docs(35-06): update state and roadmap after plan 35-06
This commit is contained in:
@@ -1936,7 +1936,7 @@ Plans:
|
||||
**Requirements**: TBD
|
||||
**Depends on:** Phase 34
|
||||
**Context:** postcard already loads plugin templates and layouts from `views/mail/` (`pact.HasMailTemplates`, `postcard.BootPlugin`); this phase adds the editable database layer, admin screens and image handling on top. To confirm in discussion: partials (WinterCMS mail partials), preview and test send, per-locale variants, and whether the screens live in cabana or in a plugin.
|
||||
**Plans:** 5/7 plans executed
|
||||
**Plans:** 6/7 plans executed
|
||||
|
||||
Plans:
|
||||
**Wave 1**
|
||||
@@ -1955,7 +1955,7 @@ Plans:
|
||||
- [x] 35-05-PLAN.md — one admin record per mail template with a locale switcher, fallback-locale versions, send resolution of `<template>-<locale>`, decision note superseding D-05
|
||||
|
||||
**Wave 6** *(gap closure G-35-8, blocked on Wave 5 completion)*
|
||||
- [ ] 35-06-PLAN.md — finished default/system/minimal layouts (logo or site name header, card, footer), Branding site name, CSS inlining via go-premailer with a per-layout opt-out, decision note superseding D-10
|
||||
- [x] 35-06-PLAN.md — finished default/system/minimal layouts (logo or site name header, card, footer), Branding site name, CSS inlining via go-premailer with a per-layout opt-out, decision note superseding D-10
|
||||
|
||||
**Wave 7** *(gap closure, blocked on Wave 6 completion)*
|
||||
- [ ] 35-07-PLAN.md — unit tests for both gaps and `scripts/check-phase35.sh` with a read-only scratch-modfile consumers stage
|
||||
|
||||
Reference in New Issue
Block a user