docs(14.3-02): update state and roadmap after the bootstrap script plan

This commit is contained in:
Jakub Zych
2026-10-08 11:59:00 +02:00
parent e7637a0271
commit 0d117a3e57
2 changed files with 13 additions and 10 deletions

View File

@@ -899,7 +899,7 @@ Plans:
5. `docs/setup/installation.md` leads with the one-liner, `go-modules-and-workspaces.md` and the console docs cover `summer new`, and `llms.txt`/`llms-full.txt` include the changes; docs checks pass. 5. `docs/setup/installation.md` leads with the one-liner, `go-modules-and-workspaces.md` and the console docs cover `summer new`, and `llms.txt`/`llms-full.txt` include the changes; docs checks pass.
6. Generator Go tests (golden output plus a real build of the scaffold in a temp dir) are the last plan. 6. Generator Go tests (golden output plus a real build of the scaffold in a temp dir) are the last plan.
**Plans:** 1/4 plans executed **Plans:** 2/4 plans executed
Plans: Plans:
@@ -907,7 +907,7 @@ Plans:
- [x] 14.3-01-PLAN.md — `summer new` generator: starter plugin via make:plugin/plugin:add, relative go.work, config, .env + lagoon.GenerateAppKey, compose, CLAUDE.md/AGENTS.md, first commit, D-12 docker gate - [x] 14.3-01-PLAN.md — `summer new` generator: starter plugin via make:plugin/plugin:add, relative go.work, config, .env + lagoon.GenerateAppKey, compose, CLAUDE.md/AGENTS.md, first commit, D-12 docker gate
**Wave 2** *(blocked on Wave 1 completion)* **Wave 2** *(blocked on Wave 1 completion)*
- [ ] 14.3-02-PLAN.md — Bootstrap script in `modules/sunrise`, `GET /new` in the site plugin, node:24-bookworm acceptance, security review - [x] 14.3-02-PLAN.md — Bootstrap script in `modules/sunrise`, `GET /new` in the site plugin, node:24-bookworm acceptance, security review
**Wave 3** *(blocked on Wave 2 completion)* **Wave 3** *(blocked on Wave 2 completion)*
- [ ] 14.3-03-PLAN.md — Docs (installation one-liner first, go modules, console, llms) and landing page "Get started" with its tests - [ ] 14.3-03-PLAN.md — Docs (installation one-liner first, go modules, console, llms) and landing page "Get started" with its tests
@@ -1089,7 +1089,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 14. Domain jobs and external integrations | 6/6 | In Progress| | | 14. Domain jobs and external integrations | 6/6 | In Progress| |
| 14.1. OAuth identities and fonoteka me routes (INSERTED) | 2/2 | Complete | 2026-10-05 | | 14.1. OAuth identities and fonoteka me routes (INSERTED) | 2/2 | Complete | 2026-10-05 |
| 14.2. Local Fonoteka frontend on local SummerCMS backend (INSERTED) | 0/TBD | Not started | - | | 14.2. Local Fonoteka frontend on local SummerCMS backend (INSERTED) | 0/TBD | Not started | - |
| 14.3. One-command app scaffolding (INSERTED) | 1/4 | In Progress| | | 14.3. One-command app scaffolding (INSERTED) | 2/4 | In Progress| |
| 15. Journal plugin | 4/4 | Complete | 2026-10-06 | | 15. Journal plugin | 4/4 | Complete | 2026-10-06 |
| 16. grzybyfunkcjonalne.pl on reusable blog views | 0/TBD | Not started | - | | 16. grzybyfunkcjonalne.pl on reusable blog views | 0/TBD | Not started | - |
| 17. Blog companions | 0/TBD | Not started | - | | 17. Blog companions | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "14.3" current_phase: "14.3"
current_phase_name: "One-command app scaffolding: summer new and summercms.io/new bootstrap script" current_phase_name: "One-command app scaffolding: summer new and summercms.io/new bootstrap script"
status: executing status: executing
stopped_at: Completed 14.3-01-PLAN.md stopped_at: Completed 14.3-02-PLAN.md
last_updated: "2026-10-08T09:45:45.397Z" last_updated: "2026-10-08T09:58:54.955Z"
last_activity: 2026-10-08 last_activity: 2026-10-08
last_activity_desc: Phase 14.3 execution started last_activity_desc: Phase 14.3 execution started
state_head: 6695ab422aa0155f49c7ca87bdcb5fbf405c9e35 state_head: e7637a0271409f0fee02b08044c122140a8c8454
progress: progress:
total_phases: 31 total_phases: 31
completed_phases: 13 completed_phases: 13
total_plans: 143 total_plans: 143
completed_plans: 136 completed_plans: 137
milestone_name: milestone milestone_name: milestone
--- ---
@@ -29,7 +29,7 @@ See: .planning/PROJECT.md (updated 2026-09-16)
## Current Position ## Current Position
Phase: 14.3 (One-command app scaffolding: summer new and summercms.io/new bootstrap script) — EXECUTING Phase: 14.3 (One-command app scaffolding: summer new and summercms.io/new bootstrap script) — EXECUTING
Plan: 2 of 4 Plan: 3 of 4
Status: Ready to execute Status: Ready to execute
Last activity: 2026-10-08 — Phase 14.3 execution started Last activity: 2026-10-08 — Phase 14.3 execution started
@@ -190,6 +190,7 @@ Progress: [██████████] 100%
| Phase 15 P15-02 | 75 min | 3 tasks | 39 files | | Phase 15 P15-02 | 75 min | 3 tasks | 39 files |
| Phase 15 P15-03 | 80 min | 3 tasks | 22 files | | Phase 15 P15-03 | 80 min | 3 tasks | 22 files |
| Phase 14.3 P01 | 13 min | 3 tasks | 17 files | | Phase 14.3 P01 | 13 min | 3 tasks | 17 files |
| Phase 14.3 P02 | 11 min | 3 tasks | 11 files |
## Accumulated Context ## Accumulated Context
@@ -609,6 +610,8 @@ Recent decisions affecting current work:
- [Phase 14.3]: summer new compose.yaml publishes postgres:16 on 127.0.0.1:54320 only (user/password summer) - [Phase 14.3]: summer new compose.yaml publishes postgres:16 on 127.0.0.1:54320 only (user/password summer)
- [Phase 14.3]: summer new falls back to SummerCMS <summer@localhost> only for missing git identity keys - [Phase 14.3]: summer new falls back to SummerCMS <summer@localhost> only for missing git identity keys
- [Phase 14.3]: plugin:add writes go.work use paths relative to the go.work directory - [Phase 14.3]: plugin:add writes go.work use paths relative to the go.work directory
- [Phase 14.3]: Bootstrap script lives in modules/sunrise (new.sh + Script()); served by the site plugin at GET /new as text/plain
- [Phase 14.3]: new.sh installs summer with GOWORK=off and never deletes, resets or force-fetches; refusals for branch, dirty, moved-tag and non-fast-forward checkouts
### Pending Todos ### Pending Todos
@@ -671,6 +674,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-10-08T09:45:44.793Z Last session: 2026-10-08T09:58:54.378Z
Stopped at: Completed 14.3-01-PLAN.md Stopped at: Completed 14.3-02-PLAN.md
Resume file: None Resume file: None