docs(14-02): update state, roadmap and requirements after the plan

This commit is contained in:
Jakub Zych
2026-10-03 21:26:27 +02:00
parent f22c9144e6
commit 2ee97c62f6
4 changed files with 27 additions and 20 deletions

View File

@@ -25,7 +25,7 @@ Requirements for v1 (the Płytarium port). Each maps to roadmap phases. "User" b
- [x] **CLI-02**: Scaffolding commands generate a plugin, model, migration, command, job and admin controller with stubs that compile - [x] **CLI-02**: Scaffolding commands generate a plugin, model, migration, command, job and admin controller with stubs that compile
- [x] **CLI-03**: Migration commands run up, status, and roll back the last migration of a named plugin - [x] **CLI-03**: Migration commands run up, status, and roll back the last migration of a named plugin
- [ ] **CLI-04**: Plugins register recurring commands (daily or interval) that a scheduler runs in-process or via `summer schedule:run` - [ ] **CLI-04**: Plugins register recurring commands (daily or interval) that a scheduler runs in-process or via `summer schedule:run`
- [ ] **CLI-05**: Płytarium commands are ported: oauth-client (create, list without reprinting secrets, add redirect URIs, set scope ceiling), prune-notifications, reindex with drop-old-index flag - [x] **CLI-05**: Płytarium commands are ported: oauth-client (create, list without reprinting secrets, add redirect URIs, set scope ceiling), prune-notifications, reindex with drop-old-index flag
- [ ] **CLI-06**: Queue worker runs in-process or via `summer queue:work` - [ ] **CLI-06**: Queue worker runs in-process or via `summer queue:work`
### Internationalization and mail (I18N) ### Internationalization and mail (I18N)
@@ -86,8 +86,8 @@ Requirements for v1 (the Płytarium port). Each maps to roadmap phases. "User" b
### Background jobs (JOBS) ### Background jobs (JOBS)
- [ ] **JOBS-01**: River runs on the shared *sql.DB with riverdatabasesql for transactional enqueue and riverpgxv5 for LISTEN/NOTIFY; job outcomes (complete, fail, skip) are recorded and queryable through a job manager service - [ ] **JOBS-01**: River runs on the shared *sql.DB with riverdatabasesql for transactional enqueue and riverpgxv5 for LISTEN/NOTIFY; job outcomes (complete, fail, skip) are recorded and queryable through a job manager service
- [ ] **JOBS-02**: CSV import write job and Discogs match job (240 s timeout) are ported; the match job re-enqueues itself with a delay on a Discogs rate-limit error instead of failing the batch - [x] **JOBS-02**: CSV import write job and Discogs match job (240 s timeout) are ported; the match job re-enqueues itself with a delay on a Discogs rate-limit error instead of failing the batch
- [ ] **JOBS-03**: Wishlist digest coalesces notifications in a 30-minute window and deletes its queue row on completion - [x] **JOBS-03**: Wishlist digest coalesces notifications in a 30-minute window and deletes its queue row on completion
### Realtime (RT) ### Realtime (RT)
@@ -98,7 +98,7 @@ Requirements for v1 (the Płytarium port). Each maps to roadmap phases. "User" b
### Search (SRCH) ### Search (SRCH)
- [x] **SRCH-01**: Album documents sync to Typesense scoped by collection_id, behind a settings kill-switch, degrading gracefully when the DB or config is absent - [x] **SRCH-01**: Album documents sync to Typesense scoped by collection_id, behind a settings kill-switch, degrading gracefully when the DB or config is absent
- [ ] **SRCH-02**: The reindex command asserts zero documents with collection_id 0 before and after, and can drop the legacy index - [x] **SRCH-02**: The reindex command asserts zero documents with collection_id 0 before and after, and can drop the legacy index
### Integrations (INTG) ### Integrations (INTG)
@@ -179,7 +179,7 @@ Which phases cover which requirements. Updated during roadmap creation.
| CLI-02 | Phase 4 | Complete | | CLI-02 | Phase 4 | Complete |
| CLI-03 | Phase 5 | Complete | | CLI-03 | Phase 5 | Complete |
| CLI-04 | Phase 11 | Gaps Found | | CLI-04 | Phase 11 | Gaps Found |
| CLI-05 | Phase 14 | Pending | | CLI-05 | Phase 14 | Complete |
| CLI-06 | Phase 11 | Gaps Found | | CLI-06 | Phase 11 | Gaps Found |
| I18N-01 | Phase 4 | Complete | | I18N-01 | Phase 4 | Complete |
| I18N-02 | Phase 7 | Complete | | I18N-02 | Phase 7 | Complete |
@@ -222,13 +222,13 @@ Which phases cover which requirements. Updated during roadmap creation.
| API-08 | Phase 14 | Pending | | API-08 | Phase 14 | Pending |
| API-09 | Phase 15 | Pending | | API-09 | Phase 15 | Pending |
| JOBS-01 | Phase 11 | Gaps Found | | JOBS-01 | Phase 11 | Gaps Found |
| JOBS-02 | Phase 14 | Pending | | JOBS-02 | Phase 14 | Complete |
| JOBS-03 | Phase 14 | Pending | | JOBS-03 | Phase 14 | Complete |
| RT-01 | Phase 11 | Gaps Found | | RT-01 | Phase 11 | Gaps Found |
| RT-02 | Phase 11 | Gaps Found | | RT-02 | Phase 11 | Gaps Found |
| RT-03 | Phase 11 | Gaps Found | | RT-03 | Phase 11 | Gaps Found |
| SRCH-01 | Phase 11 | Complete | | SRCH-01 | Phase 11 | Complete |
| SRCH-02 | Phase 14 | Pending | | SRCH-02 | Phase 14 | Complete |
| INTG-01 | Phase 14 | Pending | | INTG-01 | Phase 14 | Pending |
| INTG-02 | Phase 14 | Pending | | INTG-02 | Phase 14 | Pending |
| ADMIN-01 | Phase 9 | Complete | | ADMIN-01 | Phase 9 | Complete |

