diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index 8ccca35..f95bfbb 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -843,7 +843,7 @@ Plans: 3. Cabana `markdown`/`mltext`/`mlmarkdown` compose; nested locale writes are not dropped; docs, OpenAPI, TS types and `boardwalk` `dist/` update in the same change. 4. Proof host `sm-grzybyfunkcjonalne-app` boots with user+translate; unit tests are the last plan. -**Plans:** 1/4 plans executed +**Plans:** 2/4 plans executed Plans: @@ -851,7 +851,7 @@ Plans: - [x] 14.2.1-01-PLAN.md — Plugin repo, `golem15_translate_*` schema, Locale, en/pl seed, Translator, surf Resolver **Wave 2** *(blocked on Wave 1 completion)* -- [ ] 14.2.1-02-PLAN.md — Translatable API, Locales admin, fixture save/read +- [x] 14.2.1-02-PLAN.md — Translatable API, Locales admin, fixture save/read **Wave 3** *(blocked on Wave 2 completion)* - [ ] 14.2.1-03-PLAN.md — Cabana markdown/ML fields, nested save, docs/OpenAPI/dist, proof host boot diff --git a/.planning/STATE.md b/.planning/STATE.md index cdb730b..785663d 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -4,16 +4,16 @@ milestone: v1.0 current_phase: 14.2.1 current_phase_name: Translate plugin status: executing -stopped_at: Completed 14.2.1-01-PLAN.md -last_updated: "2026-10-06T09:56:25.260Z" +stopped_at: Completed 14.2.1-02-PLAN.md +last_updated: "2026-10-06T10:22:58Z" last_activity: 2026-10-06 -last_activity_desc: 14.2.1-01 Task 1 sibling checkouts created; Task 2 Winter table contract pending -state_head: b2ce986604521234140adcc3d02226676435ee1e +last_activity_desc: 14.2.1-02 Translatable API and Locales admin +state_head: 44a8cbf progress: total_phases: 26 completed_phases: 12 total_plans: 129 - completed_plans: 126 + completed_plans: 127 milestone_name: milestone --- @@ -29,9 +29,9 @@ See: .planning/PROJECT.md (updated 2026-09-16) ## Current Position Phase: 14.2.1 (Translate plugin) — EXECUTING -Plan: 2 of 4 (14.2.1-01 Task 1 complete; Task 2 checkpoint) -Status: Paused at Task 2 Winter table contract decision -Last activity: 2026-10-06 — created sibling sm-translate-plugin and sm-grzybyfunkcjonalne-app checkouts +Plan: 2 of 4 complete; next 14.2.1-03 +Status: Ready for cabana markdown/ML fields and proof host boot +Last activity: 2026-10-06 — Translatable API, indexed lookup, and permissioned Locales admin Progress: [███████░░░] 67% @@ -181,6 +181,7 @@ Progress: [███████░░░] 67% | Phase 14.1 P01 | 90 | 4 tasks | 20 files | | Phase 14.1 P02 | 8 min | 3 tasks | 3 files | | Phase 14.2.1 P01 | 16 min | 3 tasks | 23 files | +| Phase 14.2.1 P02 | 15 min | 3 tasks | 21 files | ## Accumulated Context @@ -577,6 +578,8 @@ Recent decisions affecting current work: - [Phase 14.1]: Task 3 needed no parity_test.go change: 14.1-01 already set expectedPortedRoutes 175 and rewrote assertPortedMismatch — Corpus already recorded 175/175 passing 175 failing 0 unrecorded 0 pending 0 - [Phase 14.2.1]: Task 2 locked golem15-prefix: Go tables are golem15_translate_*; PHP pin keeps winter_translate_* out of Go DDL. - [Phase 14.2.1]: Sibling plugin go.mod replace is ../summercms.go so isolated D-16 go test passes; host mounts replace via go.work. +- [Phase 14.2.1]: MorphName is an import-stable string, never reflect.Type.String(); Translated applies D-11 fallback and TranslatedExact does not. +- [Phase 14.2.1]: Locales is HasAdminControllers plus HasNavigation (not HasSettings); Fillable excludes is_default/sort_order; makeDefault uses GORM Updates maps. ### Pending Todos @@ -629,6 +632,6 @@ Items acknowledged and carried forward from previous milestone close: ## Session Continuity -Last session: 2026-10-06T09:56:24.657Z -Stopped at: Completed 14.2.1-01-PLAN.md +Last session: 2026-10-06T10:22:58Z +Stopped at: Completed 14.2.1-02-PLAN.md Resume file: None