Cancelling a running crawl records cancel_requested_at and leaves the
row running until its job stops and writes cancelled, so no second
crawl starts and the row cannot be deleted or pruned meanwhile. The job
writes heartbeat_at every minute; a running crawl without a heartbeat
for 10 minutes is ended by the next start or delete.
The crawl job's context ends on a cancel or at the job timeout. Storing
the pages, links and issues now runs on a context detached from it with
its own 10-minute bound, a timeout ends the crawl failed with a
time-limit error, a LoadLimits failure falls back to the defaults, and a
fetch cut short by the cancellation is recorded as canceled.