docs(19.1-02): complete forum tracer plan

This commit is contained in:
Jakub Zych
2026-10-18 15:43:18 +02:00
parent 1f204f5a6c
commit 374088eccf
5 changed files with 287 additions and 14 deletions

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "19.1"
current_phase_name: Chat satellites
status: executing
stopped_at: Completed 19.1-05-PLAN.md
last_updated: "2026-10-18T12:55:02.551Z"
stopped_at: Completed 19.1-02-PLAN.md
last_updated: "2026-10-18T13:42:14.977Z"
last_activity: 2026-10-18
last_activity_desc: "Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked"
state_head: 98bc6de8f57fda4bd3ccc1880ba22b9ce1d6582a
state_head: 1f204f5a6c2d2289d434105e0e22f94693ae5705
progress:
total_phases: 41
completed_phases: 33
total_plans: 204
completed_plans: 202
completed_plans: 203
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-12)
## Current Position
Phase: 19.1 (Chat satellites) — EXECUTING
Plan: 4 of 6
Plan: 5 of 6
Status: Ready to execute
Last activity: 2026-10-18 — Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked
@@ -255,6 +255,7 @@ Progress: [████████░░] 80%
| Phase 19.1 P19.1-03 | 7 min | 3 tasks | 32 files |
| Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files |
| Phase 19.1-chat-satellites P19.1-05 | 10min | 4 tasks | 37 files |
| Phase 19.1 P19.1-02 | 9 min | 4 tasks | 36 files |
## Accumulated Context
@@ -863,6 +864,9 @@ Recent decisions affecting current work:
- [Phase 19.1]: Locked D-02 baseline id 202610180001_create_golem15_chatvideo_baseline and D-05 prefix /_chatvideo/api/v1; remote policy follows plan 01 proceed-and-push — These names land in adopting apps and published clients.
- [Phase 19.1]: tea repos create --owner golem15 --name sm-chatvideo-plugin succeeded; main pushed at 38179b5 (never force). summercms.go was not pushed. — Remote policy is proceed-and-push after Task 4 green.
- [Phase 19.1]: After APIs exist, execute should run the security-review agent (CONTEXT). This execute did not spawn it. — CONTEXT discretion; planner and execute both refuse to spawn the reviewer.
- [Phase 19.1]: Task 2 reply verbatim: proceed — Human locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1 before the sibling repo existed. Remote policy follows plan 01 proceed-and-push.
- [Phase 19.1]: Locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1; remote policy follows plan 01 proceed-and-push — Continuation recorded the lock from the human proceed reply; Task 1 and Task 2 were not re-asked.
- [Phase 19.1]: tea repos create --owner golem15 --name sm-forum-plugin succeeded; main pushed at 6a40030 (never force). summercms.go was not pushed. — Plan 01 remote policy proceed-and-push; tea-create only after Task 4 green.
### Pending Todos
@@ -946,6 +950,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-10-18T12:02:32.177Z
Stopped at: Completed 19.1-05-PLAN.md
Last session: 2026-10-18T13:41:50.737Z
Stopped at: Completed 19.1-02-PLAN.md
Resume file: None