Tibsfox 3a277f8ba8 feat(next): add hard stop safety gates and consecutive-call guard (#1784)
Add three hard-stop checks to /gsd-next that prevent blind advancement:
1. Unresolved .continue-here.md checkpoint from a previous session
2. Error/failed state in STATE.md
3. Unresolved FAIL items in VERIFICATION.md

Also add a consecutive-call budget guard that prompts after 6
consecutive /gsd-next calls, preventing runaway automation loops.

All gates are bypassed with --force (prints a one-line warning).
Gates run in order and exit on the first hit to give clear,
actionable diagnostics.

Closes #1732

Co-authored-by: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 17:05:06 -04:00

4.8 KiB

Detect current project state and automatically advance to the next logical GSD workflow step. Reads project state to determine: discuss → plan → execute → verify → complete progression.

<required_reading> Read all files referenced by the invoking prompt's execution_context before starting. </required_reading>

Read project state to determine current position:
# Get state snapshot
node "$HOME/.claude/get-shit-done/bin/gsd-tools.cjs" state json 2>/dev/null || echo "{}"

Also read:

  • .planning/STATE.md — current phase, progress, plan counts
  • .planning/ROADMAP.md — milestone structure and phase list

Extract:

  • current_phase — which phase is active
  • plan_of / plans_total — plan execution progress
  • progress — overall percentage
  • status — active, paused, etc.

If no .planning/ directory exists:

No GSD project detected. Run `/gsd-new-project` to get started.

Exit.

Run hard-stop checks before routing. Exit on first hit unless `--force` was passed.

If --force flag was passed, skip all gates and the consecutive guard. Print a one-line warning: ⚠ --force: skipping safety gates Then proceed directly to determine_next_action.

Gate 1: Unresolved checkpoint Check if .planning/.continue-here.md exists:

[ -f .planning/.continue-here.md ]

If found:

⛔ Hard stop: Unresolved checkpoint

`.planning/.continue-here.md` exists — a previous session left
unfinished work that needs manual review before advancing.

Read the file, resolve the issue, then delete it to continue.
Use `--force` to bypass this check.

Exit (do not route).

Gate 2: Error state Check if STATE.md contains status: error or status: failed: If found:

⛔ Hard stop: Project in error state

STATE.md shows status: {status}. Resolve the error before advancing.
Run `/gsd-health` to diagnose, or manually fix STATE.md.
Use `--force` to bypass this check.

Exit.

Gate 3: Unchecked verification Check if the current phase has a VERIFICATION.md with any FAIL items that don't have overrides: If found:

⛔ Hard stop: Unchecked verification failures

VERIFICATION.md for phase {N} has {count} unresolved FAIL items.
Address the failures or add overrides before advancing to the next phase.
Use `--force` to bypass this check.

Exit.

Consecutive-call guard: After passing all gates, check a counter file .planning/.next-call-count:

  • If file exists and count >= 6: prompt "You've called /gsd-next {N} times consecutively. Continue? [y/N]"
  • If user says no, exit
  • Increment the counter
  • The counter file is deleted by any non-/gsd-next command (convention — other workflows don't need to implement this, the note here is sufficient)
Apply routing rules based on state:

Route 1: No phases exist yet → discuss If ROADMAP has phases but no phase directories exist on disk: → Next action: /gsd-discuss-phase <first-phase>

Route 2: Phase exists but has no CONTEXT.md or RESEARCH.md → discuss If the current phase directory exists but has neither CONTEXT.md nor RESEARCH.md: → Next action: /gsd-discuss-phase <current-phase>

Route 3: Phase has context but no plans → plan If the current phase has CONTEXT.md (or RESEARCH.md) but no PLAN.md files: → Next action: /gsd-plan-phase <current-phase>

Route 4: Phase has plans but incomplete summaries → execute If plans exist but not all have matching summaries: → Next action: /gsd-execute-phase <current-phase>

Route 5: All plans have summaries → verify and complete If all plans in the current phase have summaries: → Next action: /gsd-verify-work

Route 6: Phase complete, next phase exists → advance If the current phase is complete and the next phase exists in ROADMAP: → Next action: /gsd-discuss-phase <next-phase>

Route 7: All phases complete → complete milestone If all phases are complete: → Next action: /gsd-complete-milestone

Route 8: Paused → resume If STATE.md shows paused_at: → Next action: /gsd-resume-work

Display the determination:
## GSD Next

**Current:** Phase [N] — [name] | [progress]%
**Status:** [status description]

▶ **Next step:** `/gsd-[command] [args]`
  [One-line explanation of why this is the next step]

Then immediately invoke the determined command via SlashCommand. Do not ask for confirmation — the whole point of /gsd-next is zero-friction advancement.

<success_criteria>

  • Project state correctly detected
  • Next action correctly determined from routing rules
  • Command invoked immediately without user confirmation
  • Clear status shown before invoking </success_criteria>