Mirror of code, issues, and PRs from the upstream gsd-build/get-shit-done, which appears compromised or abandoned (maintainer unreachable since 2026-04-01; $GSD token linked to rug-pull). - Adds rebrand notice block at top of English README - Removes $GSD token badge and @gsd_foundation X badge (keeps Discord) - Renames npm packages: get-shit-done-cc -> get-shit-done-redux, @gsd-build/sdk -> @gsd-redux/sdk - Updates all repo URLs across docs, workflows, package.json, bin/ - Updates ci@gsd-build -> ci@gsd-redux in workflow git identities - Leaves CHANGELOG and .changeset/* alone (historical, time-stamped)
2.0 KiB
2.0 KiB
⚠️ Wrong template — please use the correct one for your PR type
Every PR must use a typed template. Using this default template is a reason for rejection.
Select the template that matches your PR:
| PR Type | When to use | Template link |
|---|---|---|
| Fix | Correcting a bug, crash, or behavior that doesn't match documentation | Use fix template |
| Enhancement | Improving an existing feature — better output, expanded edge cases, performance | Use enhancement template |
| Feature | Adding something new — new command, workflow, concept, or integration | Use feature template |
Not sure which type applies?
- If it corrects broken behavior → Fix
- If it improves existing behavior without adding new commands or concepts → Enhancement
- If it adds something that doesn't exist today → Feature
- If you are not sure → open a Discussion first
Reminder: Issues must be approved before PRs
For enhancements: the linked issue must have the approved-enhancement label before you open this PR.
For features: the linked issue must have the approved-feature label before you open this PR.
PRs that arrive without a labeled, approved issue are closed without review.
No draft PRs. Draft PRs are automatically closed. Only open a PR when your code is complete, tests pass, and the correct template is used. See CONTRIBUTING.md.
See CONTRIBUTING.md for the full process.