docs(10.1-03): record plan progress in state and roadmap

This commit is contained in:
Jakub Zych
2026-09-29 02:28:56 +02:00
parent 29336a58ce
commit 0f6c10c4e3
2 changed files with 10 additions and 9 deletions

View File

@@ -474,7 +474,7 @@ Plans:
4. A controller registers named toolbar actions listed in `toolbar.buttons`; a click POSTs the action and toasts while `create` and `delete` keep their behaviour; unknown YAML keys, missing templates, unregistered actions and unknown permissions fail boot.
5. The Albums list shows a statistics strip scoped to the admin's collection, the Albums form shows a "Load from Discogs" widget whose stub fills Release year and Format, and a "Sync with Discogs" toolbar action toasts from its stub.
**Plans:** 2/4 plans executed
**Plans:** 3/4 plans executed
Plans:
@@ -485,7 +485,7 @@ Plans:
- [x] 10.1-02-PLAN.md — Framework SPA: plugin asset loader, WidgetField, PartialHost and PartialField, list-header slot, custom toolbar buttons, rebuilt dist (summercms.go/admin)
**Wave 3** *(blocked on Wave 2 completion)*
- [ ] 10.1-03-PLAN.md — Application: Albums stats strip, Discogs lookup widget stub, discogsSync toolbar stub, plugin assets and copy (fonoteka.go)
- [x] 10.1-03-PLAN.md — Application: Albums stats strip, Discogs lookup widget stub, discogsSync toolbar stub, plugin assets and copy (fonoteka.go)
**Wave 4** *(blocked on Wave 3 completion)*
- [ ] 10.1-04-PLAN.md — Unit tests last: Go and Vitest coverage, Albums acceptance, check-phase10.1.sh gate, security review and validation evidence (both repos)

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "10.1"
current_phase_name: Runtime admin extension point
status: executing
stopped_at: Completed 10.1-02-PLAN.md
last_updated: "2026-09-29T00:15:38.110Z"
stopped_at: Completed 10.1-03-PLAN.md
last_updated: "2026-09-29T00:28:50.771Z"
last_activity: 2026-09-28
last_activity_desc: Phase 10.1 execution started
state_head: 55c47ca3bc0d291c2eaa3fc2b80e9e934951a06a
state_head: 29336a58ceea13958efe0a0035a0fa5c48fcd25d
progress:
total_phases: 19
completed_phases: 9
total_plans: 78
completed_plans: 76
completed_plans: 77
milestone_name: milestone
---
@@ -29,7 +29,7 @@ See: .planning/PROJECT.md (updated 2026-09-16)
## Current Position
Phase: 10.1 (Runtime admin extension point) — EXECUTING
Plan: 3 of 4
Plan: 4 of 4
Status: Ready to execute
Last activity: 2026-09-28 — Phase 10.1 execution started
@@ -131,6 +131,7 @@ Progress: [██████░░░░] 60%
| Phase 10.2 P02 | 14m | 3 tasks | 20 files |
| Phase 10.1 P01 | 25min | 3 tasks | 33 files |
| Phase 10.1 P02 | 17 min | 3 tasks | 29 files |
| Phase 10.1 P03 | 11min | 3 tasks | 16 files |
## Accumulated Context
@@ -384,6 +385,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-09-29T00:15:37.740Z
Stopped at: Completed 10.1-02-PLAN.md
Last session: 2026-09-29T00:28:50.425Z
Stopped at: Completed 10.1-03-PLAN.md
Resume file: None