View File

@@ -748,7 +748,7 @@ Plans:
6. Feedback submissions, widget config and the hide preference work (sitemap dropped for this application, D-14); the oauth-client, prune-notifications and reindex commands all run correctly. 6. Feedback submissions, widget config and the hide preference work (sitemap dropped for this application, D-14); the oauth-client, prune-notifications and reindex commands all run correctly.
`oauth-identities` GET/DELETE and token `GET /api/v1/fonoteka/me` stay pending in this phase (D-09, todo orphan-pending-routes). `oauth-identities` GET/DELETE and token `GET /api/v1/fonoteka/me` stay pending in this phase (D-09, todo orphan-pending-routes).
**Plans:** 1/6 plans executed **Plans:** 2/6 plans executed
Plans: Plans:
@@ -756,7 +756,7 @@ Plans:
- [x] 14-01-PLAN.md — Framework (summercms.go): fetchguard guarded client with TrustedMode and a code-only transport seam, tide upstream sidecars with an asserting replay fake and the `summer parity:upstream` recording proxy, the `sunscreen` redacting slog handler in generated mains, beachcomber IndexDropper/EnsureIndex; READMEs and docs; REQUIREMENTS/ROADMAP/PROJECT rewording (D-06, D-07, D-13, D-14) - [x] 14-01-PLAN.md — Framework (summercms.go): fetchguard guarded client with TrustedMode and a code-only transport seam, tide upstream sidecars with an asserting replay fake and the `summer parity:upstream` recording proxy, the `sunscreen` redacting slog handler in generated mains, beachcomber IndexDropper/EnsureIndex; READMEs and docs; REQUIREMENTS/ROADMAP/PROJECT rewording (D-06, D-07, D-13, D-14)
**Wave 2** *(blocked on Wave 1 completion)* **Wave 2** *(blocked on Wave 1 completion)*
- [ ] 14-02-PLAN.md — Discogs client with the Postgres UNLOGGED limiter and domain classes, real ReleaseFetcher, WR-02 locks, CSV match/import workers with write-service CSV variants, digest worker and mail, prune-notifications and reindex commands, row-edit pick parity cases - [x] 14-02-PLAN.md — Discogs client with the Postgres UNLOGGED limiter and domain classes, real ReleaseFetcher, WR-02 locks, CSV match/import workers with write-service CSV variants, digest worker and mail, prune-notifications and reindex commands, row-edit pick parity cases
**Wave 3** *(blocked on Wave 2 completion)* **Wave 3** *(blocked on Wave 2 completion)*
- [ ] 14-03-PLAN.md — Discogs routes: album and wishlist match/apply-release, albums/match, albums/import/discogs, token cover-price (AlbumCoverFetcher, host-locked), discogs-credential/test; inbound limiters; recordings with sidecars (165 ported) - [ ] 14-03-PLAN.md — Discogs routes: album and wishlist match/apply-release, albums/match, albums/import/discogs, token cover-price (AlbumCoverFetcher, host-locked), discogs-credential/test; inbound limiters; recordings with sidecars (165 ported)
@@ -828,7 +828,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 11.2. summercms.io Alpha 0.1 landing page on SummerCMS | 3/3 | In Progress| | | 11.2. summercms.io Alpha 0.1 landing page on SummerCMS | 3/3 | In Progress| |
| 12. Płytarium API — Collections and Albums | 5/5 | Complete | 2026-10-02 | | 12. Płytarium API — Collections and Albums | 5/5 | Complete | 2026-10-02 |
| 13. Płytarium API — wishlist, notifications, CSV, credentials, public routes | 6/6 | In Progress| | | 13. Płytarium API — wishlist, notifications, CSV, credentials, public routes | 6/6 | In Progress| |
| 14. Domain jobs and external integrations | 1/6 | In Progress| | | 14. Domain jobs and external integrations | 2/6 | In Progress| |
| 14.1. OAuth identities and fonoteka me routes (INSERTED) | 0/TBD | Not started | - | | 14.1. OAuth identities and fonoteka me routes (INSERTED) | 0/TBD | Not started | - |
| 15. Cutover | 0/TBD | Not started | - | | 15. Cutover | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: 14 current_phase: 14
