docs(14.2.1-04): complete translate tests, gate, and security review
Record the last-plan SUMMARY, closed high-threat review, validation sign-off, and 4/4 roadmap progress. Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
@@ -3,17 +3,17 @@ gsd_state_version: "1.0"
|
||||
milestone: v1.0
|
||||
current_phase: 14.2.1
|
||||
current_phase_name: Translate plugin
|
||||
status: executing
|
||||
stopped_at: Completed 14.2.1-03-PLAN.md
|
||||
last_updated: "2026-10-06T11:29:17Z"
|
||||
status: verifying
|
||||
stopped_at: Completed 14.2.1-04-PLAN.md
|
||||
last_updated: "2026-10-06T12:21:36Z"
|
||||
last_activity: 2026-10-06
|
||||
last_activity_desc: 14.2.1-03 cabana ML fields and proof host boot
|
||||
state_head: e3b3475
|
||||
last_activity_desc: 14.2.1-04 tests, phase gate, and security review
|
||||
state_head: ba6e436
|
||||
progress:
|
||||
total_phases: 26
|
||||
completed_phases: 12
|
||||
total_plans: 129
|
||||
completed_plans: 128
|
||||
completed_plans: 129
|
||||
milestone_name: milestone
|
||||
---
|
||||
|
||||
@@ -28,12 +28,12 @@ See: .planning/PROJECT.md (updated 2026-09-16)
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 14.2.1 (Translate plugin) — EXECUTING
|
||||
Plan: 3 of 4 complete; next 14.2.1-04
|
||||
Status: Ready for unit/integration tests
|
||||
Last activity: 2026-10-06 — Cabana markdown/ML fields, docs/dist, and proof host boot
|
||||
Phase: 14.2.1 (Translate plugin) — VERIFYING
|
||||
Plan: 4 of 4 complete
|
||||
Status: Ready for phase verification / UAT
|
||||
Last activity: 2026-10-06 — End-to-end tests, matrices, fail-closed gate, security review
|
||||
|
||||
Progress: [████████░░] 75%
|
||||
Progress: [██████████] 100%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
@@ -183,6 +183,7 @@ Progress: [████████░░] 75%
|
||||
| Phase 14.2.1 P01 | 16 min | 3 tasks | 23 files |
|
||||
| Phase 14.2.1 P02 | 15 min | 3 tasks | 21 files |
|
||||
| Phase 14.2.1 P03 | 5 min | 3 tasks | 40 files |
|
||||
| Phase 14.2.1 P04 | 51 min | 3 tasks | 22 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -582,6 +583,7 @@ Recent decisions affecting current work:
|
||||
- [Phase 14.2.1]: MorphName is an import-stable string, never reflect.Type.String(); Translated applies D-11 fallback and TranslatedExact does not.
|
||||
- [Phase 14.2.1]: Locales is HasAdminControllers plus HasNavigation (not HasSettings); Fillable excludes is_default/sort_order; makeDefault uses GORM Updates maps.
|
||||
- [Phase 14.2.1]: Task 2 locked grzyby-submodules: proof host is sm-grzybyfunkcjonalne-app with plugins/golem15/user and plugins/golem15/translate; host go.work replace points at ../summercms.go.
|
||||
- [Phase 14.2.1]: 14.2.1-04 security review was executor-self-performed (no gsd-security-auditor in this Cursor session); every cited TestName was re-run. Full cabana `-race` needs `-timeout 30m`. WhereIndex falls back to the host column when no index row matches (PHP transWhere).
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -634,6 +636,6 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-10-06T11:29:17Z
|
||||
Stopped at: Completed 14.2.1-03-PLAN.md
|
||||
Last session: 2026-10-06T12:21:36Z
|
||||
Stopped at: Completed 14.2.1-04-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue