- Replaced 868-line workflow with deprecation notice - Points to agents/gsd-planner.md for methodology - Documents historical content for reference - Kept file for git history
1.2 KiB
1.2 KiB
DEPRECATED: Plan-Phase Workflow
This workflow has been consolidated into the gsd-planner agent.
Migration
Planning expertise is now baked into:
agents/gsd-planner.md- Complete planning methodology
The /gsd:plan-phase command spawns the gsd-planner agent directly.
Why This Changed
The thin orchestrator pattern reduces main context usage:
- Before: ~3,580 lines loaded into main context
- After: ~150 lines in orchestrator, expertise in agent
Historical Reference
This file previously contained:
- Decimal phase numbering rules
- Required reading list (8 reference files)
- Planning principles and philosophy
- Discovery level definitions (Level 0-3)
- Project history assembly via frontmatter dependency graph
- Gap closure mode process
- Task breakdown with TDD detection
- Dependency graph building
- Wave assignment algorithm
- Plan grouping rules
- Scope estimation and depth calibration
- Phase prompt writing (PLAN.md structure)
- User setup frontmatter for external services
- Git commit step
- Success criteria (standard and gap closure modes)
All content preserved in agents/gsd-planner.md.
Deprecated: 2026-01-16 Replaced by: agents/gsd-planner.md