diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index 2946b35c..32bf6b01 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -1936,7 +1936,7 @@ Plans: **Requirements**: TBD **Depends on:** Phase 34 **Context:** postcard already loads plugin templates and layouts from `views/mail/` (`pact.HasMailTemplates`, `postcard.BootPlugin`); this phase adds the editable database layer, admin screens and image handling on top. To confirm in discussion: partials (WinterCMS mail partials), preview and test send, per-locale variants, and whether the screens live in cabana or in a plugin. -**Plans:** 6/7 plans executed +**Plans:** 7/7 plans executed Plans: **Wave 1** @@ -1958,4 +1958,4 @@ Plans: - [x] 35-06-PLAN.md — finished default/system/minimal layouts (logo or site name header, card, footer), Branding site name, CSS inlining via go-premailer with a per-layout opt-out, decision note superseding D-10 **Wave 7** *(gap closure, blocked on Wave 6 completion)* -- [ ] 35-07-PLAN.md — unit tests for both gaps and `scripts/check-phase35.sh` with a read-only scratch-modfile consumers stage +- [x] 35-07-PLAN.md — unit tests for both gaps and `scripts/check-phase35.sh` with a read-only scratch-modfile consumers stage diff --git a/.planning/STATE.md b/.planning/STATE.md index 9afd3ee8..221b2d10 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -4,16 +4,16 @@ milestone: v1.0 current_phase: 35 current_phase_name: mail-templates-and-layouts-editor status: verifying -stopped_at: Completed 35-06-PLAN.md -last_updated: "2026-11-13T20:19:22.746Z" +stopped_at: Completed 35-07-PLAN.md +last_updated: "2026-11-13T21:11:21.424Z" last_activity: 2026-11-13 last_activity_desc: Phase 35 execution started -state_head: be9170af53047e0bbbde8edc0cdac394a19bbbc7 +state_head: d00e2c8d6fd1ce688503a47ba127b02cff4e915f progress: total_phases: 52 completed_phases: 37 total_plans: 302 - completed_plans: 290 + completed_plans: 291 gsd_state_version: "1.0" milestone_name: milestone --- @@ -319,6 +319,7 @@ Progress: [████████░░] 82% | Phase 35 P04 | 90 | 4 tasks | 40 files | | Phase 35 P05 | 28 min | 3 tasks | 29 files | | Phase 35 P06 | 33 min | 3 tasks | 34 files | +| Phase 35 P07 | 49 min | 3 tasks | 11 files | ## Accumulated Context @@ -1120,6 +1121,9 @@ Recent decisions affecting current work: - [Phase 35]: 35-06: postcard inlines mail CSS at render with github.com/vanng822/go-premailer v1.38.0 (default options), opt-out via disable_auto_inline_css (layout header key, layouts column, layout form switch); supersedes D-10's inlining claim - [Phase 35]: 35-06: Branding gains Site name (site_name, Brand.SiteName); empty uses the display name of mail.from; default and system layouts show logo or name in the header and a © year name footer - [Phase 35]: 35-06: 35-01's default.htm-unchanged gate lifted; default layout is WinterCMS's default layout on new built-in header and footer partials +- [Phase 35]: 35-07: check-phase35.sh consumers run each core plugin through a scratch -modfile (sibling go.sum merged with the framework's, GOWORK=off, GOPROXY=off) and refuse a sibling that is dirty before or after +- [Phase 35]: 35-07: G-35-8 recorded as framework-closed with the plugin part deferred; UAT test 8 re-run scoped to the built-in layouts (default, system) with logo, site name and the button partial +- [Phase 35]: 35-07: Branding site name with a URL scheme stays an open item; TestMailBrandSiteName pins the current behaviour (saved, preview refused) ### Pending Todos @@ -1267,6 +1271,6 @@ Items acknowledged and carried forward from previous milestone close: ## Session Continuity -Last session: 2026-11-13T20:19:21.645Z -Stopped at: Completed 35-06-PLAN.md +Last session: 2026-11-13T21:11:20.401Z +Stopped at: Completed 35-07-PLAN.md Resume file: None