current_phase_name: Domain jobs and external integrations current_phase_name: Domain jobs and external integrations
status: executing status: executing
stopped_at: Completed 14-01-PLAN.md stopped_at: Completed 14-02-PLAN.md
last_updated: "2026-10-03T18:03:25.034Z" last_updated: "2026-10-03T19:26:16.437Z"
last_activity: 2026-10-03 last_activity: 2026-10-03
last_activity_desc: Phase 14 execution started last_activity_desc: Phase 14 execution started
state_head: 7700c6da28cf98db6ff54a0965a2a4b9f195e984 state_head: f22c9144e67b54b5b16275430f47ea46392581e4
progress: progress:
total_phases: 22 total_phases: 22
completed_phases: 11 completed_phases: 11
total_plans: 118 total_plans: 118
completed_plans: 113 completed_plans: 114
milestone_name: milestone milestone_name: milestone
--- ---
@@ -29,7 +29,7 @@ See: .planning/PROJECT.md (updated 2026-09-16)
## Current Position ## Current Position
Phase: 14 (Domain jobs and external integrations) — EXECUTING Phase: 14 (Domain jobs and external integrations) — EXECUTING
Plan: 2 of 6 Plan: 3 of 6
Status: Ready to execute Status: Ready to execute
Last activity: 2026-10-03 — Phase 14 execution started Last activity: 2026-10-03 — Phase 14 execution started
@@ -167,6 +167,7 @@ Progress: [██████░░░░] 60%
| Phase 13 P05 | 34 min | 3 tasks | 53 files | | Phase 13 P05 | 34 min | 3 tasks | 53 files |
| Phase 13 P06 | 70 min | 3 tasks | 59 files | | Phase 13 P06 | 70 min | 3 tasks | 59 files |
| Phase 14 P01 | 25min | 5 tasks | 42 files | | Phase 14 P01 | 25min | 5 tasks | 42 files |
| Phase 14 P02 | 80 min | 4 tasks | 81 files |
## Accumulated Context ## Accumulated Context
@@ -507,6 +508,12 @@ Recent decisions affecting current work:
- [Phase 14]: 14-01: upstream sidecars refuse unmasked Authorization/X-Api-Key; multipart file parts stored as sha256 only - [Phase 14]: 14-01: upstream sidecars refuse unmasked Authorization/X-Api-Key; multipart file parts stored as sha256 only
- [Phase 14]: 14-01: generated mains call sunscreen.InstallDefault(os.Stderr) before compass.Load; sunscreen also redacts dashed sk- keys - [Phase 14]: 14-01: generated mains call sunscreen.InstallDefault(os.Stderr) before compass.Load; sunscreen also redacts dashed sk- keys
- [Phase 14]: 14-01: INTG-01/INTG-02/API-08/SRCH-02 stay Pending until 14-02..14-06 deliver them - [Phase 14]: 14-01: INTG-01/INTG-02/API-08/SRCH-02 stay Pending until 14-02..14-06 deliver them
- [Phase 14]: 14-02: ReleaseFetcher.FetchRelease takes the request's db and config and returns *csv.Map (stateless fetcher, no app captured at Boot)
- [Phase 14]: 14-02: Discogs pick cases use a separate csv-discogs seed state so existing csv fixtures keep alice without a token
- [Phase 14]: 14-02: every parity case replays through an upstream fake; no sidecar means an empty fake, so unrecorded vendor calls fail
- [Phase 14]: 14-02: digest worker mails only when its DELETE removed the queue row (once per window under races)
- [Phase 14]: 14-02: reindex prefixes both the album and the legacy items index with search.prefix
- [Phase 14]: 14-02: INTG-01 stays Pending until 14-03 mounts the Discogs routes
### Pending Todos ### Pending Todos
@@ -555,6 +562,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-10-03T18:03:24.486Z Last session: 2026-10-03T19:26:15.839Z
Stopped at: Completed 14-01-PLAN.md Stopped at: Completed 14-02-PLAN.md
Resume file: None Resume file: None

View File

@@ -81,7 +81,7 @@
{ {
"number": "14", "number": "14",
"name": "Domain jobs and external integrations", "name": "Domain jobs and external integrations",
"status": "pending" "status": "in_progress"
}, },
{ {
"number": "14.1", "number": "14.1",
@@ -99,5 +99,5 @@
"label": "Advance to the next step", "label": "Advance to the next step",
"reason": "Phase 14 of 22 · executing" "reason": "Phase 14 of 22 · executing"
}, },
"updated_at": "2026-10-03T18:03:20.151Z" "updated_at": "2026-10-03T19:26:09.725Z"
} }