docs(19.4.1): record phase planned

This commit is contained in:
2026-10-20 03:33:29 +02:00
parent 2b5f0b2c92
commit 31764c8d8c
2 changed files with 7 additions and 7 deletions

View File

@@ -641,7 +641,7 @@ All four were answered by the user on 2026-10-20 and recorded in CONTEXT.md.
1. **"By mail" for contact submissions (D-04).** RESOLVED: a G15Office task is enough; no mail is sent (D-04 revised; plan 03 adds no mailer).
- Known: feedback stores the submission (admin list) and files a G15Office task; it never mails. The demo mail driver is `log`.
- Unclear: whether a g15office task satisfies "by mail", and SMTP credentials for rome.
- Recommendation: configure the G15Office sync for the demo, plus a small `golem15.demo` listener or job that mails the operator. Mail on submission in the shared plugin would need a v0.1.1 tag and SMTP config. Ask the user in plan 2.
- ~~Superseded by the resolution above.~~ Original recommendation: configure the G15Office sync for the demo, plus a small `golem15.demo` listener or job that mails the operator. Mail on submission in the shared plugin would need a v0.1.1 tag and SMTP config. Ask the user in plan 2.
2. **Repository visibility and creation.** RESOLVED: both repositories are private (D-21).
- `tea repos create --owner golem15 --name <repo>` is the precedent (19.5-02-PLAN Task 5; `tea` 0.16.0 is logged in as `jakub`).
- Unclear: are sm-demo-app and vue-demo-app private (19.5 default) or public (showcase)?