contains context for resuming agents: critical anti-patterns, blocking issues, required reading, and the exact command to resume.
Produced by /gsd-pause-work.
Consumed by Any workflow that starts on a phase — discuss-phase and plan-phase both check for this file at entry and require the agent to demonstrate understanding of any blocking anti-patterns before proceeding.

Naming conventions

Segment Format Example
Phase directory <NN>-<slug> 03-post-feed
Phase-level file <NN>-<ARTIFACT>.md 03-CONTEXT.md
Plan-level file <NN>-<PP>-<ARTIFACT>.md 03-02-PLAN.md
NN Zero-padded phase number 03 for Phase 3
PP Zero-padded plan number within phase 02 for Plan 2

When project_code is set in config.json, phase directories use the project code as a prefix: CK-03-post-feed for project code CK, Phase 3.