Mechanical rename produced by scripts/msd-rename.cjs: gsd/Gsd/GSD -> msd/Msd/MSD across contents and paths, upstream package/repo coordinates -> @golem15/msd-core and golem15com/msd-core. Deep links into upstream history, sibling upstream packages, the GSD-2 import feature, CHANGELOG.md and .changeset/ are kept as-is. Hand edits on top: MSD block-letter banner and logos, LICENSE copyright line, package/plugin identity, regenerated lockfile, install-tree fixtures, derived registries and benchmark baseline; migration checksum baseline re-locked (MSD keeps its own install state, so no install had applied the old sums); sort-order and regex-escaped expectations in tests adjusted.
1.1 KiB
1.1 KiB
name, description, argument-hint, allowed-tools, requires
| name | description | argument-hint | allowed-tools | requires | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| msd:audit-milestone | Audit milestone completion against original intent before archiving | [version] |
|
|
This command IS the orchestrator. Reads existing VERIFICATION.md files (phases already verified during execute-phase), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring.
<execution_context> @~/.claude/msd-core/workflows/audit-milestone.md </execution_context>
Version: $ARGUMENTS (optional — defaults to current milestone)Core planning files are resolved in-workflow (init milestone-op) and loaded only as needed.
Completed Work: Glob: .planning/phases//-SUMMARY.md Glob: .planning/phases//-VERIFICATION.md
Execute end-to-end. Preserve all workflow gates (scope determination, verification reading, integration check, requirements coverage, routing).